ST0502A- LR150505 (3)GEOTECHNICAL ENGIP�EERING * ENVIRONMENTAL CONSULTING -CONSTRUCTION MATERIALSTESTING GEE Consultants, Inc. 10046 Monroe Drive * )`Dallas, Texas 73229 O (214) 352-5433 0 Fax (214) 352-6972 REPORT OF CONCRETE NUX OBSERVATION Report Date May 5, 2015 Date Concrete Placed: Client: City of Coppell Project: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. Contractor: CD Builders Inc. Concrete Supplier and Plant: Argos 9110 Location of Placement: Inlet Curb April 24, 2015 Standard 6"xl2" Cylinders Cylinder Cross-sectional Area: 25.27 Square Inches Concrete Report No.: 180 Project No.: 214-0144 MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Descrintion (Lbs/CuYd) Mix Number: 1273 Cement: Fly Asti: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Admixtures: 2 Added Water: 0 Specimen Number TPP 693 ITP 694 FPP 695 FPP 696 Measured Slump (in.) M Age (Days) 7 28 28 H Date Tested 5/1/15 5/22/15 5/22/15 Hold Test ]Methods Utilized Fracture Regular ASTM C-31, C-39, C-143 i (Unless Tgoted Otherwise Remarks and/or Distribution:- None Time Sample Batched: Time Sampled: Sample Location: Truck / Ticket No: Temperature: Ambient Range: Concrete Range: Slump Range (inches): Weather Conditions: Time Started: Time Completed: Sample Air Content (%): Total Cubic Yards Placed: _ Rec wired Strength (Lbs./s .in. Total Load Compressive Strength (Lbs.) (Lbs./Sq.ln.) 126,160 4,460 Cylinders Made By: CP 7:22 AM 8:0 AM Inlet Curb STA. 13+70; Decel Lane North Bound STA. 8+20 to 9+00 1038/ 1604387 65 OF 72 OF 4.0 Sunny 7:00 AM 12:15 PM 3.4 10 Remarks cc: Mr. Rick Odell - City of Coppell via E-mail: ROdell@coppelltx.gov Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via 'E-mail: fluyando@cdbuilderspr.com — '11, J, GEE Consultants, Inc, TBPE Firm: F-3212 Reviewed b All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the hill approval of GEE Consultants, bre. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. GEOTECHNICAL ENG"NEERING • ENVIRONMENTAL CONSULTING CONSTRUCTION MATERIALS TESTING A- — GEE Consultants, Inc. 10046 Monroe Drive Dallas, Texas 75229 w (214) 352-5433 0 Fax (214) 352-6972 REPORT' OF CONCRETE MIX OBSERVATION Report [)are: May 5, 20 15 Date Concrete Placed: Client: City of Coppell Project: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. Contractor: CD Builders Inc. Concrete Supplier and Plant: Argos #110 Location of'Placement: Pavement Median Crossing STA. 12+10 to 12+70 April 27, 2015 Standard 6"xI2" Cylinders Cylinder Cross-sectional Area: 28.27 Square Inches Concrete Report No.: 181 Project No.: 214-0144 MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: Cement: Fly Asti: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate:; Admixtures: 2 Added Water: 1273 Time Sample Batched: 7:20 AM Time Sampled: 8:25 AM Sample Location: Pavement Median Crossing FPP 697 STA. 12+10 to 12+70 Truck / Ticket No: 5046/ 1604785 Temperature: 4,420 Ambient Range: 64 OF Concrete Range: 78 OF Slump Range (inches): 3.0 Weather Conditions: Cloudy 5 Time Started: 7:00 AM Time Completed: 11:00 AM Sample Air Content (%)* 4.0 Total Cubic Yards Placed: 10 Required Strenath (Lbs./sa.in.): 3600 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength Remarks (Lbs./Sq.1n.) FPP 697 7 5/4/15 124,960 4,420 FPP 698 28 5/25/15 3.0 FPP 699 28 5/25/15 FPP 700 H Hold Fest Methods Utilized Fracture Regular Cylinders Made By: CP ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distributiow- None cc: Mr, Rick Odell - City of Coppell via E-mail: ROdell@coppelltx.gov Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.1-ov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: tluyando@cdbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: t a 4- ,fq All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name inust receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. - GEOTECHNICAL ENGINEERING • ENVIRONMENTALCONSULTING E I -CONSTRUCTIONMATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive Dallas, Texas 75229 0 (214) 352-5433 0 Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: May 5, 2015 'rest Date: April 29, 2015 Client: City of Coppell General Report No.: 119 Project Freeport Parkway ProjectNo.: 214-144 Identification Reinforcing Steel Observation Method of Test Visual Observation. Page I of I Results On April 29, 2015 reinforcing steel was observed at the following locations: Pier Lights (STA 25+50 to STA 36+15) P'1 -P7 The following discrepancies were noted and called to the attention of Javier, a representative of Met's Electric LP, 1) Use rebar support, 2) Clean rebar. 