Loading...
ST0502A- LR150521­INICAL ENGINEERING VIRONMENTAL CONSULTING * CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive 0 Dallas, Texas 75229 0 (214) 352-5433 0 Fax (214) 352-6972 Report Date: May 21, 2015 Date Concrete Placed: April 22, 2015 Standard 6"xI2" Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. Concrete Report No.: 175 Contractor: CD Builders Inc. Project No.: 214-0144 Concrete Supplier and Plant: Argos #110 Location of Placement: Paving Driveway -5; Inlet Top STA. 13+70 Rail Trail Bridge Stage 2, 2 Segments Between Abutment and Bent 3. MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 1273 Time Sample Batched: 7:47 AM Cement: Time Sampled: 8:15 AM Fly Ash: Sample Location: Paving Driveway -5; Inlet Top Coarse Aggregate: 4/24/15 STA. 13+70 Rail Trail Bridge 3,700 Stage 2, 2 Segments Between Intermediate Aggregate: 7 Abutment and Bent 3. Fine Aggregate: Truck / Ticket No: 7098/ 1603355 Admixtures: Temperature: 28 I Ambient Range: 63 OF 2 Concrete Range: 72 OF Added Water: 0 Slump Range (inches): 4.5 5,340 Weather Conditions: Sunny Fracture Regular Time Started: 7:30 AM (Unless Noted Otherwise) Time Completed: 2:50 PM Sample Air Content (%): 3.6 Total Cubic Yards Placed: 10 Reauired Strenath (Lbs./sq.in.): 3600 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.1n.) Remarks FPP 685 2 4/24/15 104,720 3,700 FPP 686 7 4/29/15 132,380 4,680 FPP 687 4.5 28 5/20/15 145,100+ 5,130+ FPP 688 28 5/20/15 1 150,840 5,340 1 Test Methods Utilized Fracture Regular Cylinders Made By: CP ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution:- None cc: Rick Odell <ROdell@coppelltx.gov> Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: _Zlio Z, All 'letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. G1 # GEOTECHNICAL ENGINEERING E I* ENVIRONMENTAL CONSULTING CONSTRUCTION MATERIALS TESTING A- — GEE Consultants, Inc. 10046 Monroe Drive Dallas, Texas 75229 6 (214) 352-5433 Fax (214) 352-6972 Report Date: May 21, 2015 Date Concrete Placed: April 22, 2015 Standard 6"N12" Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. Concrete Report No.: 176 Contractor: CD Builders Inc. Project No.: 214-0144 Concrete Supplier and Plant: Argos 9110 Location of Placement: Pavement Decel. Lane STA. 12+00 to 13+00 Southbound. Driveway -3, Connection with Northbound. MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 1273 Time Sample Batched: 12:34 PM Cement: Time Sampled: 1:20 PM Fly Ash: Sample Location: Pavement Decel. Lane STA. Coarse Aggregate: 4/29/15 12+00 to 13+00 Southbound. Intermediate Aggregate: Driveway -3, Connection with Fine Aggregate: 28 Northbound. Admixtures: Truck / Ticket No: 1098 /1603747 FPP 691 Temperature: 28 5/20/15 Ambient Range: 72 OF 2 Concrete Range: 80 OF Added 'Water: 0 Slump Range (inches): 4.25 Weather Conditions: Cloudy Fracture Regular Time Started: 7:30 AM (Unless Noted Otherwise) Time Completed: 2:50 PM Sample Air Content (%): 3.4 Total Cubic Yards Placed: 110 Re uired Strength (Lbs./sq.in ): 3600 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.1n.) Remarks FPP 689 7 4/29/15 128,820 4,560 FPP 690 4.25 28 5/20/15 137,060+ 4,850+ FPP 691 28 5/20/15 152,180+ 5,380+ FPP 692 H I Hold I I Test Methods Utilized Fracture Regular Cylinders Made By: CPI ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution:- None cc: Rick Odell <ROdell@coppelltx.gov> Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: �=ZL,4tf Z� All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The usof our name must receive our prior written approval. Out letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.