Loading...
WA1005- CS111220 DRAFT Water, Wastewater and Roadway Impact Fee Report   December 2011  Prepared for: City of Coppell Prepared by: FREESE AND NICHOLS, INC. 4055 International Plaza, Suite 200 Fort Worth, Texas 76109 (817) 735‐7300 DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  Water & Wastewater Impact Fee Report December 2011 CITY OF COPPELL 255 Parkway P.O. Box 9478 Coppell, Texas 75109 FREESE AND NICHOLS, INC. 4055 International Plaza, Suite 200 Fort Worth, Texas 76109 FNI Project Number: CPL11254     DRAFT  THIS DOCUMENT IS RELEASED FOR  THE PURPOSE OF INTERIM REVIEW  UNDER THE AUTHORITY OF JESSICA  BROWN, P.E., TEXAS NO. 90098 ON  DECEMBER 20, 2011.  IT IS NOT TO  BE USED FOR CONSTRUCTION,  BIDDING OR PERMIT PURPOSES.  FREESE AND NICHOLS, INC.   TEXAS REGISTERED ENGINEERING  FIRM F‐ 2144    DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  i  TABLE OF CONTENTS  1.0 Background ............................................................................................................................. 1‐1  2.0 Land Use Assumptions ........................................................................................................ 2‐1  2.1 Service Area ................................................................................................................... 2‐1  2.2 Historical Population ..................................................................................................... 2‐3  2.3 Projected Population ..................................................................................................... 2‐3  2.4 Land Use ........................................................................................................................ 2‐4  3.0 Capital Improvements Plan ............................................................................................... 3‐1  3.1 Water and Wastewater Load Projections ..................................................................... 3‐1  3.2 Water and Wastewater System Improvements............................................................ 3‐3  4.0 Water and Wastewater Impact Fee Analysis ............................................................... 4‐1  4.1 Service Units .................................................................................................................. 4‐1  4.2 Maximum Impact Fee Calculations ............................................................................... 4‐3  5.0 Roadway Impact Fee Analysis .......................................................................................... 5‐7  5.1 Methodology ................................................................................................................. 5‐7  5.2 Roadway Impact Fee Service Area ................................................................................ 5‐8  Roadway Impact Fee Land Use Assumptions ........................................................................... 5‐9  5.3 Establishment of the Roadway Capital Improvement Plan ........................................ 5‐10  5.4 Roadway Level of Service ............................................................................................ 5‐11  5.5 Roadway Impact Fee Service Units ............................................................................. 5‐11  5.6 Roadway Existing Conditions Analysis ........................................................................ 5‐12  5.7 Existing Conditions Analysis ........................................................................................ 5‐13  5.7.1 Existing Traffic Volumes ....................................................................................... 5‐13  5.7.2 Vehicle‐Miles of Existing Capacity (Supply) ......................................................... 5‐14  5.7.3 Vehicle‐Miles of Existing Demand ....................................................................... 5‐14  5.7.4 Vehicle‐Miles of Existing Excess Capacity or Deficiencies ................................... 5‐15  5.8 Calculating Impact Fees ............................................................................................... 5‐15  5.8.1 Trip Generation .................................................................................................... 5‐16  5.8.2 Trip Length ........................................................................................................... 5‐17  DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  ii  5.8.3 Projected Growth and Vehicle‐Miles of New Demand ........................................ 5‐18  5.8.4 Capital Improvements Plan (CIP) ......................................................................... 5‐18  5.8.5 Vehicle‐Miles of New Capacity Provided ............................................................. 5‐22  5.8.6 Vehicle‐Miles of Existing Demand on Impact Fee CIP Roadways ........................ 5‐22  5.8.7 Maximum Cost per Service Unit .......................................................................... 5‐22  5.8.8 Land Use / Vehicle‐Mile Equivalency Table ......................................................... 5‐23  5.9 Calculating Impact Fees ............................................................................................... 5‐25       DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  iii  LIST OF TABLES  Table 2‐1 Historical Population .............................................................................................. 2‐3  Table 2‐2 Water and Wastewater Population Projections .................................................... 2‐3  Table 2‐3 Non‐residential Acreage ........................................................................................ 2‐4  Table 3‐1 Water Design Criteria ............................................................................................. 3‐1  Table 3‐2 Wastewater Design Criteria ................................................................................... 3‐1  Table 3‐3 Projected Water Demands ..................................................................................... 3‐2  Table 3‐4 Projected Wastewater Flows ................................................................................. 3‐2  Table 3‐5 Water System Impact Fee Eligible Projects ........................................................... 3‐4  Table 3‐6 Wastewater System Impact Fee Eligible Projects .................................................. 3‐5  Table 4‐1 Service Unit Equivalencies ..................................................................................... 