ST0502A- LR150507• GEOTECHNICAL ENGINEERING
• ENVIRONMENTAL CONSULTING
E I • CONSTRUCTION` MATERIALS TESTING
1, 111�!1111 qiiiiiiqiii l 1��!
10046 Monroe Drive Dallas, Texas 75229 (214) 342-5433 Fax (214) 352-6972
1-5POROF CONCRETE MIX OBSERVATION
Report Date: May 7, 2015 Date Concrete Placed: Apri 6, 2015 Standard 6"xI2" Cylinders
Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches
Project: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. Concrete Report No.: 159
Contractor: CD Builders Inc. Project No.: 214-0144
Concrete: Supplier and Plant: Argos I I I
Location of Placement: Bridge- Slab 1/2 (Median); Stage 2- YN of Abutment 1.
MATERIALS
Source t
Description
SSD Batch Wts. OBSERVA�10N DATA
(Lbs/CuYd)
Date
Tested
Mix Number:
1251
a
Time Sample atched:
8:55 AM
Cement:
7
Time Sampled:
9:35 PM
Fly Ash:
Sample Locati
Bridge- Slab 1/2 (Median);
28
5/4/15
150,160
Stage 2- 5'N of Abutment 1.
Coarse Aggregate:
FPP 635
Truck / Ticket o:
3041/1594351
Intermediate Aggregate:
135,240
Temperature:
Fine Aggregate:
Alent Range:
I
Am
68 O F
Admixtures:
Con rete Range:
72 OF
I
Cylin rs Made By: CP
Slump Ran ( nches):
5.0
2
Weather Condi ions:
Cloudy
Added Water:
0
Time Started:
7:00 AM
Time Completed:
6:00 PM
Sample Air Co itent
4.2
Total Cubic Y rds Placed:
10
Rprinirpti qt-rtp-.n th (l.hq /-n-in-)- 4000
Specimen
Number
Measured
Slump (in.)
Age
(Days)
Date
Tested
Total Load
(Lbs.)
Compr ssive Strength
(t./Sq.ln.)
Remarks
FPP 633
7
4/13/15
116,240+
4,110+
FPP 634
28
5/4/15
150,160
5,310
FPP 635
5.0
28
5/4/15
135,240
4,780
FPP 636
H
Hold
Test Methods Utilized
Fracture Regular
Cylin rs Made By: CP
ASTM C-31, 1
Unless Noted Otherwise)
Remarks and/or Distribution:- None
cc: Rick Odell <ROdell@coppelltx.gov>
Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MG rza@coppelltx.gov
Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E -m il: mholmes@tnpinc.com
Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E -ma 1: fluyando@cdbuilderspr.com
GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by:,
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced w4hout the full approval of GEE Consultants, Inc. The use of our name must
receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.
GEOTECHNICAL ENGINEERING
• ENVIRONMENTAL CONSULTING GEE (..onsultants, Inc.
-CONSTRUCTION MATERIALS TESTING
10046 Monroe Drive Dallas, 'Texas 75229 0 (214) 342-5433 0 Fax (214) 352-6972
REPORT OF CONCRETE MIX OBSERVATION �
Report Date: May 7, 2015 Date Concrete Placed: April 6, 2015 Standard 6"xI2" Cylinders
Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches
Project: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. Concrete Report No.: 160
Contractor: CD Builders Inc. Project No.: 214-0144
Concrete Supplier and Plant: Argos 11 I
Location of Placement: 'h Slab (Median); Bridge Stage 2- 30' S of Abutment 4.
MATERIALS
Source /
Description
SSD Batch Wts. OBSERVATION DATA
(Lbs/CuYd)
Date
Tested
Mix Number:
1251
Time Sample Btched:
12:40 PM
Cement:
7
Time Samp 'ed*oc
1:15 PM
Fly Ash:
Sample La 10 ti
Y2 Slab (Median); Bridge
Coarse Aggregate:
5/4/15
128,460
Stage 2- 30' S of Abutment 4.
