Loading...
ST0502A- LR150528G I* GEOTECHNICAL ENGINEERING • ENVIRONMENTAL CONSULTING E I# CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive • Dallas, Texas 75229 • (214) 352-5433 0 Fax (214) 352-6972 Report Date: May 28, 2015 Date Concrete Placed: April 30, 2015 Standard 6"x][2' Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. Concrete Report No.: 186 Contractor: CD Builders Inc. Project No.: 214-0144 Concrete Supplier and Plant: Argos #110 Location of Placement: Pavement / Sidewalk MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 1273 Cement: Fly Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Admixtures: 2 Added Water: 0 Time Sample Batched: Time Sampled: Sample Location: 11:10 AM 12:00 PM 150'N. of Park Entrance, S. Bound Truck / Ticket No: 5039 /1606384 Temperature: Ambient Range: 77 OF Concrete Range: 80 OF Slump Range (inches): 2.5 Weather Conditions: Partly Cloudy Time Started: 10:00 AM Time Completed: 3:15 PM Sample Air Content 3.75 Total Cubic Yards Placed: 30 PArridrPti Vtrpnoth tl.hq /qn in )- 1600 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.1n.) Remarks FPP 709 7 5/7/15 117,460 4,150 FPP 710 28 5/28/15 132,500 4,690 FPP 711 2.5 28 5/28/15 141,980 5,020 FPP 712 H Hold Test Methods Fracture Regular '(Unless Cylinders Made By: BT I ASTM C-31 Noted Otherwise) Remarks and/or Distribution:- None cc: Mr, Rick Odell - City of Coppell via E-mail-, ROdell@coppelltx.gov Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. 'fire use of ournamemust receive our prior written approval, Our tenets and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. iNICAL ENGINEERING VIRONMENTAL CONSULTING o CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive • Dallas, Texas 75229 (214) 352-5433 0 Fax (214) 352-6-9-72 Report Date: May 28, 2015 Date Concrete Placed: April 30, 2015 Standard 6"xI2" Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. Concrete Report No.: 187 Contractor: Mels Electric, LP Project No.: 214-0144 Concrete Supplier and Plant: LMC #950 Location of Placement: Light Piers MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: Time Sample Batched: 12:30 PM Cement: Time Sampled: 1:45 PM Fly A* Sample Location: Median 100' NE. of Park Coarse Aggregate: 5/7/15 Entrance Intermediate Aggregate: Truck / Ticket No: 9102 /62508922 Fine Aggregate: Temp Temperature: 5/28/15 114,260 Ambient Range: 80 OF Admixtures: Concrete Range: 86 OF I Slump Range (inches): 2.5 2 Weather Conditions: Partly Cloudy Added Water: 0 Time Started: 10:00 AM 4,150 Time Completed: 3:15 PM Sample Air Content (%): 3.0 I Total Cubic Yards Placed: 6 Test Methods Utilized Reauired Strength (Lbs./sa.in.): 4000 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.1n.) Remarks FPP 713 7 5/7/15 99,820 3,530 FPP 714 28 5/28/15 114,260 4,040 2.5 FPP 715 28 5/28/15 117,240 4,150 FPP 716 H Hold I I Test Methods Utilized Fracture Regular Cylinders Made By: BT ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution:- None cc: Mr, Rick Odell - City of Coppell via E-mail: ROdell@coppelltx.gov Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed b, All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Out letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.