4‐2  Table 4‐2 Water and Wastewater Service Units .................................................................... 4‐2  Table 5‐1 Increase in Developed Acreages for Years 2011 to 2021 ...................................... 5‐9  Table 5‐2 Roadway Facility Vehicle‐Mile Capacities ............................................................ 5‐11  Table 5‐3 Existing Excess Capacity and Demand ................................................................. 5‐15  Table 5‐4 Existing Excess Capacity and Deficiencies ............................................................ 5‐15  Table 5‐5 Projected Vehicle‐Miles of New Demand ............................................................ 5‐18  Table 5‐6 Summary of Roadway Cost .................................................................................. 5‐20  Table 5‐7 Projected Vehicle‐Miles of New Capacity (Supply) .............................................. 5‐22  Table 5‐8 Vehicle‐Miles of Existing Demand on CIP Roadways ........................................... 5‐22  Table 5‐9 Cost Per Service Unit Calculation ......................................................................... 5‐23  Table 5‐10 Land‐Use Vehicle‐Mile Equivalency Table ........................................................... 5‐24    LIST OF FIGURES  Figure 2‐1 Service Area ........................................................................................................... 2‐2  Figure 2‐2 Population and Non‐residential Acreage by Traffic Survey Zones ........................ 2‐5  Figure 3‐1 Water System Impact Fee Capital Improvements ................................................. 3‐6  Figure 3‐2 Wastewater System Impact Fee Capital Improvements ....................................... 3‐7  Figure 4‐1 Water and Wastewater Impact Fee per Service Unit Comparison ....................... 4‐5  Figure 4‐2 Water, Wastewater, and Roadway Impact Fee per Single Family Home  Comparison ...................................................................................................................... 4‐6  Figure 5‐1 Roadway Impact Fee CIP ...................................................................................... 5‐21    DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  iv  APPENDICES  Appendix A Water System Project Cost Estimates  Appendix B Existing Roadway Inventory  Appendix C Existing Roadway Capacity, Demand, Excess Capacity and Deficiencies  Appendix D Projected Vehicle‐Miles of New Demand  Appendix E Engineer’s Opinion of Probable Construction Cost   Appendix F Roadway Improvements Plan Project CIP Service Units of Supply  Appendix G Land Use Vehicle‐Mile Equivalency Table DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  1‐1  1.0 BACKGROUND Chapter 395 of the Texas Local Government Code requires an impact fee analysis before impact  fees can be created and assessed.  Chapter 395 defines an impact fee as “a charge or  assessment imposed by a political subdivision against new development in order to generate  revenue for funding or recouping the costs of capital improvements or facility expansions  necessitated by and attributable to the new development.”  In September 2001, Senate Bill 243  amended Chapter 395 thus creating the current procedure for implementing impact fees.   Chapter 395 identifies the following items as impact fee eligible costs:   Construction contract price   Surveying and engineering fees   Land acquisition costs   Fees paid to the consultant preparing or updating the capital improvements plan  (CIP)   Projected interest charges and other finance costs for projects identified in the CIP  Chapter 395 also identifies items that impact fees cannot used to pay for, such as:   Construction, acquisition, or expansion of public facilities or assets other than those  identified on the capital improvements plan   Repair, operation, or maintenance of existing or new capital improvements    Upgrading, updating, expanding, or replacing existing capital improvements to  serve existing development in order to meet stricter safety, efficiency,  environmental, or regulatory standards   Upgrading, updating, expanding, or replacing existing capital improvements to  provide better service to existing development   Administrative and operating costs of the political subdivision  DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  1‐2   Principal payments and interest or other finance charges on bonds or other  indebtedness, except as allowed above  In April 2011, the City of Coppell, Texas, authorized Freese and Nichols, Inc. (FNI) to perform an  impact fee analysis on the City’s water and wastewater systems.  The purpose of this report is  to address the methodology used in the development and calculation of water and wastewater  impact fees for the City of Coppell.  The methodology used herein satisfies the requirements of  the Texas Local Government Code Section 395 for the establishment of water and wastewater  impact fees.  The following table provides a list of abbreviations used in this report.  Abbreviation Full Nomenclature AWWA American Water Works CIP Capital Improvements Plan FNI Freese and Nichols, Inc. NCTCOG North Central Texas Council of Government TSZ Traffic Survey Zone DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  2‐1  2.0 LAND USE ASSUMPTIONS Population and land use are important elements in the analysis of water and wastewater  systems. Water demands and wastewater flows depend on the residential population and  commercial development served by the systems and determines the sizing and location of  system infrastructure.  A thorough analysis of historical and projected populations, along with  land use, provides the basis for projecting future water demands and wastewater flows.  2.1 Service Area The service area for Coppell’s water and wastewater systems is defined as the city limits.   Figure 2‐1 illustrates the service area.     