UINFORCING STEEL PLACEMENT
Report Date: May 5, 2015 Test Date: April 29, 2015
Client: City of Coppell General Report No.: 119
Project Freeport Parkway Project No.: 214-144
Identification Reinforcing Steel Observation
Method of Test Visual Observation
Page 1 of 1
Results
On April 29, 2015 reinforcing steel was observed at the following locations:
Pier Lights (STA 25+50 to STA 36+15) P1 -P7
The following discrepancies were noted and called to the attention of Javier, a representative of Mel's Electric LP.
1) Use rebar support.
2) Clean rebar.
The above discrepancies were corrected as noted.
Technician: CP
cc: Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov
Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpina.com
Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com
GEE Consultants, Inc TBPE Firm: F-3212 Reviewed by: ,1,'`"
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc The use of
our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently
identical or similar products.
-INICAL ENGINEERING
VIRONMENTAL CONSULTING
• CONSTRUCTION MATERIALS TESTING
GEE Consultants, Inc.
10046 Monroe Drive 0 Dallas, Texas 75229 • (214) 352-5433 Fax (214) 352-6972
REINFORCING STEEL PLACEMENT
Report Date: May 5, 2015
Client: City of Coppell
Project Freeport Parkway
Identification Reinforcing Steel Observation
Method of Test Visual Observation
Test Date: April 29, 2015
General Report No.: 120
Project No.: 214-144
Page 1 of 1
Results
On April 29, 2015 reinforcing steel was observed at the following locations:
Decel lane, Northbound STA.
Bike trail STA.
The following discrepancies were noted and called to the attention of Antonio, a representative of CD Builders.
1) Clean area.
2) Supplemented with rebar support.
3) They need to install rebar connection for next pouring.
The above discrepancies were corrected as noted.
Technician: CP
cc: Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelitx.gov
Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com
Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com
GEE Consultants, Inc TBPE Firm: F-3212 Reviewed by: (
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval o GEE Consultants Inc The use of
s
our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantifies of apparently
identical or similar products.
• GEOTECHNICAL ENGINEERING
• ENVIRONMENTAL CONSULTING
E ( • CONSTRUCTION MATERIALS TESTING
GEE Consultants, Inc.
10046 Monroe Drive • Dallas, Texas 75229 • (214) 352-5433 • Fax (214) 352-6972
REINFORCING STEEL PLACEMENT
Report Date: May 5, 2015 Test Date: April 30, 2015
Client: City of Coppell General Report No.: 121
Project Freeport Parkway Project No.: 214-144
Identification Reinforcing Steel Observation
Method of Test Visual Observation
Page 1 of 1
Results
On April 30, 2015 reinforcing steel was observed at the following locations:
Sidewalk 50'N. of Wagon Wheel park entrance.
There were no discrepancies.
Technician: BT
cc: Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov
Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com
Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com
GEE Consultants, Inc. TBPE Firm: F-3212 I Reviewed by: e. -...—
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of—GETof—GET Consultants, Inc. The use of
our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently
identical or similar products.
7 • GEOTECHNICAL ENGINEERING
E •ENVIRONMENTAL CONSULTING (SEE Consultants, Inc`.
E • CONSTRUCTION MATERIALS TESTING
10046 Monroe Drive Dallas, Texas 75229 • (214) 352-5433 0 Fax (214) 352-6972
REINFORCING STEEL PLACEMENT
Report Date: May 5, 2015
Client: City of Coppell
Project Freeport Parkway
Identification Reinforcing Steel Observation
Test Date: May 1, 2015
General Report No.: 122
Project No.: 214-144
Method of Test Visual Observation
Page 1 of 1
Results
On May 1, 2015 reinforcing steel was observed at the following locations:
Decel lane, in front of 300 Freeport Pkwy. Southbound.
There were no discrepancies.
Technician: BT
cc: Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov
Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com
Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com
GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by:/ " --
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of
our name must receive our prior written approval. Our tetters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently
identical or similar products.