. REPORT OF CONCRETE MIX OBSERVATIOJ
Report Date: May 15,2015 Date Concrete Placed: April 16, 2015 Standard 6"x12" Cylinders
Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches
Project: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. Concrete Report No.: 172
Contractor: CD Builders Inc. Project No.: 214-0144
Concrete Supplier and Plant: Argos #110
Location of Placement: Pavement: (North Bound)
MATERIALS Source / SSD Batch Wts. OBSERVATION DATA
Description (Lbs/CuYd) —
Mix Number: 1273
Time Sample Batched:
8:41 AM
Cement:
Time Sampled:
9:15 AM
Remarks
Sample Location:
Pavement (North Bound) -
Fly Ash:
4/23/15
Inside Lane 120'N from
Coarse Aggregate:
Bridge Railing
Intermediate Aggregate:
Truck / Ticket No:
5017/01600264
Fine Aggregate:
Temperature:
Admixtures:
Ambient Range:
77 OF
I
Concrete Range:
75 OF
2
Slump Range (inches):
5.0
Added Water: 0
Weather Conditions:
Clear
Time Started:
8:00 AM
-Hold
Time Completed:
12:15 PM
Fracture Regular
Sample Air Content
3.3
(Unless Noted Otherwise)
Total Cubic Yards Placed:
20
Rennired Strength (Lbs./sci.in.):
3600
Specimen
Number
Measured
Slump (in.)
Age
(Days)
Date
Tested
Total Load
(Lbs.)
Compressive Strength
(Lbs./Sq.1n.)
Remarks
FPP 673
7
4/23/15
121,660+
4,300+
FPP 674
28
5/14/15
136,460+
4,830+
FPP 675
5.0
28
5/14/15
150880+
5,340+
FPP 676
H
-Hold
Test Methods Utilized
Fracture Regular
Cylinders Made By: RA
ASTM C-31, C-39, C-143
(Unless Noted Otherwise)
Remarks and/or Distribution:- None
cc: Rick Odell <ROdell@coppelltx.gov>
Mr, Michael Garza - city of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov
Mr. Mitch Holmes - Teague,, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com
Mr. Francisco Luyando - CE) Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com
GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by:
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must
receive our prior written approval. Our letters and reports apply only to the sample tested and/ or observed and are not necessarily indicative of the quantities of apparently identical or similar products.
GI + GEOTECHNICAL ENGINEERING
El + ENVIRONMENTAL CONSULTING GEE Consultants, Inc.
Ll + CONSTRUCTION MATERIALS TESTING
10046 Monroe Drive + Dallas, Texas 75229 + (214) 352-5433 0 Fax (214) 352-6972
AEPORT OF CONCRETEOBSERVATION
Report Date: May 15, 2015 Date Concrete Placed: April 16, 2015 Standard 6"x12" Cylinders
Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches
Project: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. Concrete Report No.: 173
Contractor: CD Builders Inc. Project No.: 214-0144
Concrete Supplier and Plant: Argos #I 10
Location of Placement: Bridge Rail Trail
MATERIALS Source /', SSD Batch Wts. OBSERVATION DATA
Description (Lbs/CuYd)
Mix Number: 1083 Time Sample Batched: 1:27 PM
Cement:
Fly Ash:
Coarse Aggregate:
Intermediate Aggregate:
Fine Aggregate:
Admixtures:
2
Added Water:
0'
Time Sampled:
Sample Location:
Truck / Ticket No:
Temperature:
Ambient Range:
Concrete Range
Slump Range (inches):
Weather Conditions:
Time Started:
Time Completed:
Sample Air Content (%):
Total Cubic Yards Placed:
2:15 PM
Bridge Rail Trail - Bridge
Wall (North Bound) 200'N.
From Bridge Approach
(Approx 15' Long)
7007/01600663
84 OF
78 OF
5.0
Clear
1:00 PM
4:00 PM
3.2
6
.in.): 3600
Specimen Measured
Age Date
lbtal Load
Compressive Strength Remarks
Number Slump (in.)
(Days) Tested
(Lbs.)
(Lbs.ISq.[n.)
FPP 677
7 4/23/15
124,400+
4,400+
FPP 678
28 5/14/15
132,680+
4,690+
6.0
FPP 679
28 5/14/15
1351340+
4,790+
FPP 680
H Hold
Test Methods Utilized
Fracture Regular
Cylinders Made By: RA
ASTM C-31, C-39, C-143
(Unless Noted Otherwise)
Remarks and/or Distribution:- None
cc: Rick Odell <ROdell@coppelltx.gov>
Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov
Mr. Mitch Holmes - Teague., Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpine.com
Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com
TBPE
Firm: F-3212 Reviewed by:
GEE consultants, Inc.