E I 6 3 5 W I 6 3 5 E Belt Line Rd Fr e e p o r t P k w y S R o y a l L n W Bethel Rd E Sandy Lake Rd S B e l t L i n e R d E Parkway Blvd W Sandy Lake Rd N Mac A r t h u r B l v d E Bethel School Rd N D e n t o n T a p R d Airline Dr S D e n t o n T a p R d S M o o r e R d SH 12 1 Dividend Dr S C o p p e l l R d W SH 1 2 1 Lo d g e R d S M a c A rthur B l v d Deforest Rd Creekview Dr Sa m u e l B l v d Wrangler Dr N SH 1 2 1 H w y N M o o r e R d Mo c k i n g b i r d L n W P a r kway Blvd N C o p p e l l R d Riverchase D r Ruby Rd N H e a r t z R d Northpoint Dr S H e a r t z R d Fritz Dr F a l c o n L n Southwestern Blvd H i l l D r Star l e a f S t Park Valley Dr P i n y o n L n P h i l l i p s D r P l a n t a t i o n Dr Gat e w ay Blvd P a t r i ot D r A lle n R d L e d b e t t e r R d Pelican Ln Mallard Dr S C o u n t y L i n e R d Wood h u r s t D r E Be t h e l R d W a t e r v i e w D r Shadowcrest Ln Brooks Ln M e a d o w g l e n C i r Kaye St Burns St Canyon Dr Me a d owcreek Rd G r a h a m D r S p y g l a s s D r Oa k T r Cov e D r Gi f f o r d D r Village P k w y Barc l a y A v Blue Jay Ln Minyard Dr Lake Vist a Dr W i n d i n g H o l l o w L n Crestview D r L a k e s hore Dr Woodmoor Dr A lex Dr Ed g e w o o d D r Halifax Dr F o r e s t H i l l D r L y n d s i e D r Qu a i l L n Falls Rd P arkview P l c G r e e n r i d g e D r Snowshill Tr Carter D r A s p e n w a y D r S SH 1 2 1 C o w b o y D r E SH 12 1 Fallkirk D r H a w k L n S SH 1 2 1 H w y Beechwood Ln M a d i s o n S t SH 121 Ramp Lee Dr S a n d e r s L p Red c e d a r W a y D r W i l l o w S p r i n g s Dr Cribbs Dr Swan D r Co t t o n w o o d D r Coral Dr Creek Crossi n g To w n C e n t e r B l v d S i m m o n s D r Raven L n En t e r p r i s e D r C oppersto n e T r Lex i n g t o n A v Trade C e n t e r D r Br a n c h w o o d T r A s h ley Dr Lake Pa r k D r C o u n t r y L n Woodlake Dr Bradford Dr Ha r r i s S t Cotton Rd B e r k s h i r e L n In g l e n o o k C t Shorew o o d D r P o i n t W e s t B l v d B i t t e r n ut Dr Brock St S H o l l y S t Wynnpage Dr Highland Dr T r i n i t y C t I635 - On Ramp 34 Houston St Layton Dr Mi l l T r Halifax Ln L a i r d s D r Charleston Dr Parr St Gateview Blvd H i d d e n Valley D r No r t h L a k e D r Pa r k R d Ho w e l l D r Stonecrest Dr Colonial Dr E Peninsula Dr Juniper Dr Clayton Cir Mo b l e y W a y Pintail C t Blue Ja y D r Do b e c k a D r Dove Cir K i m b e l K o u r t S t J a m e s P l Chaucer Ct Hackberry Rd Forestwood Ln W SH 1 2 1 SH 1 2 1 N SH 1 2 1 H w y Co t t o n R d ³ Service Area FIGURE 2-1CITY OF COPPELLSERVICE AREA Cr e a t e d B y F r e e s e a n d N i c h o l s , I n c . Jo b N o . : C P L 1 1 2 5 4 Lo c a t i o n : H : \ W _ W W _ P L A N N I N G \ D E L I V E R A B L E S \ 0 3 _ D R A F T _ W a t e r _ W a s t e w a t e r _ C I P _ R e p o r t \ ( F i g u r e _ 2 - 1 ) - S e r v i c e _ A r e a . m x d Up d a t e d : T h u r s d a y , D e c e m b e r 0 8 , 2 0 1 1 1 0 : 4 7 : 0 1 A M 0 2,500 SCALE IN FEET DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  2‐3  2.2 Historical Population The City of Coppell provided yearly population data from 2000 through 2010. The data  indicated an average growth rate of about 1% annual growth over the last 11 years.  Table 2‐1  presents the historical populations for the City of Coppell.  Table 2‐1 Historical Population  Year Population Population Growth Growth Rate 2000 36,051 ‐ ‐  2001 36,867 816 2.3% 2002 37,683 816 2.2% 2003 38,499 816 2.2% 2004 38,650 151 0.4% 2005 38,900 250 0.6% 2006 39,200 300 0.8% 2007 39,350 150 0.4% 2008 39,565 215 0.5% 2009 39,655 90 0.2% 2010 39,750 95 0.2% Average ‐ 370 1.0%    2.3 Projected Population Population projections were developed based on data provided by City staff.  FNI developed  initial population projections using geocoded billing data and existing and projected land use.   The City provided comments on the location of planned development and additional detail  about the existing land use.  Table 2‐2 presents the population projections for the City of  Coppell water and wastewater service area.  Figure 2‐2 shows the population projections by  TSZ.            Table 2‐2 Water and Wastewater Population Projections  Year Population Average Annual Population Growth Average Annual Growth Rate 2011 39,913 ‐ ‐  2021 41,632 172 0.4%  DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  2‐4  The projected growth in population is slightly less than the historical average due to the recent  slowdown of development and the natural slowdown in growth as the City approaches  buildout.    2.4 Land Use The City provided an existing land use shapefile, which included the current zoning.  A map of  the future land use was also provided by the City. In order to capture growth related to  commercial, retail, office, institutional, and industrial development, a commercial acreage for  each planning period was developed.  The existing land use data was used to calculate the 2011  commercial acreage and the future land use data was used to calculate the 2021 commercial  acreage.  The existing commercial acreage includes: developed nonresidential and  public/institutional.  The future commercial acreage includes: mixed use community center, old  Coppell historic district, mixed use neighborhood center, freeway special district, commercial,  institutional, and industrial special district.  Table 2‐3 and Figure 2‐2 present the non‐residential  acreage by planning year for the water and wastewater service area.      Table 2‐3 Non‐residential Acreage  Year Acres Growth in Acres 2011 2,220 ‐  2021 3,256 1,056       60845,0655,06564.85 Ac.45.49 Ac. 623500411.40 Ac.557.26 Ac. 60093,1913,19134.80 Ac.33.56 Ac. 60754141284.24 Ac.388.16 Ac. 60773,6163,85728.67 Ac.40.42 Ac. 60833,5923,59247.60 Ac.48.00 Ac. 403381,2001,47242.15 Ac.39.26 Ac. 60793,0803,16548.08 Ac.55.42 Ac. 61521,2621,34699.07 Ac.121.11 Ac. 301742,1802,2530.36 Ac.0.26 Ac. 607400218.01 Ac.266.34 Ac. 60121,6291,99630.82 Ac.29.68 Ac. 60811,7151,7182.89 Ac.5.24 Ac. 60822,4712,48330.38 Ac.40.68 Ac. 301731,2271,305101.50 Ac.105.96 Ac. 615000153.35 Ac.302.44 Ac. 60030085.74 Ac.289.78 Ac. 60781,9731,97356.93 Ac.56.94 Ac. 402111,9321,9691.43 Ac.1.41 Ac. 6238103103129.59 Ac.221.40 Ac. 615153162848.63 Ac.84.74 Ac. 60063383414.70 Ac.9.95 Ac. 60761,4331,43356.91 Ac.54.40 Ac. 60802,5142,59632.63 Ac.40.43 Ac. 24456526522.46 Ac.39.36 Ac. 62340086.26 Ac.122.23 Ac. 40061001.53 Ac.54.36 Ac. 403210054.83 Ac.82.96 Ac. 6237000.00 Ac.0.00 Ac. 40236007.37 Ac.39.10 Ac. 244716244720.94 Ac.24.32 Ac.6007002.97 Ac.13.18 Ac. 6236000.00 Ac.0.00 Ac. 90630011.80 Ac.20.68 Ac. 9062000.00 Ac.0.00 Ac. 60086616.67 Ac.21.93 Ac. I6 3 5 . . SANDY LAKE RD. BELT LINE RD. BETHEL RD. DE N T O N T A P R D . RO Y A L L N . PARKWAY BLVD. MACA R T H U R B L V D . F R E E P O R T P K W Y . M O O R E R D . SH 121 . BETHEL SCHOOL RD. SH 1 2 1 H W Y . SH 1 2 1 S E R V I C E R . AIRLINE DR. CO P P E L L R D . DIVIDEND DR. CR E E K V I E W D R . SA M U E L B L V D . DEFOREST RD. MO C K I N G B I R D L N . RIVERCHASE DR. RUBY RD. P I N Y O N L N . CO U N T Y L I N E R D . GATEWAY BLVD. P H I L L I P S D R . HI L L D R . L E D B E T T E R R D . STA R L E A F S T . A L L E N R D . PELICAN LN. SHADOWCREST LN. CANYON