Loading...
ST0502A- LR150420 (3)• GEOTECHNICAL ENGINEERING GEE Consulants 1 Inc. • ENVIRONMENTAL CONSULTING j j * CONSTRUCTION MATERIALS TESTING 1 1,)046 kionroe Drive " Dallas, Texas 75229 • (214) 352-5433 • Fax (214) 352-6972 GENERAL REPORT'' SIEVE ANALYSIS Report Date: April 20, 2015 Test Date: March 19, 2015 Client: City of Coppell General Report No.: 10 Project: Freeport Pkwy Project No: 214-144 Identification: Sieve Analysis of Road Mixed Material (cement treated/Lime Treated) Method of Test: TEX-101' E (Sieve Analysis of Road Mixed Stabilized Material) Specification: Tex -DOT Item 260AD-2004 (Gradation Requirements for Lime Treated Material) Tex -DOT Item 275AD-2004 (Gradation Requirements for Cement Treated Material) Page 1 of 1 Results Technician: cc: Mr. Rick 0 Dell.. City of Coppell Via E -Mail: RODell@Coppelltx.gov @@ Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarzanbcoppelltx.gov Mr. Mitch Holrrles - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: olmes toppm tnc.co Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cduilderspr.com V 2717 QPviPwt d hv! a4m f1HN4nt All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval he GEE Consultants, Inc. The use o our name must s. our prior written approval, Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. S ecifications Tex -DOT Item 275 - 2004 Actual Percent Passu Minimum Percent Passing Location 13/4" Sieve . ieve , ►eve 1' e leve Sieve 4 lev 1. South Bound, Inside Lane 100.0 98.7 71.0 100.0 85.0 60.0 STA 9+50 F 105 Te 300'S of bridge 2. South Bound, Outside Lane 100.0 100.0 68.0 STA 9+50,260'S of Bridge 3. South Bound, Inside Lane 100.0 99.7 75.0 STA 8+50 4. South Bound, Outside Dane 100.0 82.0 68.0 STA 8+50 Technician: cc: Mr. Rick 0 Dell.. City of Coppell Via E -Mail: RODell@Coppelltx.gov @@ Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarzanbcoppelltx.gov Mr. Mitch Holrrles - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: olmes toppm tnc.co Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cduilderspr.com V 2717 QPviPwt d hv! a4m f1HN4nt All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval he GEE Consultants, Inc. The use o our name must s. our prior written approval, Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. Cj( • GEOTECHNICAL ENGINEERING E• ENVIRONMENTAL. CONSULTING GEE Consultan". Inc. • CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive Dallas, Texas 75229 ,'214) 352-5433 0 Fax (214) 352-6972 REINFORCING s'rEEL PLACEMENT Report Date: April 16, 2015 Test Date: February 13, 2015 Client: City of Coppell I General Report No.: 95 Project Freepor, Parkway Identification Reinforcing Steel Observation Method of Test Visual Observation Project No.: 214-144 I of I Results On February 13, 2015 reinforcing steel was observed at the following locations: Tieback beams - Gabion 1, Gabion 4 Stage 2 The following discrepancies were noted and called to the attention of Jose, a representative of Bernall Construction. 1) Fix the spacing of the stirrups. The above discrepancies were corrected as noted. Technician: CP cc: Mr. Rick 0 Dell- City of Coppell Via E -Mail: R 0 Dell@Coppelltx.gov Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc-com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com TBPE Firm: F-3212 Reviewed b GEE Consultants, Inc. 'GE Consultants, Inc. The use of All letters and reports are for the eXClUSiVc use of the client to whom they are addressed and Shalt not he reproduced without the full approval 0 our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities ol'apparently identical or similar products. -INICAL ENGINEERING VIRONMENTAL CONSULTING GEE Consultanis,-C Inc. • CONSTRUCTION MATE=RIALS TESTING 10046 Monroe Drive Dallas, Texas 75229 4 (214) 352-5433 • Fax (214) 352-6972 Report Date: April 2"3, 2015 Test Date:'', April 22, 2015 Client: City of Coppell General Report No.: 117 Project Freeport Pkwy Project No.: 214-144 Identification Reinforcing Steel Observation Method of Test Visual Observation Page 1 of 1 Results On April 22, 2015 reinforcing steel was observed at the following locations: 1. Drive way -5 2. Inlet top STA. 13+70 3. Rail trail 2 segments; bridge; stage 2; between abutment 4 and bent 3 4. Decel lane STA. 12+00 to 13+00 south bound 5. Drive way -3 The following discrepancies were noted and called to the attention of Antonio & Manuel, representatives of CD Builders. 1. Clean area (plastic and wood) 2. For inlet ring, supplemented with 4 diagonal rebar . 