ST0502A- LR150604iNICAL ENGINEERING VIRONMEN1AL CONSULTING • CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive 0 Dallas, Texas 75229 • (214) 352-5433 • Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: June 4,'2015 Test Date: June 3, 2015 Client: City of Coppell General Report No.: 135 Project Freeport Parkway Project No.: 214-144 Identification Reinforcing Steel Observation Method of Test Visual Observation Page I of I Results On June 3, 2015 reinforcing steel was observed at the following locations: 1) Median Nose - Stamped Concrete, STA 25+50 to 25+90. The following discrepancies were noted and called to the attention of Antonio, a representative of CD Build 1) Clean area (plastic bottles, a piece of wood). The above discrepancies were corrected as noted. Technician: CP cc: Mr. Michael Garza - City of COPPell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes'- Teague, Nall 8,, Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc-com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com Mr. Rick Odell - City of Coppell via E-mail: rodell@coppelltx.gov GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: they are addressed and shall not be reproduced the full approval of GEE Consultants, Inc. The use of All letters and reports are for me exclusive use of the client to whom c a t apparently our name must receive our prior written approval, Our letters and reports apply Only to the sample tested and/or observed and are not necessarily indicative of quantities identical or similar products. iNICAL ENGINEERING VIRONMENIAL CONSULTING * CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive Dallas, Texas 75229 0 (214) 352-5433 • Fax (214) 352-6972 p Report Date: June 4, 2.015 Date Concrete Placed: May 27, 2015 Standard 6"xl2" Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. Concrete Report No.: 208 Contractor: CD Builders Project No.: 214-0144 Concrete Supplier and Plant: Agros I,10 Location of Placement: Paving - Bike Trail MATERIALS Source / SSE) Batch Wts. OBSERVATION DATA Description (Lbs,/CuYd) Mix Number: 1043 Time Sample Batched: 10:31 AM Cement: Time Sampled: 11:15 AM Fly Ash: Sample Location: Bike Trail STA 18+10 to 19+30 Coarse Aggregate: Truck / Ticket No: 7102/1617556 Intermediate Aggregate: Temperature: 107,560 Fine Aggregate: Ambient Range: 70 OF Admixtures: Concrete Range: 78 OF Slump Range (inches): 4.5 I Weather Conditions: Sunny 2 Time Started: 7:30 AM Added Water: 0 Time Completed: 12:00 PM 28 Sample Air Content (%): 3.6 Total Cubic Yards Placed: 10 Required Strength (Lbs./sq.in.): 3600 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs) Compressive Strength (Lbs./Sq.1n.) Remarks FPP 797 7 6/3/15 107,560 3,800 FPP 798 28 6/24/15 4.5 FPP 799 28 6,124/15 FPP 800 H Hold Test Methods Utilized Fracture Regular I Cylinders Made By: CPI ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution:- None cc: Mr. Rick Odell - City of Coppell via E-mail: ROdell@coppelltx.gov Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: LZ All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inr. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products,