Intermediate Aggregate:
FPP 639
Truck /Ticket o:
7072/1594566
5/4/15
136,240
Temperature*
Fine Aggregate:
Ambient Range:
79 OF
Admixtures:
Conrete Range:
80 OF
I
Cylind rs Made By: CP
Slump Range (i ches):
4.5
2
Weather Conditions:
Mostly Cloudy
Added Water:
0
Time Started:
7:00 AM
Time Complete
6:00 PM
Sample Air Co tent (%):
3.8
Total Cubic Y ds Placed:
110
Rpnnirp,d qtrens th (I.h-, /qn-in-)-
4000
Specimen
Number
Measured
Slump (in.)
Age
(Days)
Date
Tested
Total Load
(Lbs.)
Comprssive Strength.
(Ls./Sq.ln.)
Remarks
FPP 637
7
4/13/15
114,660
4,060
FPP 638
28
5/4/15
128,460
4,540
FPP 639
4.5
28
5/4/15
136,240
4,820
FPP 640
H
Hold
I
I
Test Methods Utilized
Fracture Regular
Cylind rs Made By: CP
ASTM C-31, C-39, C-143
(Unless Noted Otherwise)
Remarks and/or Distribution:- None
cc: Rick Odell <ROdell@coppelltx.gov>
Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail:
Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via
Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via I
GEE Consultants, Inc. T13PE Firm: F-3212
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced
receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not
: mholmes@tnpinc.com
fluyando@cdbuilderspr.com
1X111VII-Tv"A ".Y. % ,1jr I
the full approval of GEE Consultants, Inc. The use of our name must
ily indicative of the quantities of apparently identical or similar products.
• GEOTECHNICAL ENGINEERING
E•
ENVIRONMENTAL CONSULTING
E E•
CONSTRUCTION MATERIALS TESTING
Monsultants, Inc.
t
10046 Monroe Drive • Dallas, Texas 75229 0 (214) 312-5433
REPORT OF CONCRETE MIX OBSERVATION �
• Fax (214) 352-6972
Report Date: May 7,'2015 Date Concrete Placed: April 6, 2015 Standard 6"xl2" Cylinders
Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches
Project: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. Concrete Report No.: 161
Contractor: CD Builders Inc. Project No.: 214-0144
Concrete Supplier and Plant: Argos 110
Location of Placement: Pavement North -bound Decel Lane STA.
MATERIALS Source / SSD Batch Wts. OBSERVATION DATA
Description (Lbs/CuYd)
Mix Number: 1273
Time Sample atched:
a
3:05 PM
Cement:
Time Sampled:
3:40 PM
Fly Ash:
n
Sample Locatin:
Pavement North -bound Decel
Coarse Aggregate:
4/13/15
Lane STA
Intermediate Aggregate:
Truck / Ticket o:
6238/1594656
Fine Aggregate:
Temperature
5/4/15
141,080+
I
Am tent Range:
83 OF
Admixtures:
Con rete Range:
84 OF
I
Slump Range nches):
3.5
2
Weather Condi ions:
Mostly Cloudy
Added Water: 0
Time Started:
7:00 AM
Time Completc d:
6:00 PM
Fracture Regular
Sample Air Co itent (%):
3.8
(Unless Noted Otherwise)
Total Cubic Yards Placed:
20
Required Strenirth (Lbs./go-in-):
1600
Specimen
Number
Measured
Slump (in.)
Age
(Days)
Date
Tested
Total Load
(Lbs.)
Comprssive Strength
(Ls./Sq.ln.)
Remarks
FPP 641
7
4/13/15
70,720
2,500
FPP 642
3.5
28
5/4/15
141,080+
4,990+
FPP 643
28
5/4/15
136,440+
4,830+
FPP 644
H
I Hold
Test Methods Utilized
Fracture Regular
Cylind rs Made By: CP
I
ASTM C-31, C-39, C-143
(Unless Noted Otherwise)
Remarks and/or Distribution:- None
cc: Rick Odell <ROdell@coppelltx.gov>
Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail:
Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via
Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via I
GEE Consultants, Inc. TBPE Firm: F-3212
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced
receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not
: mholmes@tnpinc.com
fluyando@cdbuilderspr.com
Reviewed by:
the full approval of GEE Consultants, Inc. The use of our name must
rily indicative of the quantifies of apparently identical or similar products.