DR. MALLARD D R . KAYE ST. BURNS ST. C O VE DR . GREENWAY DR. W I N D I N G H O L L O W L N . MINYARD DR. BA R C L A Y A V . MAPLELEAF LN. BRIARGLEN DR. ED G E W O O D D R . CRESTVIEW DR. BR I C K N E L L L N . QUAIL LN. MARTEL LN. A S P E N W A Y D R . ALEX DR. HALIFAX DR. G R E E N RIDGE DR. O A K B E N D D R . HOOD DR. HE A T H E R G L E N D R . C A RTER D R . SUGARBERRY DR. SA N D E R S L P . CHRISTI LN. BRAEWO OD DR. A C E L N . CRIBBS DR. P A R K W O O D L N . NATCHE S T R A C E . C H A T E A U S D R . T O W N C E N T E R B L V D . RAVEN LN. ROBIN LN. DILLARD LN. TOWN CENTER DR. L E X I N G T O N A V . CO P P E R S T O N E T R . LESLIE LN. RO L L I N G H I L L S R D . I635 - O N RAMP 34 . VANBEBBER DR. WALES CT. HA M M O N D S T . FOREST RIDGE DR. HO L L Y S T . F A I R W A Y D R . SH 1 2 1 R D . GRAYWOOD LN. P O I N T W E S T B L V D . COTTON RD. G L ADE POINT DR. H A R R I S R D . SPARROW LN. AN D E R S O N A V . TA N B A R K C I R . T R I N I T Y C T. LO C H L N . WESTMINSTER WAY. B L A C K OAK C I R . BU L L O C K D R . FITNESS CT. MI L L T R . SANDY OAK LN. O L Y M PIA LN. PHEASANT LN. KINGSRIDGE DR. BEAU DR. HO W E L L D R . COATS ST. GRAPEVINE CREEK DR. COLONIAL DR. BET H E L S C H O O L C T . GLEN LAKE S D R . JUNIPER DR.FIELDCREST LP . OAKB R O O K D R . BR O W N T R . BRIARCOVE LN. S T J A M E S P L . WILD PLUM DR. RUSTIC M E A D O W W A Y . AUTUMN LN. HA R T F O R D C I R . I635 . . SH 121 . SANDY LAKE RD. SH 12 1 . SH 121 . CO P P E L L R D . SH 1 2 1 . SH 1 2 1 . S H 1 2 1 H W Y . . SH 12 1 . SH 1 2 1 S E R V I C E R . SH 12 1 R D . ³ 0 1,200 2,400 SCALE IN FEET LEGEND TSZ Boundaries Streets Parcel City Limits Lake FIGURE 2-2CITY OF COPPELLPOPULATION ANDNON-RESIDENTIAL ACRES BY TSZ Created By Freese and Nichols, Inc.Job No.: CPL11254Location: H:\W_WW_PLANNING\DELIVERABLES\03_DRAFT_Water_Wastewater_CIP_Report\(Figure_2-2)-Pop_and_Non-Residential_Ac_by_TSZ.mxdUpdated: Thursday, December 08, 2011 10:47:16 AM TSZ ID2011 Population2021 Population2011 Comm. Acres2021 Comm. Arces DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  3‐1  3.0 CAPITAL IMPROVEMENTS PLAN An impact fee capital improvements plan (CIP) was developed for the City of Coppell to ensure  high quality water and wastewater service that promotes residential and commercial  development.  The recommended improvements will provide the required capacity and  reliability to meet projected water demands and wastewater flows through year 2021.  3.1 Water and Wastewater Load Projections The population and land use data was used to develop future water demands and wastewater  flows based on a projected average day per capita use and peaking factors.  Based on historical  water usage and wastewater flows, design criteria were developed.  The design criteria for  water and wastewater are presented in Table 3‐1 and Table 3‐2, respectively.  Table 3‐3  presents the projected water demands. Table 3‐4 presents the projected wastewater flows for  the City of Coppell.   Table 3‐1 Water Design Criteria  Average Residential Usage (gpcd) Average Day Commercial Water Usage (gpd/acre) Maximum Day to Average Day Peaking Factor Peak Hour to Maximum Day Peaking Factor 140 2,000 2 2   Table 3‐2 Wastewater Design Criteria  Average Daily Residential Loading (gpcd) Average Daily Commercial Loading (gpd/acre) Peak Wet Weather to Average Daily Peaking Factor 75 700 4 DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  3‐2    Table 3‐3 Projected Water Demands  Year Average Day Demand (MGD) Maximum Day Demand (MGD) Peak Hour Demand (MGD) 2011 10.0 20.1 40.1 2021 12.3 24.7 49.4   Table 3‐4 Projected Wastewater Flows  Year Average Annual Daily Flow (MGD) Peak Wet Weather Flow (MGD) 2011 4.55 18.19 2021 5.40 21.61     DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  3‐3  3.2 Water and Wastewater System Improvements FNI developed proposed water and wastewater system improvements based on the results of  the hydraulic models.  The City of Coppell is approaching buildout and the existing water and  wastewater systems are appropriately sized to meet future demands and loads.  The cost for  the project required for the 10‐year growth period used in the impact fee analysis for both the  water systems is shown in Table 3‐5.  Costs listed for the existing projects are based on actual  design and construction costs provided by the City.  Detailed cost estimate for the proposed  water system project is included in Appendix A.  Tables 3‐5 and 3‐6 show 2011 percent  utilization as the portion of a project’s capacity required to serve existing development.  It is  not included in the impact fee analysis.  The 2021 percent utilization is the portion of the  project’s capacity that will be required to serve the City of Coppell in 2021.  The 2011‐2021  percent utilization is the portion of the project’s capacity required to serve development from  2011 to 2021.  The portion of a project’s total cost that is used to serve development projected  to occur from 2011 through 2021 is calculated as the total actual cost multiplied by the 2011‐ 2021 percent utilization.  Only this portion of the cost is used in the impact fee analysis.  The  10‐year water system projects are shown on Figure 3‐1.  The 10‐year wastewater projects are  shown on Figure 3‐2.   DR A F T  Wa t e r ,  Wa s t e w a t e r  an d  Ro a d w a y  Im p a c t  Fe e  Re p o r t   Ci t y  of  Co p p e l l   3 ‐4   Ta b l e  3 ‐5   Wa t e r  Sy s t e m  Im p a c t  Fe e  El i g i b l e  Pr o j e c t s   No . De s c r i p t i o n of Pr o j e c t Pe r c e n t U t i l i z a t i o n Co s t B a s e d o n 2 0 1 1 D o l l a r s 20 1 1 *   20 2 1   20 1 1 ‐ 20 2 1   Ca p i t a l  Co s t   Cu r r e n t   De v e l o p m e n t   10 ‐Year      (2 0 1 1 ‐2021) Beyond  2021   EX I S T I N G PR O J E C T S A   24 ‐in c h  Sa n d y  La k e  Ro a d  an d  Co p p e l l  Ro a d  wa t e r   li n e  fr o m  De n t o n  Ta p  Ro a d  to  Wa g o n  Wh e e l  ES T   65 %   10 0 %   35 %   $9 8 5 , 0 3 0   $6 4 0 , 2 7 0   $344,761  $0   B   12 ‐in c h  wa t e r  li n e  al o n g  Ru b y  Ro a d  fr o m  Ro y a l  La n e   to  Co p p e l l  Ro a d   90 %   10 0 %   10 %   $3 2 4 , 4 8 0   $2 9 2 , 0 3 2   $32,448  $0   C   12 ‐in c h  wa t e r  li n e  al o n g  we s t e r n  ed g e  of  Ci t y  fr o m   No r t h p o i n t  Dr i v e  to  Ga t e v i e w  Dr i v e   80 %   10 0 %   20 %   $5 2 6 , 3 2 0   $4 2 1 , 0 5 6   $105,264  $0   D   Wa g o n  Wh e e l  2. 