Loading...
Rosebriar- CS150417T H E C 1 T Y O F COPPELL x A s 1 a a April 7, 2015 Kenny Hafner Rosebriar Development, LLC 300 E. Carpentar Fwy, Ste. 940 Irving, Tx 75062 RE: Rosebriar Estates Two -Year Maintenance Bond Release Dear Mr. Hafner: Representatives of the City of Coppell have performed an inspection of paving and utilities for the referenced project to coincide with the end of the two-year bond term. As of the date of this letter we have found the facilities to be in good condition overall, and the punchlist of minor items that needed repair has been completed. Erosion control structures/systems were also inspected and found to be in acceptable condition at this time. The City of Coppell considers the status of all bonds released. Nyclloe1a�P.E. Assistant irector of Engineering cc: Keith Marvin, P.E., Assistant Director of Public Works Michael Arellano, Chief Building Official Tim Oates, Deputy Chief/Prevention Jennifer Miller, Finance Director Attachment: original Final Acceptance Letter March 11, 2013 A FAMILY COMMUNITY FOR A LIFETIME 255 PARKWAY * P.O. BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * WWW.COPPELLTX.GOV