• GEOTECHNICAL ENGINEERING
- ENVIRONMENTAL CONSULTING
JE GEE
E -CONSTRUCTION MATERIALS TESTING
10046 Monroe Drive Dallas, Texas 75229 0 (214)3
0 - - k.14111
3 Fax (214) 352-6972
Report Date: May 7, 2015 Date Concrete Placed: April 8, 2015 Standard 6"x12" Cylinders
Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches
Project: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. Concrete Report No.: 162
Contractor: CD Builders Inc. Project No.: 214-0144
Concrete Supplier and Plant: Argos 110
Location of Placement: Decel Lane- North Bound STA. 34+00 to 36+40
MATERIALS
Source / SSD Batch Wts.
Description (Lbs/CuYd)
OBSERVA ION DATA
Date
Tested
Mix Number:
0100000001273
Time Sample Patched:
N/A
Cement:
7
Time Sampled:
9:20 AM
Fly Ash:
Sample Locatio
Decel Lane- North Bound
28
5/6/15
135,880+
STA. 34+00 to 36+40
Coarse Aggregate:
FPP 647
Truck / Ticket o:
3552/01595773
Intermediate Aggregate:
142,200+
Temperature:
Fine Aggregate:
Am fent Range:
76 OF
Admixtures:
Con rete Range:
75 OF
I
Cylind rs Made By: RA
I
Slump Range (i ches):
5.0
2
Weather Condi ions:
Cloudy
Added Water:
0
Time Started:
7:30 AM
Time Complete
5:00 PM
Sample Air Co tent
3.3
Total Cubic ds Placed:
40
_'4 Qf—ith (I he len in )-
D- -
1A0171
Specimen
Number
Measured
Slump (in.)
Age
(Days)
Date
Tested
Total Load
(Lbs.)
Cornprssive Strength
(L)s./Sq.1n.)
Remarks
FPP 645
7
4/15/15
127,600+
4,510+
FPP 646
28
5/6/15
135,880+
4,810+
FPP 647
4.0
28
5/6/15
142,200+
5, +
FPP 648
H
Hold
Test Methods Utilized
Fracture Regular
Cylind rs Made By: RA
I
ASTM C-31, C-39, C-143
(Unless Noted Otherwise)
Rcmarks and/or Distribution:- None
cc: Rick Odell <ROdell@coppelltx.gov>
Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail:
Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via
Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via I
GEE Consultants, Inc. TBPE Firm: F-3212
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced
receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not
: mholmes@tnpinc.com
fluyando@cdbuilderspr.com
Reviewed by:
full approval of GEE Consultants, Inc. The use of our name must
indicative of the quantities of apparently identical or similar products.
—_ I
G I . GEOTECHNICAL ENGINEERING
E I -ENVIRONMENTAL CONSULTING
*CONSTRUCTION MATERIALS TESTING
10046 Monroe Drive Dallas, Texas 75229 0 (214) 3512-5433 0 Fax (214) 352-6972
REPORT OF CONCRETE MIX OBSERVATION
Report Date: May 7, 2015 Date Concrete Placed: April 8, 2015 Standard 6"xI2" Cylinders
Client:
City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. Concrete Report No.: 163
Contractor: CD Builders Inc. Project No.: 214-0144
Concrete Supplier and Plant: Argos 110
Location of Placement: Decel Lane- North Bound STA. 24+50 to 25+80 & Inlet (urbe STA. 7+00 to South Bound
I -
/
MATERIALS Source Descripti
Mix Number: 1273
Cement:
Fly Ash:
Coarse Aggregate:
Intermediate Aggregate:
Fine Aggregate:
Admixtures:
1
2
Added Water: 0
SSD Batch
(Lbs/CuYd) I Wts. I
OBSERVATION DATA
Specimen
Number
Measured
Slump (in.)
