Eckerd's-LR 990308 G ° GEOTECHNICAL ENGINEERING
E GEE Consultants,
Inc.
E ° CONSTRUCTION MATERIALS TESTING
10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 o Fax (214) 352-6972
REPORT OF CONCRETE MIX INSPECTION
Report Date: March 8. 1999 Date Concrete Placed: Februa_r3, 3. 1999 Standard 6"x12"
Client: North American Propenies-SW Area 28.27 Square Inches
Project: Eckerds - Coppell Concrete Report No.: 1 1
Contractor: C.A. Walker p ~ect N,,.. 298-0412
Concrete Supplier and PlanE: TXI Plant/#41
Locanun ,it' Placement: Paving
MATERIALS ~ ..... . ,.~D ~t~,:,~,~. INSPECTION DATA
Mix Nuntber: ~203 Time Sample Batched: t l: 10 am
C~'ment: Time Sampled: !2:55 pm
g~v .-Xsim: Sample Location: 60' W & ~0' N. ,,t NW c~rner ,ff hulldlne
Truck/Ticket No: y¢37-' 1230455
Coarse Aggregate' Temperature:
Intel-mediate Aggregate: Ambient Range: 75: F
Frae Aggregate: Concrete Range: 70:F
Adnuxtures: Slump Range ~inches}: '~"
; Weather Conditions: Clear
Time Started: 09:00 am
2 Time Completed: 02:00 pm
.-Xdueo Wa[er: ~0 Gallons Sample Air Conte ]t ~ ¥: 3 c~c
Total Cubic Yards Placed: :40
Required Streogth i Lbs.:sq.ll~. ~: 3.0(X)
ECK 40 7 02/10/99 59,360 2,100
ECK 41 g.. 28 03.*03/99 79,200 2.800
ECK 42 28 03~03/99 80,000 2.830
ECK 43 56 03/31/99
:\:~1':'4 t'.)l.c'.3,~ L'-i43 d.'~.ess Noted O~he:w,se, Cylinders Made By: SM
R~marks and/or D~smbuuon: *Notified Gary Stokes w/Walker Construction. Hold cylinder set up to test at 56-days.
cc: Mr. John Maggiore - No~h American Properties -SW
Mr. Lance Lilly - Richmond Group Architecture & Pl~ning
Mr. Gary Stokes - C.A. Walker Construction
Mr. Lee Stone - City of Coppell
Mr. Lar~ Davis - City of CoppelI
~ ~~, Inc.
All ;et~rs a~ r~ts ~e :or the exc:us,ve ~e of the client to ~'Boln I~y ~e ad~s~ a~ s~l ~ ~ repr~ i~ t~ full a~al of GEE Comulmn~, I~. The usc of ~ :n~ mm[ r~clVe