0  MG  ES T   50 % 75 % 25 % $2 , 7 8 6 , 9 9 0 $1 , 3 9 3 , 4 9 5 $696,748 $696,748 E   Vi l l a g e  Pa r k w a y  Pu m p  #6   20 % 10 0 % 80 % $2 7 3 , 6 0 7 $5 4 , 7 2 1 $218,886 $0 F   30 ‐in c h  Sa n d y  La k e  Ro a d  wa t e r  li n e  fr o m  Ma c A r t h u r   Bl v d .  to  De n t o n  Ta p  Ro a d   80 %   10 0 %   20 %   $1 , 8 6 2 , 7 2 0   $1 , 4 9 0 , 1 7 6   $372,544  $0   G   16 ‐in c h  wa t e r  li n e  fr o m  Be t h e l  Ro a d  to  Ai r l i n e  Dr i v e   al o n g  De n t o n  Ta p   65 %   10 0 %   35 %   $8 0 4 , 7 0 8   $5 2 3 , 0 6 0   $281,648  $0   H   12 ‐in c h  SH  12 1  wa t e r  li n e  fr o m  Co p p e l l  Ro a d  to   De n t o n  Ta p   90 %   10 0 %   10 %   $6 1 5 , 1 0 9   $5 5 3 , 5 9 8   $61,511  $0   I   12 ‐in c h  wa t e r  li n e  al o n g  Be l t  Li n e  Ro a d  an d  we s t   al o n g  IH  63 5  fr o m  th e  ex i s t i n g  12 ‐in c h  wa t e r  li n e  of   La k e s h o r e  Dr i v e  to  th e  ex i s t i n g  12 ‐in c h  wa t e r  li n e  at   Fr e e p o r t  Pa r k w a y   10 %   90 %   80 %   $1 , 4 3 5 , 2 0 0   $1 4 3 , 5 2 0   $1,148,160  $143,520   J   Im p a c t  Fe e  St u d y   0% 10 0 % 10 0 % $4 0 , 0 0 0 $0 $40,000 $0 Ex i s t i n g  Pr o j e c t  Su b ‐to t a l   $9 , 6 5 4 , 1 6 3 $5 , 5 1 1 , 9 2 8 $3,301,968 $840,268 PR O P O S E D PR O J E C T S 1   Re p l a c e m e n t  of  ex i s t i n g  12 ‐in c h  wi t h  a  20 ‐in c h   wa t e r  li n e  fr o m  th e  So u t h w e s t e r n  El e v a t e d  St o r a g e   Ta n k   40 %   90 %   50 %   $1 , 1 3 4 , 6 6 0   $4 5 3 , 8 6 4   $567,330  $113,466   Pr o p o s e d  Pr o j e c t  Su b ‐to t a l   $1 , 1 3 4 , 6 6 0 $4 5 3 , 8 6 4 $567,330 $113,466 To t a l C o s t $1 0 , 7 8 8 , 8 2 3 $5 , 9 6 5 , 7 9 2 $3,869,298 $953,734 * Ut i l i z a t i o n  in  20 1 1  on  Pr o p o s e d  Pr o j e c t s  in d i c a t e s  a  po r t i o n  of  th e  pr o j e c t  th a t  wi l l  be  us e d  to  ad d r e s s  de f i c i e n c i e s  wi t h i n  th e  ex i s t i n g  system,and  therefore   ar e  no t  el i g i b l e  fo r  im p a c t  fe e  co s t  re c o v e r y  fo r  fu t u r e  gr o w t h .    DR A F T  Wa t e r ,  Wa s t e w a t e r  an d  Ro a d w a y  Im p a c t  Fe e  Re p o r t   Ci t y  of  Co p p e l l   3 ‐5   Ta b l e  3 ‐6   Wa s t e w a t e r  Sy s t e m  Im p a c t  Fe e  El i g i b l e  Pr o j e c t s   No . De s c r i p t i o n of Pr o j e c t Pe r c e n t U t i l i z a t i o n Co s t B a s e d o n 2 0 1 1 D o l l a r s 20 1 1 *   20 2 1   20 1 1 ‐ 20 2 1   Ca p i t a l  Co s t   Cu r r e n t   De v e l o p m e n t   10 ‐Year (2 0 1 1 ‐2021) Beyond  2021   EX I S T I N G PR O J E C T S A   Ex i s t i n g  30 ‐in c h  fo r c e m a i n  in  Ba s i n  C 80 % 10 0 % 20 % $1 , 1 6 4 , 0 0 0 $9 3 1 , 2 0 0 $232,800 $0 B   Ex i s t i n g  24 ‐in c h  gr a v i t y  li n e  in  Ba s i n  A 90 % 10 0 % 10 % $1 , 4 7 6 , 0 0 0 $1 , 3 2 8 , 4 0 0 $147,600 $0 C   Ex i s t i n g  21 ‐in c h  gr a v i t y  li n e  in  Ba s i n  A 85 % 10 0 % 15 % $3 5 7 , 6 0 0 $3 0 3 , 9 6 0 $53,640 $0 D   Ex i s t i n g  18 ‐in c h  gr a v i t y  li n e  in  Ba s i n  A 85 % 10 0 % 15 % $3 2 1 , 6 0 0 $2 7 3 , 3 6 0 $48,240 $0 E   Ex i s t i n g  15 ‐in c h  gr a v i t y  li n e  in  Ba s i n  A 85 % 10 0 % 15 % $4 2 8 , 4 0 0 $3 6 4 , 1 4 0 $64,260 $0 F   Ex i s t i n g  21 ‐in c h  gr a v i t y  li n e  in  Ba s i n  B 75 % 10 0 % 25 % $3 5 7 , 6 0 0 $2 6 8 , 2 0 0 $89,400 $0 G   Ex i s t i n g  27 ‐in c h  gr a v i t y  li n e  in  Ba s i n  B 75 % 10 0 % 25 % $7 5 1 , 8 0 0 $5 6 3 , 8 5 0 $187,950 $0 H   Ex i s t i n g  15 / 2 4 ‐in c h  gr a v i t y  li n e  in  Ba s i n  E 80 % 95 % 15 % $1 , 0 4 5 , 8 0 0 $8 3 6 , 6 4 0 $156,870 $52,290 I   Ex i s t i n g  30 ‐in c h  gr a v i t y  li n e  in  Ba s i n  C  an d  E 80 % 95 % 15 % $2 , 2 6 3 , 2 0 0 $1 , 8 1 0 , 5 6 0 $339,480 $113,160 J   Sa i n t  Jo n e s  30 ‐in c h  fo r c e m a i n  (d i s c h a r g e  fr o m   De f o r e s t  PS )   80 %   10 0 %   20 %   $2 , 3 1 2 , 0 4 1   $1 , 8 4 9 , 6 3 3   $462,408  $0   K   Ex i s t i n g  20 ‐in c h  fo r c e m a i n  fr o m  Sa n d y  La k e  Li f t   St a t i o n   80 %   10 0 %   20 %   $1 , 1 7 2 , 7 5 0   $9 3 8 , 2 0 0   $234,550  $0   L   Up s i z e  De f o r e s t  an d  Sa n d y  La k e  Li f t  St a t i o n s 80 % 10 0 % 20 % $2 , 6 1 1 , 7 4 2 $2 , 0 8 9 , 3 9 3 $522,348 $0 M   Ex i s t i n g  12 ‐in c h  gr a v i t y  li n e  in  No r t h w e s t  se c t i o n  of   Ba s i n  A   70 %   10 0 %   30 %   $1 , 1 2 3 , 2 0 0   $7 8 6 , 2 4 0   $336,960  $0   N   Im p a c t  Fe e  St u d y   0% 10 0 % 10 0 % $4 0 , 0 0 0 $0 $40,000 $0 Ex i s t i n g  Pr o j e c t  Su b ‐to t a l   $1 5 , 4 2 5 , 7 3 3 $1 2 , 3 4 3 , 7 7 6 $2,916,507 $165,450 To t a l C o s t $1 5 , 4 2 5 , 7 3 3 $1 2 , 3 4 3 , 7 7 6 $2,916,507 $165,450 * Ut i l i z a t i o n  in  20 1 1  on  Pr o p o s e d  Pr o j e c t s  in d i c a t e s  a  po r t i o n  of  th e  pr o j e c t  th a t  wi l l  be  us e d  to  ad d r e s s  de f i c i e n c i e s  wi t h i n  th e  ex i s t i n g  system, and  therefore   ar e  no t  el i g i b l e  fo r  im p a c t  fe e  co s t  re c o v e r y  fo r  fu t u r e  gr o w t h .       [Ú [Ú UT UT (#UT (#UT 1.5 MG Southwestern ESTOverflow Elev.: 672.5 ft. 2.0 MG Wagon Wheel ESTOverflow Elev.: 672.5 ft. Village Parkway PS6.0 MG GST4.0 MG GST41.0 MGD Firm Capacity ,1 ,A ,F,A ,A ,A ,F ,E ,B,B ,C ,G ,G ,1 ,H ,H ,H ,I ,I ,I ,I ,D 12'' 24 ' '30'' 16 ' ' 8'' 1 2 ' ' 12'' 30'' 12 ' ' 12'' 24'' 30'' 24'' 16 ' ' 24'' 16'' 16 ' ' 24'' 12'' 16 ' ' 16 ' ' 24'' 12'' 12'' 12 ' ' 12 ' ' 12 ' ' 24'' 12 ' ' 24'' 24'' 16 ' ' 24'' 12'' 30'' 12 ' ' 30'' 16'' 12'' 30'' 12'' 12'' 30'' 12'' 16 ' ' 16'' 12 ' ' 24'' 12'' 12'' 12'' 24'' 12'' 30'' 12'' 30''30'' 12'' 30''30'' 12 ' ' 24'' 16 ' ' 12'' 3 0 ' ' 12'' 30'' 12 ' ' 12'' 12'' 30''24''30'' 20 ' ' 20 ' ' 20''20'' 20 ' ' 20'' E I 6 3 5 W I635 E Belt Line Rd Fr e e p o r t P k w y S R o y a l L n W Bethel Rd E S a n d y L a k e R d S B e l t L i n e R d W Sandy Lake Rd N Mac A r t h u r B l v d E Bethel School Rd E Parkway Blvd N D e n t o n T a p R d Airline Dr SH 12 1 S D e n t o n T a p R d S M o o r e R d Dividend Dr S C o p p e l l R d W SH 121 Lo d g e R d S M a c A r t h u r B l v d Deforest Rd C r e ekview Dr Sa m u e l B l v d Wrangler Dr N SH 1 2 1 H w y N SH 1 2 1 S e r v i c e R N M o o r e R d Mo c k i n g b i r d L n W P a r k w a y B l v d N C o p p e l l R d E SH 1 2 1 S e r v i c e R Riverchase Dr Ruby Rd N H e a r t z R d No r t h p o i n t D r S H e a r t z R d Fritz Dr Falcon Ln Southwestern Blvd Hi l l D r Star l e a f S t Park V a l l e y Dr Pin y o n L n P h i l l i p s D r Plantation Dr Gateway Blvd Patri o t D r Al l e n R d L e d b e t t e r R