Age
(Days)
Date
Tested
FPP 649
7
4/15/15
FPP 650 4.0
28
5/6/15
IFPP 651
28
5/6/15
EPP 652
H
Hold
Test Methods Utilized
Fracture Regular
ASTM C-31, C-39, C-143
(Unless Noted Other"
Remarks and/or Distribution:- None
Cloudy
Time Sample I
Time Sampled:
Sample Locatil:
Truck / Ticket
Temperature:
Slump Range (
Weather Condi
Time Started:
Time Complett
Sample Air Cc
Total Cubic Y
Total Load
(Lbs.)
127,860
135,340
138,580
ached:
11:15 AM
12:30 PM
Decel Lane- North Bound
STA. 24+50 to 25+86 & Inlet
Curbe STA. 7+00 to South
Bound
o:
4035/01595996
ent Range:
74 OF
-ete Range:
75 OF
fiches):
5.0
ons:
Cloudy
7:30 AM
5:00 PM
tent
3.7
ds Placed:
100
th (Lbs./s .in.): 3600
sive Strength
I
Remarks
s./Sq.1n.)
4,520
4,790
4,900
Made By: RA
cc: Rick Odell <ROdell@coppelltx.gov>
Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: M rza@coppelltx.gov
Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E -m il: mholmes@tnpinc.com
Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E -ma 1: fluyando@cdbuilderspr.com
GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed b
;;d shall not be reproduced w diout the full approval of GEE Consultants, Inc. The use of our name must
All letters and reports are for me exclusive use of the client to whom they are addressed arently identical or similar products.
receive our prior written approval. our letters and reports apply only to the sample tested and/or observed and are not n cessarily indicative of the quantities of app,
GEOTECHNICAL ENGINEERING
E - ENVIRONMENTAL CONSULTING GEE
E I -CONSTRUCTION MATERIALS TESTING
a
10046 Monroe Drive Dallas, Texas 75229 (214) 3�2-5433 0 Fax (214) 352-6972
REPORT OF CONCRETE MIX OBSERVATION
Report Date: May 7, 2015 Date Concrete Placed: Apri� 1 9, 2015 Standard 6"xl2" Cylinders
Client: City of Coppell j Cylinder Cross-sectional Area: 28.27 Square Inches
Project: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. i Concrete Report No.: 164
Contractor: CD Builders Inc. Project No.: 214-0144
Concrete Supplier and Plant: Argos 110
Location of Placement: Pavement Driveway -6; Column Rail Post Bridge; Stage
MATERIALS Source / SSD Batch Wts. OBSERVATION DATA
Description (Lbs/CuYd)
Mix Number:
Cement:
Fly Ash:
Coarse Aggregate:
Intermediate Aggregate:
Fine Aggregate:
Admixtures:
1
2
Added Water:
1273 Time Sample B; I itched:
10:38 AM
Time Sampled:
11:30 AM
Sample Location:
Pavement Driveway. -6;
Remarks
Column Rail Post Bridge;
Stage 2
Truck / Ticket0:
�
5038/1596857
Temperature:
Amb ent Range:
76 OF
Cone ete Range:
80 OF
Slump Range (i ches):
4.5
0 Weather Condit ons:
Cloudy
Time Started:
10:00 AM
Time Complete
2:00 PM
Sample Air Con ent
1
3.4
Total Cubic Yar s Placed:
10
V.—;—A Q+-- 1, IT t- /__ :_
X. ')LAA
Specimen
Number
Measured
Slump (in,)
Age
(Days)
Date
Tested
Total Load
(Lbs.)
Compre sive Strength
(Lbt/Sq.ln.)
Remarks
EPP 653
7
4/16/15
126,220
460
EPP 654
45
28
5/7/15
152,340
390
EPP 655
.
28
5/7/15
162,660
750
EPP 656
H
Hold
Test Methods Utilized
Fracture Regular
ASTM C-31, C-39, C-143
(Unless Noted Otherwise)
T3 linderMade By: CP
�
KemarKs and/or Distribution:- None
cc: Rick Odell <ROdell@coppelltx.gov>
Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGara@coppelltx.gov
Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mailmholmes@tnpinc.com
Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: uyando@cdbuilderspr.com
GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by:
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced witlumt the full approval of GEE Consultants, Inc, The use of our name must
receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not neces ly indicative of the quantities of apparently identical or similar products.
