ST0502A- LR150527• GEOTECHNICAL ENGINEERING E I -ENVIRONMENTAL CONSULTING E I -CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive • Dallas, Texas 75229 0 (214) 352-5433 0 Fax (214) 352-6972 REPORT OF CONCRETE MIX OBSERVATION ---------- Report Date: May 27, 2015 Date Concrete Placed: April 29, 2015 Client:City ----------- of Coppell Standard 6"xl2" Cylinders Project: Freeport Pkwy from Ruby Rd. to Sandy Contractor: Lake Rd. Cylinder Cross-sectional Area: 28,27 Square Inches CD Builders Concrete Supplier and Plant: Argos 110 Concrete Report No.: 182 Project Location of Placement: Decel Lane North Bound No.: 214-0144 MATERIALS Source / SSD Batch Wts. Description (Lbs/CuYd) OBSERVATION DATA Mix Number: 1273 Cement: Time Sample Batched: 7:27 AM Fly Ash: Time Sampled: 8:05 AM Coarse Aggregate: Sample Location: Decel Lane North -bound STA Intermediate Aggregate: 2+00 to 3+20, Bike Trail STA Fine Aggregate: 1+60 to 2+60; STA 12+00 to Admixtures: Truck / Ticket No: 15+50 5017 /1605286 1 Temperature: 2 Ambient Range: 53 OF Added Water: 0 Concrete Range: 66 OF Slump Range (inches): 3.5 Weather Conditions: Sunny Time Started: 7:00 AM Time Completed: 3:30 PM Sample Air Content 4.0 Total Cubic Yards Placed: 10 Specimen Specimen Measured Age Date Date Ke� R wired Stre th (Lbs./s in.): 3600 Number Number ber Slump (in.) (Days) Tested T( Total Load (Lbs.) compressive Strength (Lbs./Sq.1n.) Wr:� Remarks FPP 701 0 7 1 7 5/6/15 5/6/ 1 5 120,-140+ 4,250+ FPP 702 702 FPP 703 703 3.5 28 5/27/15 5/27/ 1 5 143,840 5,090 FPP 704 0 28 5/27/15 146,120 5,170 H Hold Test Methods Utilized Fracture Regular ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Cylinders Made By: CP Remarks and/or Distribution:- None cc: Mr. Rick Odell - City of Coppell via E-mail: ROdell@coppelltx.gov Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 All letters and reports are fu the exclusive use Reviewed b of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, inc* The use of our t receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. mproudsucts. ­INICAL ENGINEERING VIRONMENTAL CONSULTING - CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive 0 Dallas, Texas 75229 0 (214) 352-5433 0 Fax (214) 352-6972 Report Date: May 27, 2015 Date Concrete Placed: May 20, 2015 Standard 6"x I2" Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Free port Pkwy from Ruby Rd. to Sandy Lake Rd. Concrete Report No.: 203 Contractor: CD Builders Project No.: 214-0144 Concrete Supplier and Plant: Agros I 11 Location of Placement: Bridge Small Pilaster; Rail Between the 'Frail and Roadway South Bound MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 1083 Cement: Fly Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Admixtures: 1 2 Added Water: 0 Time Sample Batched: Time Sampled: Sample Location: Truck / Ticket No: Temperature: Ambient Range: Concrete Range: Slump Range (inches): Weather Conditions: Time Started: Time Completed: Sample Air Content (%): Total Cubic Yards Placed: Rp.nnirpri qtrpnorth (I he /cn in )i 10:10 AM 11:00 AM Rail trail - 2 section between abutment I and bent 2 6022;1615632 80 OF 84 OF 4.0 Partly Cloudy 9:00 AM 1:15 PM 3.6 10 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq,ln.) Remarks FPP 777 7 5/27/15 110,720 3,920 FPP 778 28 6/17/15 4.0 FPP 779 28 6/17/15 FPP 780 H Hold Test Methods Utilized Fracture Regular ASTM C-31, C-39, C-143 , (Unless Noted Otherwise) Cylinders Made By: CP Remarks and/or Distribution:- None cc: Mr. Rick Odell - City of Coppell via E-mail: ROdell@coppelltx.gov Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmcs@tnpinc.com Mr, Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval ofl GEE Consultants,Ine, The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products, GEOTECHNICAL ENGINEERING • ENVIRONMENTAL CONSULTING E I* CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. . . ...................................... 10046 Monroe Drive • Dallas, Texas 75229 0 (214) 352-5433 0 Fax (214) 352-6972 Report Date: May 27, 2015 Date Concrete Placed: Client: City of Coppell Project: Free port Pkwy from Ruby Rd. to Sandy Lake Rd. Contractor: CD Builders Concrete Supplier and Plant: Agros I I I Location of Placement: Paving May 20, 2015 Cylinder Cross-sectional Area: 28.27 Square Inches Concrete Report No,: 204 Project No.: 214-0144 Standard 6"xI2' Cylinders MATERIALS Source / Description SSD Batch Wts. OBSERVATION DATA (Lbs/CuYd) Mix Number: 1043 Time Sample Batched: 10:28 AM Cement: Time Sampled: 11:20 AM Fly Ash: 3,770 Sample Location: Stamped concrete median nose Coarse Aggregate: 28 6/17/15 STA. 33+60 to 34+05 Intermediate Aggregate: Truck / Ticket No: 4027/1615670 Fine Aggregate: Temperature: Admixtures: FPP 783 Ambient Range: 80 OF I Concrete Range: 84 OF FPP 784 Slump Range (inches): 5,0 2 Weather Conditions: Partly Cloudy Added Water: 10 Gallon Time Started: 9:00 AM Cylinders Made By: CP Time Completed: 1:15 PM Sample Air Content (%): 3.4 Total Cubic Yards Placed: 10 Rpnnirpd 0,trrnath (I ko Ion i, )i- 'Irno Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.1n.) Remarks FPP 781 7 5/27/15 106,580 3,770 FPP 782 28 6/17/15 5.0 FPP 783 28 6/17/15 FPP 784 H Hold Test Methods Utilized Fracture Regular ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Cylinders Made By: CP Remarks and/or Distribution:- None cc: Mr. Rick Odell - City of Coppell via E-mail: ROdell@coppelltx.gov Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: � All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products,