Loading...
ST0502A- LR150528 (3)­INICAL ENGINEERING VIRONMENTAL CONSULTING • CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive Dallas, Texas 75229 • (214) 352-5433 0 Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: May 28, 2015 Test Date: May 27, 2015 Client: City of Coppell General Report No.: 132 Project Freeport Parkway Project No.: 214-144 Identification Reinforcing Steel Observation Method of Test Visual Observation Page 1 of 1 Results On May 27, 2015 reinforcing steel was observed at the following locations: 1) Paving - Bike Trail STA 18+10 to. STA 19+30 The following discrepancies were noted and called to the attention of Antonio, a representative of CD Builders. 1) Add Chairs. The above discrepancies were corrected as noted. Technician: CP cc: Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelitx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com Mr. Rick Odell - City of Coppell via E-mail: ROdell@coppelltx.gov GEE Consultants, Inc TBPE Firm: F-3212 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.