March 23, 2015
Mr. Michael Garza, P.E.
Assistant Direct of Engineering
Engineering Department
City of Coppell
255 Parkway Boulevard
Coppell, Texas 75019
Re: Freeport Parkway — North
Coppell, Texas
Engineering Inspection & Testing Services
AGG Proposal No: P15 -0320C
Dear Mr. Garza:
• GEOTECHNICAL ENGINEERING
• ENVIRONMENTAL CONSULTING
• CONSTRUCTION MATERIALS ENGINEERING AND TESTING
Phn: (972) 304-7019
Email: mgarza@coppelltx.gov
Alliance Geotechnical Group (AGG) is pleased to confirm our firm's interest in providing
materials inspection and testing services for the proposed project noted above. A schedule of
unit fees for this project is attached.
After reviewing our fee schedule if you have any questions, please contact the undersigned at
(972) 444-8889. If acceptable, please sign below and fax back to our office as our Authorization
to Proceed. We look forward to the opportunity of working with you on this project.
Respectfully submitted,
ALLIANCE GEOTECHNICAL GROUP
Perry Ka%ara, S.E.T.
CME Department Manager
Approved by:
Signature
Robert P. ance
President
Date--
"".® 3228 Halifax Street Dallas, Texas 75247 AW 972.444 8889 Fax: 972-444-8893 • www.aggengr.com -0
SCHEDULE OF FEES
FOR
CONSTRUCTION MATERIALS ENGINEERING & TESTING
FREEPORT PARKWAY - NORTH COPPELL, TEXAS AGG PROPOSAL NO.: P15 -0320C
DESCRIPTION OF SERVICES QUANTITY UNIT FEE UNIT FEE
A. SUBGRADE TESTING & INSPECTION
• Moisture/Density Relationship of Soils (ASTM D-698)
7
@
$150.00 '
each
• Atterberg Limits
0
@
$50.00
each
• Lime Series ( 5 point PI method)
0
@
$224.00
each
• Cement Series
6
@
$375.00
each
• Sulfate Test
0
@
$90.00
each
• Driveway Subgrade Density Test ( 1 per driveway)
0
@
$13.00
each
• Trail Density Tests ( 1 per 300 If)
10
@
$13.00
each
• Barrier Ramp Density Tests ( 1 per ramp)
7
@
$13.00
each
• Cement Gradation Test
36
@
$13.00
each
• Depth Verification (as required)
0
@
$13.00
each
• Subgrade In -Place Density Test (1 per 300 If)
36
@
$13.00
each
• Retaining Wall Backfill Density Test
48
@
$13.00
each
• Sr. Engineering Tech to perform testing
162
@
$39.00
hour
• Project Manager
20
@
$75.00
hour
• Geotechnical Project Manager( as needed)
0
@
$90.00
hour
• Sr. Geotechnical Engineer ( as needed)
@
$110.00
hour
• Vehicle Charge
21
@
$35.00
trip
Sub -Total
B. UTILITY BACKFILL TESTING & INSPECTION
• Moisture/Density Relationship of Soils (ASTM D-698)
6
@
$15000
each
• Atterberg Limits
6
@
$50.00
each
• Sieve Analysis for Embedment
2
@
$35.00
each
• In -Place Density Test* (ASTM D2922)
291
@
$13.00
each
• Concrete Test Cylinders (4 cyls per set) inlets,manholes
32
@
$1500
each
• Sr. Engineering Tech to perform testing
314
@
$39.00
hour
• Project Manager
20
@
$75.00
hour
• Vehicle Charge
43
@
$35.00
trip
Sub -Total
P15-0320
$1,050.00
$0.00
$0.00
$2,250.00
$0.00
$0.00
$130.00
$91.00
$468.00
$0.00
$468.00
$624.00
$6,318.00
$1,500.00
$0.00
$0.00
$735.00
$13,634.00
$900.00
$300.00
$70.00
$3,783.00
$480.00
$12,246.00
$1,500.00
$1,505.00
$20,784.00
SCHEDULE OF FEES
FOR
CONSTRUCTION MATERIALS ENGINEERING & TESTING
FREEPORT PARKWAY - NORTH COPPELL, TEXAS AGG PROPOSAL NO.: P15 -0320C
DESCRIPTION OF SERVICES QUANTITY UNIT FEE UNIT FEE
C. CONCRETE & REINFORCING TESTING & INSPECTION
• Concrete Inspection & Testing (regular time)
• Concrete Cylinder Test -(4 cyls per 100 cyd ) - Paving
• Concrete Cylinder Test -(4 cyls per 100 cyd ) -Trail
• Concrete Cylinder Test -(4 cyls ) - Retaining Wall
• Concrete Cylinder Test -(4 cyls per 100 cyd ) - Box Culvert
• Concrete Cylinder Test -(4 cyls per 100 cyd ) - Wing Walls
• Concrete Cylinder Test -(4 cyls per 100 cyd ) - Barrie ramps
• Concrete Core Depth Checks ( 2" dia core / 300 If)
• Project Manager
• Vehicle Charge
NOTES:
496
@
$39.00
hour
$19,344.00
244
@
$15.00
each
$3,660.00
40
@
$15.00
each
$600.00
120
@
$15.00
each
$1,800.00
28
@
$15.00
each
$420.00
24
@
$15.00
each
$360.00
8
@
$15.00
each
$120.00
19
@
$40.00
each
$760.00
25
@
$75.00
hour
$1,875.00
85
@
$35.00
trip
$2,975.00
Sub -Total $31,914.00
ESTIMATED TOTAL $66,332.00
1. Overtime rates of 1.5 times the regular hourly rate will be charged for hours worked over eight (8) hours
per day Monday thru Friday or any time before 7:00 a.m. or after 5:00 p.m. Service performed on Saturdays
and Sundays will be billed at 1.5 times the regular hourly rate. Services performed on recognized holidays
will be billed at 2.0 times the regular hourly rate. ( WILL BE BILLED TO CONTRACTOR)
2. All laboratory test fees are F.O.B. our laboratory; additional charge for sample pickup may apply.
3. Any additional tests will be billed on a hourly rate and charged at the applicable rate, portal-to-portal.
4. Additional test not specified in this proposal will be quoted upon request.
5. This proposal does not include any technician stand-by, non -readiness charges, and/or trips or re -tests of the
previous failing tests.
P15-0320