G
• GEOTECHNICAL ENGINEERING
E -ENVIRONMENTAL CONSULTING GEE onsultants, Inc.
• CONSTRUCTION MATERIALS TESTING
10046 Monroe [Drive Dallas, Texas 75229 0 (214) 3 2-5433 0 Fax (214) 352-6972
REPORT OF CONCRETE MIX OBSERVATION
Report Date: May 7, 2015 Date Concrete Placed: April279, 2015 Standard 6.12- Cylinders
Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches
Project: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. Concrete Report No.: 183
Contractor: Mels Electric CP Project No.: 214-0144
Concrete Supplier and Plant: LMC
Location of Placement: Pier Lights- PI to P7. STA 25+50 to STA 36+15.
MATERIALS
Source /
Description
SSD Batch Wts. OBSERVATION DATA
(Lbs/CuYd)
Date
Tested
Mix Number:
4045BL
Time Sample B tched:
11:34 AM
Cement:
7
Time Sampled-
12:15 PM
Fly Ash:
Sample Locatio
Pier Lights- PI to P7. STA
Coarse Aggregate:
5/27/15
25+50 to STA 36+15.
Intermediate Aggregate:
Truck / Ticketo:
5029 /63090606
Fine Aggregate:
Temperature:
Admixtures:
Amb ent Range:
70 OF
I
Conc ete Range:
76 OF
H
Slump Range (i ches):
5.0
2
Weather Condit'
Sunny
Added Water:
0
Time Started: 1
7:00 AM
Time Completec:
3:30 PM
Sample Air Con -.ent
3.4
Total Cubic Yards Placed:
12.5
RpnidrPt'l 'Ztrpna h (T he len in b
AMA
Specimen
Number
Measured
Slump (in.)
Age
(Days)
Date
Tested
Total Load
(Lbs.)
Compresive Strength
(Lbt/Sq.ln.)
Remarks
FPP 705
7
5/6/15
105,840
3,740
FPP 706
28
5/27/15
5.0
FPP 707
28
5/27/15
FPP 708
H
Hold
Test Methods Utilized
Fracture Regular
ASTM C-31, C-39, C-143
(Unless Noted Otherwise)
Cylinder Made By: CP
I
Remarks and/or Distribution:- None
cc: Mr. Rick Odell - City of Coppell via E-mail: ROdell@coppelltx.gov I
Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGar a@coppelltx.gov
Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail mholmes@tnpinc.com
Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com
I
GEE Consultants, Inc. TBPE Firm: F-3212
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced
receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not
Af
Reviewed by:
the full approval of GEE Consultants, Inc. The 777bur name must
ily indicative of the quantities of apparently identical or similar products.
* GEOTECHNICAL ENGINEERING
E - ENVIRONMENTAL CONSULTING
7E -CONSTRUCTION MATERIALS TESTING
=� I , 11111111
11 Tfil 1111111]l 1 1
10046 Monroe Drive
Dallas, Texas 75229
•�(214) �32-7433
Fax (214) 352-6972
REPORT OF CONCRETE MIX OBSERVATION
Compres ive Strength
(Lbit/Sq.1n.)
Report Date:
May 7, 2015 Date Concrete
Placed: April 30, 2015
Standard 6"xl2" Cylinders
Client:
City of Coppell
Cylinder Cross-sectional Area: 28.27 Square Inches
Project:
Freeport Pkwy from Ruby Rd. to Sandy
Lake Rd.
Concrete Report No.: 186
Contractor:
CID Builders Inc.
Project No.: 214-0144
Concrete Supplier and Plant,-
Argos #I 10
Location of Placement:
Pavement / Sidewalk
FPP 711
MATERIALS
Source SSD Batch Wts.
