Loading...
ST0502A- LR150527 (3)(; I . GEOTECHNICAL ENGINEERING E I - ENVIRONMENTAL CONSULTING E I -CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive Dallas, Texas 75229 • (214) 352-5433 0 Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: May 27, 2015 Test Date: May 19, 2015 Client: City of Coppell General Report No.: 128 Project Freeport Parkway Project No.: 214-144 identification Reinforc:ing Steel Observation Method of Test Visual Observation Pae I of I Results On May 19, 2015 reinforcing steel was observed at the following locations: 1) Stamped Concrete STA, 32+30 to 324-80 The following discrepancies were noted and called to the attention of Antonio, representative of CD Buil 1) Clean existing concrete for a good connection. 2) Supplemented with rebar support The above discrepancies were corrected as noted. Technician: CP cc: Mr. Michael Garza .. City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com Mr. Rick Odell - City of Coppell via E-mail: ROdell@coppelltx.gov GEE Consultants, Ine. TBPE Firm: F-3212 Reviewed b e addressed and shall not be reproduced without the full approval of4EE(—Consultants . esintuse of All letters and reports are lot me exclusive use of the client to whom they are he sample tested and /orobserved and are not necessarily indicativeofthe quantities of apparently our name must receive our prior written approval, Our letters and reports apply only to I identical or similar products. 'INICAL ENGINEERING VIRONMENTAL CONSULTING 9 CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive Dallas, Texas 75229 0 (214) 352-5433 Fax (214) 352-6972 REINFORCING 'STEEL PLACEMENT Report Date: May 27, 2015 Test Date: May 20, 2015 Client: City of Coppell General Report No.: 129 Project Freeport Parkway Project No.: 214-144 Identification Reinforcing Steel Observation Method ofTest Visual Observation Page lofl Results On May 20, 2015 reinforcing steel was observed at the following locations: 1) Bridge - Rail between the trail and road way south bound. Two (2) segments between abutment and bent 2 2) Paving - Nose; stamped concrete STA. 33+60 to 34+05 The following discrepancies were noted and called to the attention of Antonio/ Alehandro, representatives of CD Builders. 1) For bridge, use rebar support 2) For stamped concrete, clean existing curb inside for a good connection The above discrepancies were corrected as noted. Technician: CP cc: Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com Mr. Rick Odell - City of Coppell via E-mail: ROdell@coppelltx.gov GEE Consultants, Inti. TBPE Firm: F-3212 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approvalf GEE Consultants, Inc. The use of ourname must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities ofapparently identical or similar products. G I - GEOTECHNICAL ENGINEERING E I -ENVIRONMENTAL CONSULTING E I* CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive 41 Dallas, Texas 75229 (214) 352-5433 0 Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: May 27, 2015 Test Date: May 22, 2015 Client: City of Coppell General Report No.: 130 Project Freeport Parkway Project NO.: 214-144 identification Reinforcing Steel Observation Method of Test Visual Observation Page I of I Results On May 22, 2015 reinforcing steel was observed at the following locations: I) Bridge traffic pedestrian rai I - 2 segments between bent 2 and bent 3 2) Median Nose - stamped. median nose, STA. 30+30 to STA 30+60 The following discrepancies were noted and called to the attention of -Antonio/ Alehandro, representatives of _CD Builders. 1) For bridge, use rebar support 2) For median nose, clean existing concrete for a good connection The above discrepancies were corrected as noted. Technician: CP cc: Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com Mr. Rick Odell - City of Coppell via E-mail: ROdell@coppelltx.gov GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by:( f �/ All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be repioduced without the full approval of GEF Consultants- Inc I'lle use OF our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities ol'apparently identical or similar products.