d W SH 1 2 1 S e r v i c e R Pelican Ln Malla r d D r S C o u n t y L i n e R d Woo d h u r s t D r E Bethe l R d Wate r v i e w D r Shadowcrest Ln Brooks Ln Kaye St Burns St Canyon Dr Meado w c r e e k R d S SH 1 2 1 S e r v i c e R G r a h a m D r S p y g l a s s D r Oa k T r Cove Dr Gi f f o r d D r Greenway Dr Briarglen Dr V i l l a g e P k wy Bar c l a y A v Blue J a y L n Mapleleaf Ln Cozby Av V i l l a w o o d L n Minyard Dr Lake Vista Dr Wind i n g H o l l o w L n M e a d o w R u n Crestview Dr Martel L n La k e s h o r e D r Br i c k n e l l L n Woodmoor Dr Alex Dr Ed g e w o o d D r Halifax Dr Pecan Hollow Dr Tupelo Dr Fore s t H i l l D r Lyndsie Dr Quail Ln Falls Rd Parkview Plc Cooper Ln G r e e n r i d g e Dr Snowshill Tr Wh i s p e r i n g H i l l s D r C arter Dr Asp e n w a y D r S SH 1 2 1 Co w b o y D r E SH 1 2 1 F a l l k i r k D r H a w k L n K il b r i d g e L n S SH 1 2 1 H w y Tim b e r R i d g e L n Oa k b e n d D r Beechwood Ln Hood Dr Cr e s t s i d e D r He a t h e r G l e n D r Sa n d y K n o l l D r SH 12 1 - E x i t Con d o r D r D o g w o o d Tr Me a d o w g l e n C i r M a d i s o n S t SH 121 R a m p Lee Dr Meado wview L n S anders L p Redcedar Way Dr Christi Ln Willow Spri n g s D r Cribbs Dr W ille t D r Grace Ln P a r k e r D r Oriole Ln Swan Dr C o t t o n w o o d D r St r a t f o r d L n A c e L n Coral Dr Dillard Ln Cr e e k s i d e L n Kyle D r Cr e e k C r o s si n g Cha t e a u s D r Levee Pl P a r k w o o d L n Crane Dr P l a z a B l v d W e llin gto n Rd Barrington Dr Ex e c u t i v e D r To w n C e n t e r B l v d M a g n o l i a D r Si m m o n s D r Oa k c r e s t L n Travis St Ch e r r y b a r k D r Raven Ln En t e r p r i s e D r Copperst o n e T r Gibbs Cros s i n g Wal n u t G r ove Ln Ro l l i n g H i l l s R d Robin Ln Wales Ct Basilwood Dr L e x i n g t o n A v Trad e C e n t e r D r Br a n c h w o o d T r Ashley Dr Vanbebber Dr Marlee Cir Di c k e n s D r L e a v a l l e y L n F a i r w a y D r Ha r w e l l S t Lake Park D r R o cky Bran c h L n L a g u n a L n Meadowood Ln Forest Ridge Dr Wr a n g l e r C i r Be a c o n H i l l D r Beal Ln Lo n d o n W a y Co u n t r y L n A r b o r Brook Ln Ashfo r d D r C a m b r i a D r E Nat c h e s T r a c e Woodl a k e D r B r a d ford Dr Cas t l e C r e e k D r Ha r r i s S t De a n n D r Duncan Dr Cotton Rd E I635 - Exit 33 Service R Sh a d y d a l e L n Avalon Ln B e r k s h i r e L n Ha m m o n d S t Graywood Ln In g l e n o o k C t Sp r i n g o a k L n Johnson Dr H a r r i s R d Glade Point Dr W B e t h e l S c h o o l R d L a k e F o r e s t D r S h o r e w o od D r Sparrow Ln B itternut Dr Brock St Swallow Dr Havencrest Ln S H o l l y S t Wynnpage Dr Ta n b a r k C i r Highland Dr T r i n i t y C t I635 - O n Ramp 34 Houston St Kingsmill Ct Layton Dr Cardinal Ln An d e r s o n A v Fi n c h L n Steamboat Dr Mi l l T r Mullran y D r Te a l w o o d D r Halifax Ln Tr a i l w o o d L n R e d w i n g D r Pebble Creek Dr Gr e e n t r e e D r Lai r d s D r Thompson Dr L o n g m e a d o w D r River Rd N ewport Dr A n d o v e r L n Al l e n c r e s t L n Park M e a d o w W a y Dalm a l l e y L n Charleston Dr Rockcre s t D r Lo c h L n Wo o d c r e s t L n Hu n t e r s R i d g e R d S t i l l F o r e s t D r Glendale Dr B e v e r l y D r G a t e v i e w B l v d Clear Creek Ln Oak Grove Ln Te n n y s o n P l c C a m b r i d g e M a n o r L n Hi d d e n V a l l e y D r E d i n b u r g h L n Bl a c k O a k C i r No r t h L a k e D r Gl e n w o o d D r Brentwood Dr Westminster Way Fitness Ct R aintree Cir C h es hi re Dr W Town Cent e r D r M e a d o w l a r k L n P e p p e r w o o d S t Harrison Dr We s t l a k e D r S a d d l e T ree Tr H i g h l a n d M e a d o w D r Pa r k R d Pheasant Ln Kingsridge Dr Lockhaven Ln Post Oak Dr Wi l l i n g h a m D r Alendale Dr W I635 - Exit 35 Service R Ho w e l l D r Ni x o n S t Chestnut Ln Fl a g s t o n e L n Span i s h M o s s D r W e s t c h e s t e r D r W e s t w i n d D r La keview Dr Sandy Oak Ln O l y mpia Ln Beau Dr O l d Y o r k R d Gi b s o n C t Hearthw ood Dr Loxley Dr Kirkland Dr Pa r i s h P l c Coats St P enuel D r Stonecrest Dr Archer Dr Sa n d P o i n t C t C halfon t P l c Colonial Dr So r a L n Ma n c h e s t e r L n La k e w o o d C t Suzanne Way T u r n b e r r y L n De f o r e s t C t C r e s t w o o d D r Me s q u i t e w o o d S t W B raewood Dr Pine hurst Dr Beth e l S c h o o l C t I 6 3 5 - E xit 3 4 Cooper E Peninsula Dr Fa i r v i e w C t D a k o t a Ln B r i t t a n y D r S l e e p y H o l l o w L n E I635 - E x i t 3 5 S e r v i c e R Woodw a y Grapevine Creek Dr Ha m p t o n C t Juniper Dr Glen Lakes D r Field c r e s t L p Wrenwood Dr P r e s t w i c k C t Mo b l e y W a y N a t c h e s T r a c e Greenwich Ln Pen f o l d s L n Oakb r o o k D r Bro w n T r Stringfellow Dr S H 1 2 1 - t u r n a r o u n d K i l m i c h a e l D r Brean n a W a y Teal Cove Autumnwood Ln E x c h a n g e C i r H ighla n d W a y Pin t a i l C t Briarcove Ln H i d d e n H o l l o w C t Grace Dr Blue J a y D r Do b e c k a D r Dove Cir E I635 - On R a m p 3 5 S e r v i c e R B e n t T r e e C r t A r m s t r o n g B l v d C l e a r H a v e n R d S t J a m e s P l K a i l e y W a y H u m m i n g b i r d D r Leisure Ln Re d w o o d D r Tanglewood Ln Br i c k n e l l D r St a t e C h a m p i o n P k w y C a s t l e b u r y C t Cross Timbers Tr So u t h e r n B e l l e D r Br y a n L n 0 Hood Dr Ridgewood Dr C a nemoun t L n M a t h e s o n C t Ind i a n R o c k D r Forestwood Ln C h i n a b erry Way D r i f t w o o d D r Warren Crossing Brighton Ln Austin Ct Edmondson Dr Warwick Ln Independence Dr Biltmore Ct Willow Ln Ba y C i r Encl a v e s C r t W Penins u l a D r Woodh i l l S t Gifford C t Ma r t e l C r t Tara Ct Be a v e r R u n D r H e a r t h stone Ln Alde r C t S heffield Ct Roundrock Cir V ill a g e Green Dr Spanish Moss Ct We s t m i n s t e r C t H a m p t o n D r Rockcrest Ct Wh ite S p r u c e D r S u n r i s e D r Lakeview C r o o k e d T r e e C t Tana g e r D r Stanton Ct Ha r t f o r d C i r Re e d e r D r Wo o d l a n d C o v e Mi t c h e l l S t T o w e r C t E l m F o r k D r W e s t w o o d C t Willow Springs Ct No r t h w e s t e r n D r A p p l e c r o s s C t Carriage Ct Flintshire W a y Se a H a w k C t Clare m o n t C t Cre s t v i e w C t Eastgate Dr Mariners Ct Maywoo d C i r Gl e n c r e s t C i r De l t a C t Maso n C t Elmhill Ct Cuttingham Ct Hardwick Ct P a r k V a l l e y C t Shiloh Ct Fountain Head Ln Crane Cir Elmvale Ct Ro l l i n g H i l l s C i r We s t b u r y C t Che l s e a B a y A s h e r C