ST0502A- LR150528G I* GEOTECHNICAL ENGINEERING
• ENVIRONMENTAL CONSULTING
E I# CONSTRUCTION MATERIALS TESTING
GEE Consultants, Inc.
10046 Monroe Drive • Dallas, Texas 75229 • (214) 352-5433 0 Fax (214) 352-6972
Report Date: May 28, 2015 Date Concrete Placed: April 30, 2015 Standard 6"x][2' Cylinders
Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches
Project: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. Concrete Report No.: 186
Contractor: CD Builders Inc. Project No.: 214-0144
Concrete Supplier and Plant: Argos #110
Location of Placement: Pavement / Sidewalk
MATERIALS Source / SSD Batch Wts. OBSERVATION DATA
Description (Lbs/CuYd)
Mix Number: 1273
Cement:
Fly Ash:
Coarse Aggregate:
Intermediate Aggregate:
Fine Aggregate:
Admixtures:
2
Added Water: 0
Time Sample Batched:
Time Sampled:
Sample Location:
11:10 AM
12:00 PM
150'N. of Park Entrance,
S. Bound
Truck / Ticket No: 5039 /1606384
Temperature:
Ambient Range:
77 OF
Concrete Range:
80 OF
Slump Range (inches):
2.5
Weather Conditions:
Partly Cloudy
Time Started:
10:00 AM
Time Completed:
3:15 PM
Sample Air Content
3.75
Total Cubic Yards Placed:
30
PArridrPti Vtrpnoth tl.hq /qn in
)- 1600
Specimen
Number
Measured
Slump (in.)
Age
(Days)
Date
Tested
Total Load
(Lbs.)
Compressive Strength
(Lbs./Sq.1n.)
Remarks
FPP 709
7
5/7/15
117,460
4,150
FPP 710
28
5/28/15
132,500
4,690
FPP 711
2.5
28
5/28/15
141,980
5,020
FPP 712
H
Hold
Test Methods
Fracture Regular
'(Unless
Cylinders Made By: BT
I
ASTM C-31
Noted Otherwise)
Remarks and/or Distribution:- None
cc: Mr, Rick Odell - City of Coppell via E-mail-, ROdell@coppelltx.gov
Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov
Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com
Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com
GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by:
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. 'fire use of ournamemust
receive our prior written approval, Our tenets and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.
iNICAL ENGINEERING
VIRONMENTAL CONSULTING
o CONSTRUCTION MATERIALS TESTING
GEE Consultants, Inc.
10046 Monroe Drive • Dallas, Texas 75229 (214) 352-5433 0 Fax (214) 352-6-9-72
Report Date: May 28, 2015 Date Concrete Placed: April 30, 2015 Standard 6"xI2" Cylinders
Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches
Project: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. Concrete Report No.: 187
Contractor: Mels Electric, LP Project No.: 214-0144
Concrete Supplier and Plant: LMC #950
Location of Placement: Light Piers
MATERIALS Source / SSD Batch Wts. OBSERVATION DATA
Description (Lbs/CuYd)
Mix Number:
Time Sample Batched:
12:30 PM
Cement:
Time Sampled:
1:45 PM
Fly A*
Sample Location:
Median 100' NE. of Park
Coarse Aggregate:
5/7/15
Entrance
Intermediate Aggregate:
Truck / Ticket No:
9102 /62508922
Fine Aggregate:
Temp
Temperature:
5/28/15
114,260
Ambient Range:
80 OF
Admixtures:
Concrete Range:
86 OF
I
Slump Range (inches):
2.5
2
Weather Conditions:
Partly Cloudy
Added Water: 0
Time Started:
10:00 AM
4,150
Time Completed:
3:15 PM
Sample Air Content (%):
3.0
I
Total Cubic Yards Placed:
6
Test Methods Utilized
Reauired Strength (Lbs./sa.in.):
4000
Specimen
Number
Measured
Slump (in.)
Age
(Days)
Date
Tested
Total Load
(Lbs.)
Compressive Strength
(Lbs./Sq.1n.)
Remarks
FPP 713
7
5/7/15
99,820
3,530
FPP 714
28
5/28/15
114,260
4,040
2.5
FPP 715
28
5/28/15
117,240
4,150
FPP 716
H
Hold
I
I
Test Methods Utilized
Fracture Regular
Cylinders Made By: BT
ASTM C-31, C-39, C-143
(Unless Noted Otherwise)
Remarks and/or Distribution:- None
cc: Mr, Rick Odell - City of Coppell via E-mail: ROdell@coppelltx.gov
Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov
Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com
Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com
GEE Consultants, Inc. TBPE Firm: F-3212
Reviewed b,
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must
receive our prior written approval. Out letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.