Description (Lbs/CuYd)
OBSERVAT ON DATA
Mix Number:
1273
Time Sample B tched:
11:10 AM
Cement:
Hold
Time Sampled:
12:00 PM
Fly Ash:
Test Methods Utilized
Sample Locatior:
150'N. of Park Entrance,
Coarse Aggregate:
(Unless Noted Otherwise)
Cylinder Made By: BTi
S. Bound
Intermediate Aggregate:
Truck / Ticket0:
�
5039 /1606384
Fine Aggregate:
Temperature:
Admixtures:
Ambilent Range:
77 OF
I
Conc�ete Range:
80 OF
Slump Range (i ches):
2.5
2
Weather Conditions:
Partly Cloudy
Added Water:
0
Time Started- 1
10:00 AM
Time Completed:
3:15 PM
Sample Air Con,�ent
3.75
Total Cubic s Placed:
30
Qti (1 1— / ;_ N.
lKnn
Specimen
Number
Measured
Slump (in,)
Age
(Days)
Date
Tested
Total Load
(Lbs.)
Compres ive Strength
(Lbit/Sq.1n.)
Remarks
FPP 709
7
5/7/15
117,460
4,150
FPP 710
28
5/28/15
2.5
FPP 711
28
5/28/15
FPP 712
H
Hold
Test Methods Utilized
Fracture Regular
ASTM C-31, C-39, C-143 1
(Unless Noted Otherwise)
Cylinder Made By: BTi
Remarks and/or Distribution:- None
cc: Mr. Rick Odell - City of Coppell via E-mail: ROdell@coppclltx.gov
Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGar, a@coppelltx.gov
Mn Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail mholmes@tnpinc.com
Mr, Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: luyando@cdbuilderspr.com
GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed bv:
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced witho the full approval of GEE Consultants, Inc. The use of our name must
receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necess ly indicative of the quantities of apparently identical or similar products
# GEOTECHNICAL ENGINEERING
E - ENVIRONMENTAL CONSULTING
L:E] -CONSTRUCTION MATERIALS TESTING
10046 Monroe Drive
• Dallas, Texas 75229
I
0 (214)3 2-5433 0 Fax (214) 352-6972
REPORT OF CONCRETE MIX OBSERVATION
Report Date: May 7,'2015 Date Concrete Placed: Apri 30, 2015 Standard 6NI2' Cylinders
Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches
Project: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. Concrete Report No.: 187
Contractor: Mels Electric, LP Project No.: 214-0144
Concrete Supplier and Plant: LMC #950
Location of Placernent: Light Piers
MATERIALS Source /
Description
SSD Batch Wts. OBSERVATION DATA
(Lbs/CuYd)
Age
(Days)
Mix Number:
Time Sample Bitched:
12:30 PM
Cement:
Time Sampled:
1:45 PM
Fly Ash:
Sample Locatio i:
Median 100' NE. of Park
Coarse Aggregate:
Entrance
Intermediate Aggregate:
Truck / Ticket o:
9102 /62508922
Fine Aggregate:
Temperature:
Admixtures:
Am ent Range:
80 OF
Con rete
e Range:
86 OF
Slump Range (inches):
2.5
2
Weather Condit
on di 11l'ons:
Partly Cloudy
Added Water: 0
Time Started:
10:00 AM
Time Complete3:15
PM
Sample Air Co tent
3.0
Test Methods Utilized
Total Cubic Ya ds Placed:
6
ASTM C-31, C-39, C-143
D- - Q JA, /T t- I—
-A �
AAA/
Specimen
Number
Measured
Slump (in.)
Age
(Days)
Date
Tested
Total Load
(Lbs.)
Compre sive Strength
(L s./Sq.1n.)
Remarks
FPP 713
7
5/7/15
99,820
3,530
FPP 714
28
5/28/15
2.5
FPP 715
28
5/28/15
FPP 716
H
Hold
Test Methods Utilized
Fracture Regular
ASTM C-31, C-39, C-143
(Unless Noted Otherwise)
FCylinde s Made By: BT
Kerriarks and/or Distribution:- None
cc: Mr. Rick Odell - City of Coppell via E-mail: ROdell@coppelltx.gov
Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: Mkh. a@coppelltx.gov
Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E -mai: mbolmes@tnpinc.com
Mr. Francisco Luyando - CDI Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com
GEE Consultants, Inc. TBPE Firm: F-3212
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced
receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not
Reviewed by: t,,_/ ,
.1 approval of GEE Consultants, Inc. The use of our name must
licative of the quantities of apparently identical or similar products.