t Leisure Ct Gr a y w o o d C t E SH 1 2 1 S e r v i c e R E Parkw a y B l v d S SH 1 2 1 S e r v i c e R S SH 1 2 1 S e r v i c e R SH 1 2 1 Meadowglen Cir S H 1 2 1 R a m p I635 - On Ram p 34 E Sandy Lake Rd E S H 1 2 1 S e r v i c e R Co t t o n R d W r a n g l e r C i r I635 - E x i t 3 4 N SH 1 2 1 H w y Fre e p o r t P k w y N SH 1 2 1 S e r v i c e R S H 1 2 1 - t u r n ar o u n d A s p e n w a y D r E SH 12 1 N SH 121 Service R S C o p p e l l R d D u n c a n D r 24'' 12 ' ' 10'' 16'' 1 0 ' ' 12'' 16'' 12 ' ' 16'' 12 ' ' 12'' 16'' 1 2 ' ' 12 ' ' 12 ' ' 12 ' ' 12 ' ' 12 ' ' 16'' 12 ' ' 16'' 12'' 1 2 ' ' 12'' 12'' 1 6 ' ' 12 ' ' 1 6 ' ' 10 ' ' 16'' 10'' 1 0 ' ' 12 ' ' 24 ' ' 12'' 12'' 12'' 12'' 24'' 12' ' 12'' 12'' 12 ' ' 1 2 ' ' 10'' 12 ' ' 16'' 12 ' ' 16 ' ' 10'' 1 2 ' ' 24'' 16'' 12'' 12'' 16'' 16'' 12'' 12'' 12'' 12'' 12 ' ' 12'' 12'' 1 0 ' ' 1 2 ' ' 10 ' ' 16'' 10 ' ' 12 ' ' 12'' 12' ' 10'' 12'' 12'' 12'' 1 2 ' ' 1 6 ' ' 10'' 1 2 ' ' 16'' 12 ' ' 12'' 12'' 12'' 12' ' 16'' 12'' 12'' 10'' 24''12 ' ' 16'' 12'' 16 ' ' 10'' 12'' 12'' 12'' 1 6 ' ' 24'' 12'' 16'' 12'' 1 2 ' ' 12'' 16 ' ' 12 ' ' 12'' 10 ' ' 16 ' ' 1 6 ' ' 12'' 16 ' ' 12'' 1 2 ' ' 16'' 12'' 12'' 12'' 1 0 ' ' 16'' 16'' 12'' 12'' 16'' 10 ' ' 12'' 12 ' ' 1 6 ' ' 12'' 12'' 24 ' ' 24'' 1 2 ' ' 12 ' ' 16'' 16'' 12'' 12 ' ' 1 2 ' ' 16'' 1 2 ' ' 12 ' ' 10'' 1 2 ' ' 16 ' ' 1 2 ' ' 12'' 16'' 12 ' ' 12 ' ' 12'' 16' ' 12 ' ' 12'' 12'' 12'' 1 2 ' ' 16'' 12 ' ' 12 ' ' 12'' 10 ' ' 12 ' ' 12 ' ' 1 6 ' ' 12 ' ' 12 ' ' 16 ' ' 12'' 1 0 ' ' 12'' 12 ' ' 12'' 16 ' ' 10 ' ' 12'' 1 6 ' ' 12 ' ' 16'' 12'' 12'' 12' ' 12'' 16 ' ' 16'' 1 2 ' ' 1 6 ' ' 12'' 16'' 12 ' ' 12'' 12 ' ' 10 ' ' 16 ' ' 16 ' ' 12'' 16 ' ' 12 ' ' 16 ' ' 12'' 12 ' ' 1 2 ' ' 12 ' ' 10 ' ' 12'' 16'' 16 ' ' 12'' 12 ' ' 10'' 12'' 16 ' ' 12'' 16'' 1 0 ' ' 12'' 16'' 12 ' ' 12 ' ' 2 4 ' ' 10'' 12'' 12'' 16' ' 1 2 ' ' 12'' 12'' 24 ' ' 10'' 1 2 ' ' 12 ' ' 24'' 16'' 12'' 12 ' ' 12 ' ' 16 ' ' 16'' 12'' 1 2 ' ' 12'' 10'' 1 2 ' ' 12'' 24'' 10 ' ' 10'' 16'' 12'' 1 6 ' ' 12 ' ' 16'' 1 6 ' ' 1 6 ' ' 16 ' ' 1 6 ' ' 12'' 12'' 16 ' ' 12 ' ' 16'' 12 ' ' 1 6 ' ' 10 ' ' 12 ' ' 10'' 12'' 12'' 12 ' ' 1 2 ' ' 16'' 12'' 12 ' ' 10 ' ' 24'' 12 ' ' 16 ' ' 12'' 12 ' ' 12 ' ' 12'' 12 ' ' 16'' 24'' 12'' 12'' 12'' 16''1 2 ' ' 12 ' ' 12'' 16'' 12'' 12'' 24'' 16 ' ' 2 4 ' ' 1 2 ' ' 16 ' ' 12 ' ' 12 ' ' 24'' 12 ' ' 1 2 ' ' 12'' 16'' 16'' 12'' 12''10'' 12'' 12'' 12'' 12 ' ' 16 ' ' 10 ' ' 10'' 16'' 12'' 12'' 12 ' ' 12'' 12'' 1 2 ' ' 16'' 12 ' ' 16 ' ' 1 0 ' ' 12 ' ' 16 ' ' 16'' 12 ' ' 16'' 10'' 12 ' ' 12'' 12 ' ' 12'' 12 ' ' 1 2 ' ' 12 ' ' 12 ' ' 1 0 ' ' 8' ' 6'' 2' ' 4'' 3' ' 1'' 0'' 8' ' 8' ' 8'' 8'' 8'' 6''6' ' 8 ' ' 8'' 6' ' 8 ' ' 6' ' 8'' 8'' 8''8'' 6'' 8'' 8'' 6'' 8'' 6'' 8'' 8'' 6' ' 8'' 8' ' 8' ' 8'' 8''6'' 8'' 6' ' 8' ' 8 ' ' 8'' 8' ' 6' ' 8' ' 8 ' ' 8' ' 6'' 8'' 8'' 8'' 6' ' 8' ' 8' ' 8'' 8'' 8 ' ' 8'' 8'' 8'' 8'' 8' ' 8'' 6 ' ' 8'' 8 ' ' 8'' 8'' 8' ' 8' ' 8'' 8'' 8'' 8' ' 8'' 8' ' 8'' 8'' 8'' 8' ' 8' '8'' 8'' 8'' 2'' 8'' 8'' 8' ' 8'' 8'' 8'' 8'' 6'' 8'' 6'' 8' ' 8' ' 8'' 8 ' ' 8 ' ' 6' ' 8'' 8 ' ' 8' ' 8'' 8'' 8' ' 6' ' 8'' 8'' 8'' 8 ' ' 8'' 6' ' 8'' 8 ' ' 8'' 8'' 8'' 8'' 8'' 8'' 8' ' 8'' 8'' 8 ' ' 8'' 8' ' 8'' 8'' 6' ' 8'' 6' ' 8'' 2'' 6' ' 4''8' ' 8' ' 8 ' ' 8'' 6'' 8'' 8'' 6'' 8'' 6' ' 8'' 8'' 8'' 8' ' 8' ' 6'' 8 ' ' 6' ' 8'' 8'' 8'' 8' ' 6'' 8' ' 8'' 8'' 8'' 8' ' 8'' 8'' 6'' 8' ' 8' ' 6'' 8' ' 8 ' ' 8'' 8'' 6' ' 8' ' 8' ' 8'' 6' ' 6'' 8' ' 8' ' 8'' 8'' 8'' 8'' 8'' 8'' 8' ' 6' ' 6'' 8' ' 8'' 8 ' ' 8 ' ' 8'' 8' ' 8'' 8 ' ' 8'' 8'' 8' ' 8'' 8'' 8'' 8'' 8'' 8' ' 8' ' 6' ' 8' ' 8'' 8 ' ' 8'' 8'' 6'' 8'' 8'' 6'' 8'' 8' ' 8' ' 6'' 8' ' 8'' 8'' 8' ' 8'' 6'' 8'' 8' ' 6' ' 8'' 8'' 8' ' 6'' 8'' 8' ' 8'' 8'' 8 ' ' 8'' 8 ' ' 8'' 8' ' 8'' 8' ' 4'' 8' ' 8'' 8' ' 6' ' 8'' 8'' 8'' 6''6'' 8 ' ' 8 ' ' 8' ' 6'' 8'' 8'' 6'' 8'' 8'' 8'' 8'' 8' ' 6'' 8'' 8'' 8'' 8'' 8'' 8' ' 8'' 8 ' ' 8'' 8'' 8'' 6'' 8'' 8'' 6' ' 8'' 8' ' 6' ' 8'' 8' ' 8'' 6'' 8'' 8'' 8 ' ' 8'' 8'' 6'' 8'' 8'' 8'' 8'' 8 ' ' 8 ' ' 8'' 6'' 8' ' 8' ' 6' ' 8'' 8 ' ' 8'' 8'' 8' ' 8'' 6'' 8' ' 6'' 8'' 8' ' 6' ' 8'' 6'' 8'' 6' ' 8'' 8' ' 8'' 8'' 8'' 8' ' 8' ' 8' ' 8'' 8' ' 6' ' 6'' 8'' 8'' 8'' 8'' 8'' 8'' 8' ' 6'' 8'' 8'' 8' ' 6'' 6'' 6'' 8'' 8'' 6' ' 8'' 8'' 8' ' 8'' 8'' 8'' 8'' 2' ' 6' ' 8'' 8'' 8' ' 8' ' 8''8' ' 8'' 6'' 8'' 8' ' 8'' 8' ' 6' ' 8'' 8'' 8 ' ' 8' ' 8' ' 8' ' 8'' 8'' 6' ' 8'' 8 ' ' 8' ' 8''8'' 8' ' 8'' 6 ' ' 8'' 8'' 8'' 8'' 8'' 8' ' 8'' 8'' 8'' 8'' 8'' 8'' 8' ' 8 ' ' 8 ' ' 8' ' 8' ' 8 ' ' 8 ' ' 6'' 8'' 8' ' 6'' 8'' 8' ' 8'' 8' ' 8' ' 6' ' 8'' 8 ' ' 8'' 8' ' 8'' 8'' 8'' 8' ' 8'' 8' ' 8'' 8' ' 8' ' 8'' 8'' 8'' 8'' 8'' 6'' 6' ' 8'' 6' ' 8' ' 8'' 8'' 8'' 8 ' ' 8'' 8 ' ' 6' ' 8'' 8 ' ' 8'' 8'' 8'' 8'' 8'' 8'' 8'' 8'' 8'' 6'' 8'' 8'' 8'' 6'' 8'' 8'' 8'' 6' '8'' 8' ' 8' ' 8'' 6'' 8'' 8'' 8'' 8'' 8'' 8' ' 8'' 8' ' 8' ' 8 ' ' 8' ' 8'' 8'' 8 ' ' 6' ' 8'' 8'' 8'' 6'' 8'' 8'' 8'' 6'' 8' ' 8' ' 8' ' 8' ' 6' ' 8' ' 8'' 6'' 8'' 8'' 8'' 8'' 8'' 8' ' 6'' 8'' 6'' 8'' 8' ' 8'' 8'' 8'' 8 ' ' 6'' 8'' 8' ' 6' ' 6' ' 8'' 8'' 8'' 8'' 8'' 8'' 2'' 6' ' 8'' 8 ' ' 6'' 8'' 6' ' 8 ' ' 8'' 8' ' 6'' 8'' 8' ' 6'' 8' ' 8'' 6'' 8' ' 8'' 8'' 8' ' 8' ' 8'' 6'' 6' ' 8'' 8'' 8'' 8'' 8'' 8'' 8'' 8 ' ' 8'' 8'' 8'' 6'' 8'' 8' ' 8' ' 8' ' 8' ' 8'' 8' ' 8''8'' 6'' 8'' 8' ' 8' ' 8'' 6'' 8' ' 8'' 8'' 8'' 6' ' 8' ' 8' ' 8'' 8 ' ' 8'' 6' ' 8 ' ' 8'' 8'' 8'' 8'' 8'' 8'' 8' ' 8'' 8'' 6'' 8' ' 8'' 6'' 8' ' 8'' 6'' 8' ' 8' '8'' 8'' 8'' 8'' 6'' 8' ' 8'' 8'' 8'' 6'' 8' ' 6' ' 8'' 8' ' 8' ' 8' ' 8'' 8'' 6'' 8'' 8'' 6'' 8'' 8'' 8' ' 6'' 2'' 8'' 8'' 8'' 8'' 8' ' 8'' 8'' 8'' 8'' 8' ' 8'' 8' ' 8' ' 8'' 8'' 8' ' 6'' 8'' 8 ' ' 8'' 8'' 8' ' 8' ' 8' ' 8'' 8'' 8'' 8'' 6'' 6'' 8' ' 6'' 8'' 8' ' 8'' 8'' 8 ' ' 8'' 8'' 8'' 6' ' 8' ' 8' ' 8'' 8'' 8'' 8'' 8'' 8'' 8'' 8' ' 8 ' ' 8'' 8'' 8'' 8'' 8'' 8' ' 8' ' 8'' 8' ' 8'' 8'' 8'' 6'' 8' ' 6'' 8'' 8'' 8'' 8'' 4'' 8' ' 8'' 8'' 8'' 8'' 6'' 8'' 8'' 8 ' ' 8'' 8' ' 8'' 8'' 6' ' 8'' 8 ' ' 6'' 8' ' 8'' 8'' 8'' 8'' 8' ' 8'' 8'' 8'' 8 ' ' 8'' 8'' 6'' 8' ' 8' ' 6'' 8'' 8'' 8'' 8'' 8'' 8'' 8'' 8'' 8'' 6'' 8'' 8' ' 8'' 8'' 6' ' 8'' 8 ' ' 8'' 8'' 8'' 8' ' 8' ' 8' ' 8'' 8'' 8' ' 8'' 8'' 8'' 8 ' ' 8'' 8'' 8'' 8'' 8' ' 8' ' 6'' 8' ' 6' ' 8'' 8' ' 8'' 8 ' ' 6' ' 8'' 8' ' 8'' 8'' 8'' 8'' 8'' 8'' 8'' 8 ' ' 8'' 8'' 8'' 8'' 8' ' 6'' 8'' 8'' 8'' 8'' 8'' 6' ' 8' ' 8'' 8'' 8' ' 8'' 8'' 8'' 8' ' 8' ' 8' ' 8'' 8'' 6'' 8' ' 8' ' 8' ' 8' ' 8'' 6' ' 8' ' 8 ' ' 8'' 8'' 8''8'' 8' ' 8'' 8' ' 8' ' 8'' 8'' 8' ' 8'' 8'' 8 ' ' 8'' 8'' 6'' 8' ' 8'' 8'' 8'' 8' ' 8'' 6' ' 8'' 8'' 8' ' 6'' 6'' 8'' 8'' 8'' 8' ' 8' ' 8'' 8'' 8'' 8'' 8' ' 8'' 8' ' 8'' 8'' 6'' 8' ' 6'' 8'' 8' ' 8' ' 8'' 6 ' ' 8'' 8'' 8'' 8 ' ' 8'' 8' ' 8 ' ' 8'' 8 ' ' 8'' 8'' 8' ' 8'' 8'' 8'' 8'' 6'' 8'' 8' ' 6' ' 6' ' 8' ' 6'' 