Loading...
WA1005- CS120216 Table 2 Coppell Wastewater Collection System Improvements, 2011-2021 Cost Allocation for Impact Fee Calculations Percent Utilization Costs Based on 2011 Dollars Current 10-Year Description of Project2011*20212011-2021Capital CostBeyond 2021 Development(2011-2021) No. EXISTING AExisting 30-inch forcemain in Basin C80%100%20%$1,164,000$931,200$232,800$0 BExisting 24-inch gravity line in Basin A90%100%10%$1,476,000$1,328,400$147,600$0 CExisting 21-inch gravity line in Basin A85%100%15%$357,600$303,960$53,640$0 DExisting 18-inch gravity line in Basin A85%100%15%$321,600$273,360$48,240$0 EExisting 15-inch gravity line in Basin A85%100%15%$428,400$364,140$64,260$0 FExisting 21-inch gravity line in Basin B75%100%25%$357,600$268,200$89,400$0 GExisting 27-inch gravity line in Basin B75%100%25%$751,800$563,850$187,950$0 HExisting 15/24-inch gravity line in Basin E80%95%15%$1,045,800$836,640$156,870$52,290 IExisting 30-inch gravity line in Basin C and E75%95%20%$2,263,200$1,697,400$452,640$113,160 JSaint Jones 30-inch forcemain (discharge from Deforest PS)70%100%30%$2,312,041$1,618,429$693,612$0 KExisting 20-inch forcemain from Sandy Lake Lift Station75%100%25%$1,172,750$879,563$293,188$0 LUpsize Deforest and Sandy Lake Lift Stations70%100%30%$2,611,742$1,828,219$783,522$0 MImpact Fee Study0%100%100%$40,000 $0$40,000$0 Existing Project Sub-total $14,302,533$10,893,360$3,243,722$165,450 Total Capital Improvements Cost $14,302,533$10,893,360$3,243,722$165,450 * Utilization in 2011 on Proposed Projects indicates a portion of the project that will be used to address deficiencies within the existing system, and therefore are not eligible for impact fee cost recovery for future growth.