3. Clear the existing concrete before start pouring for decel lane The above discrepancies were corrected as noted. Technician: CP cc: Mr. Larry Davis - City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570 Mr. Michael Garza -',City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc TBPE Firm: F-3212 Reviewed by: y tters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must rel our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. FG • GEOTECHNICAL ENGINEERING E ENVIRONMENTAL CONSULTING GEE Consultants, Inc. LEJ * CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive Dallas, Texas 75229 0 (214) 352-5433 Fax (214) 352-6972 REPORT OF CONCRETE MIX OBSERVATION Measured Slump (in.) Report Date: April 24, 2015 Date Concrete Placed: April 13, 2015 Standard 6"xl2" Cylinders Client: City of Cb ell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. Concrete *port No.: 168 Contractor: CD Builders Inc. Project No.: 214-0144 Concrete Supplier and Plant: Argos #111 5111115 Location of Placement: North approach slab step down 5.0 MATERIALS Source / SSD Batch Wts. Description (Lbs/CuYd) OBSERVATION DATA Mix Number: 125 1 Time Sample Batched: 7:46 AM Cement: Time Sampled: 9:05 AM Fly Ash: Sample Location: North approach slab step down Coarse Aggregate: Truck / Ticket No: 4027 /1598534 Intermediate Aggregate: Cylinders Made By: CP I Temperature: (Unless Noted Otherwise) Fine Aggregate: Ambient Range: 70 OF Admixtures: Concrete Range: 76 OF Slump Range (inches): 5.0 I Weather Conditions: Cloudy 2 Time Started: 8:00 AM Added Water: 0 Time Completed: 10:45 PM Sample Air Content 3.4 Total Cubic Yards Placed: 10 Rennired qtrpn(yth (I'h" 1"n in l dn00 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.1n.) Remarks - FPP 657 7 4/20/15 117,700 4,160 FPP 658 28 5111115 5.0 FPP 659 28 5111115 FPP 660 H Hold Test Methods Utilized Fracture Regular Cylinders Made By: CP I ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution:- None cc: Mr. Larry Davis - City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570 Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CDBuilders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 , All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the receive out prior written approval. Our letters andl reports apply only to the sample tested and/or observed and are not necessarily Reviewed by: I approval of GEE Consultants, Inc. The use of our name must ficative of the quantities of apparently identical or similar products. G -GEOTECHNICAL ENGINEERING ENVIRONMENTAL CONSULTING CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive Dallas, Texas 75229 0 (214) 352-5433 Fax (214) 352-6972 REPORT OF CONCRETE MIX OBSERVATION Report Date: April 24, 2015 Date Concrete Placed: April 15, 2015 Standard 6"x12" Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28,27 Square Inches Project: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. Concrete Report No.: 171 Contractor: CD Builders Inc. Project No.: 2 14-0 144 Concrete Supplier and Plant: Argos #110 Location of Placement: Rail Post Bridge Stage 2; 2 Section N. of S. Abutment MATERJALS Source / SSD Batch Wits. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 1273 Time Sample Batched: 8:21 AM Cement: Time Sampled: 8:45 AM Fly Ash: Sample Location: Rail Post Bridge Stage 2; 2 Coarse Aggregate: 4/22/15 Section N. of S. Abutment, Intermediate Aggregate: Decel Lane S. Bound STA. 28 12+60 to 13+10; Inl6t Top Fine Aggregate: STA. 15+00 Admixtures: Truck / Ticket No: 5017/1599215 1 Temperature: 2 Ambient Range: 58 OF Added Water: 0 Concrete Range: 70 OF Slump Range (inches): 5.0 Regular Weather Conditions: Cloudy ted Otherwise) Time Started: 8:00 AM Time Completed: 11:00 PM Sample Air Content (%): 3.8 Total Cubic Yards Placed: 10 Requi Strength (Lbs./sq.in ): 3600 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.1n.) Remarks FPP 669 7 4/22/15 124,940 4,420 FPP 670 28 5/13/15 FPP 671 5.0 28 5/13/15 FPP 672 H Hold Test Methods Regular Cylinders Made By: CP ASTM C-31 ted Otherwise) Remarks and/or Distribution:- None cc: Mr. Larry Davis - City of Coppell, Phone: 9'72-304-3684; via Fax: 972-304-3570 Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 I All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indi iewed by: val of GEF Consultants, 17nc. The use of our name must of the quantities of apparently identical or similar products.