Loading...
ST0502A- LE150502-INICAL ENGINEERING VIRONMENTAL CONSULTING • CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive Dallas, Texas 75229 0 (214) 352-5433 0 Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: May 2, 2015 Client: City of Coppell Project Freeport Parkway Identification Reinforcing Steel Observation Method of Test Visual Observation Test Date: May 15, 2015 General Report No.: 125 Project No.: 214-144 Page 1 of 1 Results On May15, 2015 reinforcing steel was observed at the following locations: 1) Bike Trail on Bridge. The following discrepancies were noted and called to the attention of Alejandro, a representative of CD Builders. 1) Clean area. 2) Fixed bars #5 VI to match spacing with bars in rail columns. The above discrepancies were corrected as noted. Technician: CP cc: Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com Mr. Rick Odell - City of Coppell via E-mail: ROdell@coppelltx.gov GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: '@ All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.