Loading...
WA1005- CS120215 (2)Brandon, On the roadway example fee calculations there are several mathematical errors. These are probably left over from prior reports. Easy mistake but please be sure to have these revised prior to the final draft. I have not gone through the report to see any other math errors. Thank You, George George Marshall, PE City of Coppell Engineering 972-304-3562