Loading...
ST0502A- LR150608G1 # GEOTECHNICAL ENGINEERING E I* ENVIRONMENTAL CONSULTING E I -CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. ....... . .. 10046 Monroe Drive Dallas, Texas 75229 • (214) 352-5433 Fax (214) 352-6972 Report Date: June 8, 2015 Date Concrete Placed: Client: City of Coppell Project: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. Contractor: CD Builders Concrete Supplier and Plant: Agros 125 Location of Placement: Paving - Decel lane and median crossing May 7, 2015 Standard 6"xl2" Cylinders Cylinder Cross-sectional Area: 28.27 Square Inches Concrete Report No.: 192 Project No.: 214-0144 MATERIALS Source / Description SSD Batch Wts. OBSERVATION DATA (Lbs/CuYd) Date Tested Mix Number: 1273 Time Sample Batched: 10:28 AM Cement: 7 Time Sampled: 11:20 AM Fly Ash: Sample Location: Paving - Decel lane and median Coarse Aggregate: 6/4/15 141,200+ crossing, STA. 21+00 to 19+00 FPP 735 Truck / Ticket No: 3555/1611446 Intermediate Aggregate: 142,340+ Temperature: Fine Aggregate: Ambient Range: 71 OF Admixtures: Concrete Range: 80 OF I Cylinders Made By: CP Slump Range (inches): 4.25 2 Weather Conditions: Cloudy Added Water: 0 Time Started: 9:00 AM Time Completed: 5:30 PM Sample Air Content 3.6 Total Cubic Yards Placed: 10 Reauired Strength (Lbs./sq.in.): 3600 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.1n.) Remarks FPP 733 7 5/14/15 130,220+ 4,610+ FPP 734 28 6/4/15 141,200+ 4,990+ FPP 735 4.25 28 6/4/15 142,340+ 5,040+ FPP 736 H Hold Test Methods utilized Fracture Regular Cylinders Made By: CP ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution:- None cc: Mr. Rick Odell - City of Coppell via E-mail: ROdell@coppelltx.gov Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. G I - GEOTECHNICAL ENGINEERING ENVIRONMENTAL CONSULTING • CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive • Dallas, Texas 75229 • (214) 352-5433 0 Fax (214) 352-6972 Report Date: June 8, 2015 Date Concrete Placed: May 7, 2015 Standard 6"xI2" Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. Concrete Report No.: 193 Contractor: CD Builders Project No.: 214-0144 Concrete Supplier and Plant: Agros 125 Location of Placement: Paving Median Crossing MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 1273 Cement: Fly Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Admixtures: Added Water: Time Sample Batched Time Sampled: Sample Location: 2:41 PM 3:20 PM Paving Median Crossing, North Half STA. 21+00 to 19+00 Truck / Ticket No: 3551/1611659 Temperature: Ambient Range: 82 OF Concrete Range: 82 OF Slump Range (inches): 6.25 Weather Conditions: Mostly Cloudy Time Started: 9:00 AM Time Completed: 5:30 PM Sample Air Content (%): 3.2 Total Cubic Yards Placed: 110 Re uired Strength (Lbs./sq.in ): 3600 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.1n.) Remarks FPP 737 7 5/14/15 114,180 4,040 FPP 738 28 6/4/15 132,600+ 4,690+ FPP 739 6.25 28 6/4/15 135,340 4,790 FPP 740 H Hold Test Methods Utilized Fracture Regular 1 Cylinders Made By: CP I ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution:- None cc: Mr. Rick Odell - City of Coppell via E-mail: ROdell@coppelltx.gov Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEF Consultants, Inc. The use of our name must indicative of the quantities of appalentIN identical or similar moduct� receive our prior written approval, Our letters and reports apply only to the sample tested and/or observed and are not necessarily -INICAL ENGINEERING VIRONMENTAL CONSULTING * CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive • Dallas, Texas 75229 (214) 352-5433 0 Fax (214) 352-6972 Report Date: Client: Project: Contractor: Concrete Supplier and Plant: Location of Placement: June 8, 2015 Date Concrete Placed: May 11, 2015 Standard 6"x]2" Cylinders City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. Concrete Report No,: 194 CD Builders Project No.: 214_0144 Agros #110 Paving Median Crossing and Curb MATERIALS Source / SSD Batch Wts. Description (Lbs/CuYd) OBSERVATION DATA Compressive Strength (Lbs./Sq.1n.) Mix Number: 1273 Time Sample Batched: 8:33 AM Cement: 127,060 Time Sampled: 9:05 AM Fly Ash: Sample Location: Paving Median Crossing and 140,920+ 4,980+ Curb, STA 18+00 to 19+20 Coarse Aggregate: 28 Truck / Ticket No: 7098/1612207 Intermediate Aggregate: Temperature: Fine Aggregate: Hold Ambient Range: 62 OF Admixtures: Test Methods Utilized Fracture Regular Concrete Range: 72 OF I Slump Range (inches): 4.25 2 Weather Conditions: Partly Cloudy Added Water: 0 Time Started: 7:30 AM Time Completed: 3:45 PM Sample Air Content 3.8 Total Cubic Yards Placed: 10 Required Strength (Lbs./sq.in.): 3600 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.1n.) Remarks FPP 741 7 5/18/15 127,060 4,490 FPP 742 28 6/8/15 140,920+ 4,980+ FPP 743 6.25 28 6/8/15 142,000+ 5,020+ FPP 744 H Hold Test Methods Utilized Fracture Regular Cylinders Made By: CP I ASTM C-31, C-39, C-143 (Unless Noted I Remarks and/or Distribution:- None cc: Mr. Rick Odell - City Of'Coppell via E-mail: ROdell@coppelltx.gov Mr, Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyaiido@cdbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: ( All letters and reports are for the exclusive use of the client to whore they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The us6 of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. G1 * GEOTECHNICAL ENGINEERING ENVIRONMENTAL CONSUIJING E I# CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive • Dallas, Texas 75229 • (214) 352-5433 • Fax (214) 352-6972 REPORT OF CONCRETE MIX OBSERVATION Measured Slump (in.) Report Date: June 8, 2015 Date Concrete Placed: May 11, 2015 Standard 6NI2' Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. Concrete Report No.: 195 Contractor: CD Builders Project No.: 214-0144 Concrete Supplier and Plant: Agros 125 4,760+ Location of Placement: Paving Sidewalk 28 6/8/15 MATERIALS Source / SSD Batch Wts. OBSERVATION DATA FPP 748 Description (Lbs/CuYd) Mix Number: 125 1 Time Sample Batched: 11:36 AM Cement: ASTM C-31, C-39, C-143 Time Sampled: 12:15 PM Fly Ash: Sample Location: Bridge Sidewalk S. Bound Coarse Aggregate: Truck / Ticket No: 7091/1612333 Intermediate Aggregate: Temperature: Fine Aggregate: Ambient Range: 67 OF Concrete Range: 76 OF Admixtures: Slump Range (inches): 4.5 Weather Conditions: Mostly Cloudy 2 Time Started: 7:30 AM Added Water: 0 Gallons Time Completed: 3:45 PM Sample Air Content (%): 3.4 Total Cubic Yards Placed: 10 Required Strength (Lbs-/so.in.): 4000 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.1n.) Remarks FPP 745 7 5/18/15 106,360 3,760 FPP 746 28 6/8/15 134,480+ 4,760+ FPP 747 4.5 28 6/8/15 141,900+ 5,020+ FPP 748 H Hold Test Methods Utilized Fracture Regular I Cylinders Made By: CP ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution:- None cc: Mr. Rick Odell - City of Coppell via E-mail: ROdell@coppelltx.gov Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: All letters and reports are for the exclusive use of the client to whom ithey are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.