'The above discrepancies were corrected as noted. Technician: CP cc: Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpine.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: I ZIL—a All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use or our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities ofapparently identical or similar products. G1 - GEOTECHNICAL ENGINEERING ENVIRONMENTAL CONSULTING E I -CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive Dallas, Texas 75229 (214) 352-5433 Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: May 5, 2015 Test Date: April 29, 2015 Client: City of Coppell General Report No.: 120 Project Freeport Parkway Project No.: 214-144 Identification ReirifoTcing Steel Observation Method of Test Visual Observation P= I of 1. Results On April 29, 2015 reinforcing steel was observed at the following locations: Decel lane, Northbound sTA. Bike trail STA. The following discrepancies were noted and called to the attention of Antonio, a representative of CD Builders. 1) Clean area. 2) Supplemented with rebar support. 3) They need to install rebar connection for next pouring. The above discrepancies were corrected as noted. Technician: CP cc: Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: iiiholmes@tnpinc.com Mr. Francisco Luyarido - CE) Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed b�risult' - �6 All letters and reports are for the eXCIL[SiVe Use of the client to whom they are undressed and shall not he reproduced without the full approval ' GEE Consultants, Inc. The use of our name must receive our priorwritten approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. _GEOTECHNICAL ENGINEERING ENVIRONMENTAL CONSULTING GEE Consultan"r, J1• CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive Dallas, Texas 35229 * (214) 352-5433 0 Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: May 5,= 201.5 Test Date: May 1, 2015 Client: City of Coppell General Report No.: 122 Project Freeport Parkway Project No.: 214-144 Identification Reiriforcing Steell Observation Method of zest Visual Observation Page 1 of 1 Results On May 1, 2015 reinforcing steel was observed at the following locations: Decel lane, in front of 300 Freeport pkwy, Southbound. There were no discrepancies. ce: Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr, Mitch Holmes Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes('Otnpinc.com. Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com (SEE Consultants, Inc. TBPE Firm: F-321.2 Reviewed by • All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. t he use of 1)ttrname mustreceive our prior written egrprovai. Our letters and reports apply only tothe sample tested and/or observed and are not necesanlymdicahveofthequan es of apparently identical or similar products. A - GEOTECHNICAL ENGINEERING E I # ENVIRONMENTAL CONSULTING • CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive • Dallas, Texas 75229 (214) 352-5433 • Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: May 5, 2015 Test Date: April 30, 2015 Client: City of Coppell General Report No.: 121 Project Freeport Parkway Project No.: 214-144 Identification Reinforcing Steel Observation Method of Test Visual Observation Page I of I Results On April 30, 2015 reinforcing steel was observed at the following locations: Sidewalk 50'N. of Wagon Wheel park entrance. There were no discrepancies. Technician: FIT cc: Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza(&coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes(,&tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com ('.FF Cnnullitan All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of—GE-E Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical sur similar products.