All tetters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants Inc The use of our name must
d/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.
receive our prior written approval. Our letters and reports apply only to the sample tested an
•
GEOTECHNICAL ENGINEERING ����
E • ENVIRONMENTAL CONSULTING GEE Consultant
sf
CE 9 CONSTRUCTION MATERIALS TESTING
10046 Monroe Drive Dallas, Texas 75229 0 (214) 352-5433 0 Fax (214) 352-6972
REPORT OF CONCRETE MIX OBSERVATION
Report Date: May 15, 2015 Date Concrete Placed: May 7, 2015 Standard 6"x12" Cylinders
Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches
Project: Free pots: Pkwy from Ruby Rd. to Sandy Lake Rd. Concrete Report No.: 192
Contractor: CD Builders Project No.: 214-0144
Concrete Supplier and Plant: Agros 125
Location of Placement: Paving - Decel lane and median crossing
MATERIALS
Source /
SSD Batch Wts. OBSERVATION DATA
Age
Date
Description
(Lbs/CuYd)
Remarks
Mix Number:
1273
Time Sample Batched:
10:28 AM
Cement:
(Lbs./Sq.1n.)
Time Sampled:
11:20 AM
7
Sample Location:
STA. 21+00 to 19+00
Fly Ash:
Truck / Ticket No:
3555/1611446
Coarse Aggregate:
1 6/4/15
Temperature:
Intermediate Aggregate:
FPP 735
Ambient Range:
71 OF
Fine Aggregate:
Concrete Range:
80 OF
Admixtures:
Slump Range (inches):
4.25
1
Weather Conditions:
Cloudy
2
Cylinders Made By: CP
Time Started:
9:00 AM
Added Water:
0
Time Completed:
5:30 PM
Sample Air Content (%):
3.6
Total Cubic Yards Placed:
10
uired Strength (Lbs./sq. in): 3 600
Specimen
Measured
Age
Date
.-Re
Total Load
Compressive Strength
Remarks
Number
Slump (in.)
(Days)
Tested
(Lbs.)
(Lbs./Sq.1n.)
FPP 733
7
5/14/15
130,220+
4,610+
FPP 734
28
1 6/4/15
FPP 735
4.25
28
6/4/15
FPP 736
H
Hold
Test Methods Utilized
T Fracture Regular
Cylinders Made By: CP
ASTM C-31, C-39, C-143
(Unless Noted Otherwise)
Remarks and/or Distribution:- None
cc: Mr. Rick Odell - City of Coppell via E-mail: ROdell@coppelltx.gov
Mr, Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov
Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com
Mr. Francisco Luyando - CID Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com
TBPE Firm: F-3212 Re
GEE Consultants, Inc. use
and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must
All letters and reports are for the exclusive i f the client to whom they are addressed and shall not be re
receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.
�G - GEOTECHNICAL ENGINEERING
Measured
Slump (in.)
Age
(Days)
E - ENVIRONMENTAL CONSULTING
GEE Consultants, Inc.
E
• CONSTRUCTION MATERIALS TESTING
FPP 737
10046 Monroe Drive
Dallas, Texas 75229
(214) 352-5433
Fax (214) 352-6972
REPORT OF CONCRETE MIX OBSERVATION
Report Date:
May 15, 2015 Date Concrete Placed: May 7, 2015
Standard 6"x12" Cylinders
Client:
City of Coppell
Cylinder Cross-sectional Area: 28.27 Square Inches
Project:
Free port Pkwy from Ruby Rd. to Sandy Lake Rd.
Concrete Report No.: 193
Contractor:
CD Builders
Project No.: 214-0144
Concrete Supplier and Plant:
Agros 125
H
Location of Placement:
Paving Median Crossing
MATERIALS
Source SSD Batch Wts.
Description (Lbs/CuYd)
OBSERVATION DATA
ASTM C-31, C-39, C-143
Mix Number:
1273
Time Sample Batched:
2:41 PM
Cement:
Time Sampled:
3:20 PM
Fly Ash:
Sample Location:
North Half STA. 21+00 to
Coarse Aggregate:
Truck / Ticket No:
19+00
3551/1611659
Intermediate Aggregate:
Temperature:
Fine Aggregate:
Ambient Range:
82 OF
Admixtures:
Concrete Range:
82 OF
I
Slump Range (inches):
6.25
2
Weather Conditions:
Mostly Cloudy
Added Water:
0
Time Started:
9:00 AM
Time Completed:
5:30 PM
Sample Air Content (%):
3.2
Total Cubic Yards Placed:
110
Rpnidrpti S',trt-,noth (I.h-_/-n.in.): 3600
Specimen
Number
Measured
Slump (in.)
Age
(Days)
Date
Tested
Total Load
(Lbs.)
Compressive Strength
(Lbs./Sq.1n.)
Remarks
FPP 737
7
5/14/15
114,180
4,040
FPP 738
28
6/4/15
FPP 739
6.25
28
6/4/15
FPP 740
H
Hold
Test Methods Utilized
Fracture Regular
I(Unless
Cylinders Made By: CP
ASTM C-31, C-39, C-143
Noted Otherwise)
Remarks and/or Distribution:- None
cc: Mr. Rick Odell - City of Coppell via E-mail: ROdell@coppelltx.gov
Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov
Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com
Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com
GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by:
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc, The use of our name must
receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.