WA1005- CS120215 (2)Brandon,
On the roadway example fee calculations there are several mathematical errors. These are probably left over from prior reports. Easy mistake but please be sure to have these revised
prior to the final draft. I have not gone through the report to see any other math errors.
Thank You, George
George Marshall, PE
City of Coppell
Engineering
972-304-3562