Loading...
ST0502A- LR150519• GEOTECHNICAL ENGINEERING E • ENVIRONMENTAL CONSULTING GEE Consultants Inc. E • CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive Dallas, Texas 75229 0 (214) 352-5433 0 Fax (214) 352-6972 REPORT OF CONCRETE MIX OBSERVATION Measured Slump (in.) Report Date: May 19,', 2015 Date Concrete Placed: April 20, 2015 Standard 6"x12" Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. , Concrete Report No.: 177 Contractor: CD Builders Inc. Project No.: 214.0144 Concrete Supplier and Plant: Argos #I 10 5/1.8/15 150,560 Location of Placement: Bridge Rail for Trail & Inlets FPP 683 3.5 MATERIALS Source !' SSD Batch Wts. OBSERVATION DATA 5,410+ Description (Lbs/CuYd) H Mix Number: 1083 Time Sample Batched: 8:43 AM Cement: Fracture Regular Time Sampled: 9:20 AM Fly Ash: Sample Location: Bridge Between Bent 2 and 3; Coarse Aggregate: Inlet Curb STA. 14+90; Intel Intermediate Aggregate: Top and Wall STA. 18+60 Truck / Ticket No: 7098 /1601846 Fine Aggregate: Temperature: Admixtures Ambient Range: 60 OF I Concrete Range: 72 OF 2 Slump Range (inches): 3.5 Added Water: 0', Weather Conditions: Sunny Time Started: 8:30 AM Time Completed: 11:00 AM Sample Air Content (%): 3.4 Total Cubic Yards Placed: 10 Rerntired Ctrenoth (l.hs_/sn_in_): 3600 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.In.) Remarks FPP 681 7 4/27/15 131,740 4,660 FPP 682 28 5/1.8/15 150,560 5,330 FPP 683 3.5 28 5/18/15 152,960+ 5,410+ FPP 684 H Hold Test Methods Utilized Fracture Regular Cylinders Made By: CP ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution:- None cc: Mr. Rick Odell - City of Coppell via E-mail: ROdell@coppelltx.gov Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc. All letters and reports are for the exclusive receive our prior written approval. our letters r TBPE Firm: F-3212 Reviewed by: of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products, • GEOTECHNICAL ENGINEERING -ENVIRONMENTAL CONSULTING GEE Consultants, Inc. J1# CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive 0 Dallas, Texas 75229 0 (214) 352-5433 •Fax (214) 352-6972 REPORT OF CONCRETE MIX OBSERVATION Report Date: May 19, 12015 Date Concrete Placed: Client: City of Coppell Project: Free port Pkwy from Ruby Rd. to Sandy Lake Rd. Contractor: CD Builders Concrete Supplier and Plant: Agros #110 Location of Placement: Paving Median Crossing and Curb May 11, 2015 Standard 6"xl2" Cylinders Cylinder Cross-sectional Area: 28.27 Square Inches Concrele Report No.: 194 Project No.: 214-0144 MATERIALS Source / Description SSD Batch Wts. OBSERVATION DATA (Lbs/CuYd) Date Tested Mix Number: 1273 Time Sample Batched: 8:33 AM Cement: 7 Time Sampled: 9:05 AM Fly Ash: Sample Location: STA 18+00 to 19+20 Coarse Aggregate: 6/8/15 Truck / Ticket No: 7098/1612207 Intermediate Aggregate: Temperature: Fine Aggregate: Ambient Range: 62 OF Admixtures: Concrete Range: 72 OF Slump Range (inches): 4.25 I H Weather Conditions: Partly Cloudy 2 Time Started: 7:30 AM Added Water: 0 Time Completed: 3:45 PM Sample Air Content 3.8 Total Cubic Yards Placed: to Required Strength (Lbs./so.in.): 3600 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.1n.) Remarks FPP 741 7 5/118/15 127,060 4,490 FPP 742 28 6/8/15 6.25 FPP 743 28 6/8/15 FPP 744 H Hold Test Methods Utilized Fracture Regular Cylinders Made By: CP ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution:- None cc: Mr. Rick Odell - City of Coppell via E-mail: ROdell@coppelltx.gov Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: -77 All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. EG* GEOTECHNICAL ENGINEERING AL E • ENVIRONMENTAL CONSULTING GEEonsulta isl Inc. E • CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive • Dallas, Texas 75229 0 (214) 352-5433 •Fax (214) 352-6972 U011 01 1111,74 Im"Imm IRis Report Date: Client: Project: Contractor: Concrete Supplier and Plant: Location of Placement: May 20,'2015 Date Concrete Placed: City of Coppell Free port Pkwy from Ruby Rd. to Sandy Lake Rd. CD Builders Agros 125 Paving Sidewalk May 11, 2015 Standard 6"xl2" Cylinders Cylinder Cross-sectional Area: 28.27 Square Inches Concrete Report No.: 195 Project No.: 214-0144 MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 1251 Time Sample Batched: 11:36 AM Cement: Time Sampled: 12:15 PM. Fly Ash: Sample Location: Bridge Sidewalk S. Bound Coarse Aggregate: Truck / Ticket No: 7091/1612333 Intermediate Aggregate: Temperature: FPP 746 Fine Aggregate: Ambient Range: 67 OF Admixtures: Concrete Range: 76 OF Slump Range (inches): 4.5 I Weather Conditions: Mostly Cloudy 2 Time Started: 7:30 AM Added Water: 0 Gallons Time Completed: 3:45 PM Sample Air Content 3.4 Total Cubic Yards Placed: 10 Required Strength (Lbs./sq.in.): 4000 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.1n.) Remarks FPP 745 7 5/18/15 106,360 3,760 FPP 746 28 &8/15 4.5 FPP 747 28 6/8/15 FPP 748 H Hold Test Methods Utilized Fracture Regular Cylinders Made By: CP ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution:- None cc: Mr. Rick Odell - City of Coppell via E-mail: ROdell@coppelltx.gov Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily Reviewed ,a] of GEE Consultants, Inc. Theuseof our name must of the quantities of apparently identical or similar products.