ST0502A- LR150528 (3)INICAL ENGINEERING
VIRONMENTAL CONSULTING
• CONSTRUCTION MATERIALS TESTING
GEE Consultants, Inc.
10046 Monroe Drive Dallas, Texas 75229 • (214) 352-5433 0 Fax (214) 352-6972
REINFORCING STEEL PLACEMENT
Report Date: May 28, 2015 Test Date: May 27, 2015
Client: City of Coppell General Report No.: 132
Project Freeport Parkway Project No.: 214-144
Identification Reinforcing Steel Observation
Method of Test Visual Observation
Page 1 of 1
Results
On May 27, 2015 reinforcing steel was observed at the following locations:
1) Paving - Bike Trail STA 18+10 to. STA 19+30
The following discrepancies were noted and called to the attention of Antonio, a representative of CD Builders.
1) Add Chairs.
The above discrepancies were corrected as noted.
Technician: CP
cc: Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelitx.gov
Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com
Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com
Mr. Rick Odell - City of Coppell via E-mail: ROdell@coppelltx.gov
GEE Consultants, Inc TBPE Firm: F-3212 Reviewed by:
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of
our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently
identical or similar products.