Loading...
Eckerd's-LR 990305i G · GEOTECHNICAL ENGINEERING E o ENVIRONMENTALCONSULTING GEE Consultants, Inc. E· CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive · Dallas, Texas 75229 - (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: March 5, 1999 Date Concrete Placed: February 22. 1999 Standaml 6"x12" Client: North American Properties=SW Area 2:'i.27 Square Inches ProJect: Eckerds - Coppell Concrete Report No.: [4 C,mtractor: C.A. Walker ProJeCt xo.: 298-0412 Concrete Supplier and Plant: TXI Plant/#41 Lucation of Placement: Paving Approach MATERIALS .-. ...... ssi~ ,~Ech w,,. INSPECTION DATA Mix Number: '~203 Time Sample Batched: 09:05 am Cement: Time Sampled: 09:35 am Fly Ash: Sample Location: Approach off ot Denton Tap Road TmclOTicket No: 715/1246616 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 46~F Fine Aggregate: Concrete Range: 62=F .~d,mxtures: Slump Range 6nchesl: 6'.i" Weather Conditions: Partly Cloudy I Time Started: 08:t~ am 2 Time Completed: 11:30 am Aaded Wate r: ~) Gallons Sample Air Content { % ): 4 ~/-. % Total Cubic Yards Placed: t0 Reqmred Strength ~ Lbs.:sq. m. ): 3.t)00 ECK 53 7 03/01/99 57,400 2.030 ECK 54 28 03/22/99 6 ~...-;_'' ECK 55 28 03/22/99 ECK 56 H HOLD res: Me!h~s L'I:}:z:C i-racturc Regular Cylinders Made By: JS Remarks and/or Distribut,on: cc: Mr. John Maggiore - North American Properties -SW Mr. Lance Lilly - Richmond Group Architecture & Planning Mr. Gary Stokes - C.A. Walker Construction Mr. Lee Stone - City of Coppell Mr. Larry Davis - City of Coppell