8' ' 8 ' ' 8'' 8' ' 8'' 8' ' 8'' 6 ' ' 8'' 8'' 8' ' 8 ' ' 8'' 6' ' 8'' 8'' 8' ' 6'' 6 ' ' 8'' 8 ' ' 8'' 8'' 8'' 8'' 8' ' 4' ' 8' ' 8'' 8'' 8'' 8'' 8' ' 6'' 8'' 8'' 8'' 8' ' 8'' 8'' 8'' 8' ' 8'' 8'' 8 ' ' 8' ' 8' ' 6' ' 8'' 6' ' 8'' 8'' 8'' 6' ' 8'' 8' ' 6'' 8'' 8' ' 4'' 6' ' 4'' 8' ' 6'' 8'' 6'' 8'' 8' ' 8'' 8'' 6'' 8' ' 8'' 8' ' 8' ' 8' ' 8' ' 8'' 6'' 8' ' 8'' 4'' 8' ' 8' ' 8'' 8'' 8'' 8'' 8' ' 8' ' 8'' 6'' 8' ' 8 ' ' 8'' 8' ' 8 ' ' 8 ' ' 8'' 8' ' 6'' 8' ' 8' ' 6' ' 8'' 8'' 8'' 8'' 6' ' 8' ' 8 ' ' 8'' 6'' 8'' 8'' 8'' 6' ' 8'' 8' ' 6'' 8'' 8' ' 8' ' 8'' 8'' 8'' 8'' 8'' 8'' 8'' 8' ' 8'' 8'' 6' ' 6'' 8'' 8' ' 8 ' ' 8' ' 6'' 8'' 8 ' ' 8'' 6'' 8' ' 6' ' 8'' 8'' 8'' 6'' 8 ' ' 6'' 8'' 8'' 8'' 6'' 6'' 8' ' 8'' 6''8'' 8' ' 6'' 8'' 8'' 8 ' ' 8' ' 6'' 8'' 8'' 8'' 6' ' 6' ' 8'' 8'' 8'' 6'' 8' ' 8'' 8'' 8'' 8'' 8'' 8'' 8 ' ' 8' ' 8'' 8'' 8 ' ' 8'' 8'' 8' ' 4'' 8'' 8'' 8'' 8' ' 8' ' 6' ' 8'' 8 ' ' 8'' 8'' 8'' 8' ' 8'' 6'' 8' ' 8' ' 8'' 8' ' 8' ' 8'' 8'' 8'' 8 ' ' 8'' 8'' 6'' 8'' 8'' 6' ' 8'' 8'' 8' ' 8 ' ' 8'' 8'' 8' ' 8'' 8'' 8'' 8' ' 8'' 8 ' ' 8'' 8'' 8'' 8' ' 8' ' 8'' 8' ' 8'' 8'' 8 ' ' 6'' 8' ' 8'' 8'' 8'' 8' ' 8'' 8'' 8'' 8' ' 8'' 8'' 8' ' 8'' 6'' 8' ' 8'' 8 ' ' 8'' 8'' 6'' 8'' 8'' 8'' 8'' 8'' 6'' 8' ' 8'' 8' ' 8'' 8''8'' 8'' 8' ' 8'' 8 ' ' 8' ' 8' ' 8 ' ' 8' ' 8'' 8 ' ' 8' ' 8'' 8' ' 8' ' 8 ' ' 8' ' 8'' 6'' 8' ' 8'' 8' ' 8'' 8' ' 8'' 8'' 8 ' ' 8' ' 8' ' 8'' 6'' 6'' 6'' 8'' 8'' 8' ' 6'' 6'' 8 ' ' 8'' 8'' 8'' 8'' 6'' 8' ' 8' ' 8' ' 8'' 8 ' ' 6' ' 8' ' 8' ' 6'' 8'' 8' ' 8 ' ' 8'' 6 ' ' 8'' 8'' 8'' 8'' 8'' 8'' 8' ' 6'' 8'' 8'' 8'' 8' ' 8'' 6' ' 8'' 8'' 8'' 8 ' ' 8 ' ' 8'' 8'' 8'' 8'' 8'' 8'' 6 ' ' 8'' 8'' 8' ' 8'' 8' ' 8'' 6'' 8'' 8 ' ' 8' ' 8'' 8'' 6'' 6'' 8'' 8' ' 6'' 8'' 8'' 8'' 6'' 6'' 6 ' ' 8 ' ' 8' ' 8'' 8' '8'' 6 ' ' 8 ' ' 8'' 6'' 8'' 8'' 6' ' 8 ' ' 8' ' 8'' 8'' 8' ' 8'' 8'' 6' ' 8'' 8'' 8' ' 8'' 8'' 8'' 8'' 8' ' 8'' 8'' 8'' 8'' 8' ' 8 ' ' 6'' 8'' 8'' 8 ' ' 8 ' ' 6' ' 8 ' ' 8'' 6' ' 8' ' 6' ' 8'' 8' ' 6'' 8'' 6'' 8'' 8'' 6'' 8'' 8'' 8' ' 8'' 8'' 8'' 8'' 8 ' ' 8' ' 8' ' 8'' 6' ' 8 ' ' 8'' 8'' 8' ' 6'' 8'' 8'' 8' ' 6'' 6' ' FIGURE 3-1CITY OF COPPELLWATER IMPACT FEECAPITAL IMPROVEMENTS PLAN Created by Freese and Nichols, Inc.Job No.: [CPL11254]Location: H:\W_WW_PLANNING\DELIVERABLES\WORKING\(Figure-1)-Water_System.mxdUpdated: Wednesday, July 13, 2011 LEGEND (#UT Existing Elevated Storage Tank (#UT Existing Eligible Impact FeeElevated Storage Tank UT Existing Ground Storage Tank [Ú Existing Pump Station [Ú Existing Eligible Impact FeePump Station Existing EligibleImpact Fee Water Line Proposed EligibleImpact Fee Water Line 8" and Smaller Water Line 10" and Larger Water Line Streets Lake Parcel City Limits I 0 1,000 2,000 SCALE IN FEET !( !(!(!( !( !( !( !( !(!( !( !(!(!( !( !( !( !( !(!( !( !(!( !( !( !( !( !(!( !(!(!( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !(!( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!(!( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!(!( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !(!( !(!( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !(!(!( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !(!(!( !( !( !( !( !( !(!( !( !( !( !( !( !(!(!( !( !( !( !( !( !( !( !( !( !( !(!( !( !(!(!(!( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !(!( !( !( !( !(!(!( !( !( !( !( !( !( !( !(!(!(!(!(!(!(!(!( !(!( !( !( !( !( !(!( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !(!( !( !( !( !(!( !( !( !(!( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !(!(!( !( !( !( !( !( !( !(!( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!(!(!( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !(!(!( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !(!( !( !( !( !( !(!(!(!( !( !( !( !(!(!( !(!( !( !( !( !( !( !(!(!(!(!( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !(!(!( !( !( !( !(!( !( !( !( !(!(!( !(!(!(!( !( !( !( !(!( !( !( !( !( !( !( !(!( !( !( !( !( !(!( !( !( !( !(!( !(!( !(!( !( !( !( !( !( !( !( !( !( !( !( !(!( !(!( !( !( !( !( !(!( !(!( !( !( !(!(!( !( !( !( !( !( !( !(!( !(!( !( !( !(!( !(!(!(!(!( !( !( !(!( !( !( !( !( !( !(!(!( !(!( !( !(!( !( !( !( !( !( !(!( !( !( !( !(!( !(!(!( !( !( !( !( !( !( !( !(!( !( !( !(!( !( !( !( !( !( !( !( !(!( !( !( !( !(!( !( !( !( !(!( !(!( !(!( !( !( !( !( !(!( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !(!( !( !( !( !( !( !( !(!( !( !( !( !(!(!( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !(!( !( !( !( !( !( !( !( !(!( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!(!( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !(!( !(!(!( !( !(!(!( !( !( !( !( !( !( !( !( !(!( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !(!( !( !( !(!(!(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !(!(!(!( !(!( !( !( !( !( !( !( !(!( !( !( !( !( !( !(!( !( !(!( !( !( !( !( !( !( !( !( !( !( !(!( !(!( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !(!( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !(!( !(!( !( !(!( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !(!( !( !( !(!( !( !( !( !( !( !( !(!( !(!(!( !(!( !( !(!( !( !(!(!( !( !(!(!( !( !(!(!(!( !( !( !(!(!( !( !( !(!( !( !( !( !( !( !( !( !( !( !(!(!( !( !( !(!( !( !( !( !(!(!(!(!(!( !(!( !( !(!( !( !(!(!(!( !( !( !( !(!(!( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !(!( !( !( !( !( !(!( !( !( !( !( !(!( !( !( !(!( !(!( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !(!( !( !( !( !(!( !( !( !( !(!( !(!(!( !( !(!( !( !( !(!( !( !( !( !( !( !(!( !( !(!( !( !( !( !( !(!( !( !(!(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !(!( !( !( !(!( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !(!( !( !(!( !( !( !(!( !( !( !( !(!( !(!( !( !( !( !( !( !( !( !( !( !( !(!( !( !(!(!( !(!( !( !( !( !(!( !( !(!( !( !( !( !(!( !( !( !(!(!(!( !( !( !( !( !( !( !( !( !(!( !( !(!( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !(!(!(!( !( !( !( !( !( !( !( !(!(!( !( !( !( !( !( !( !(!( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !(!(!( !( !(!( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!(!( !( !( !( !( !( !( !( !( !(!( !( !(!( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!(!(!( !(!(!( !(!(!( !( !( !( !( !( !( !( !( !(!( !(!( !( !( !( !( !( !( !(!(!( !( !( !( !( !( !( !( !( !( !( !(!( !(!( !( !( !( !( !( !( !( !(!( !( !( !(!( !( !( !( !(!(!( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !(!( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !(!(!( !( !( !( !( !( !( !(!( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !(!( !( !(!( !( !( !( !(!(!( !( !(!( !( !(!(!( !( !( !( !( !(!( !(!(!( !( !( !(!( !( !( !( !( !( !( !( !(!( !(!( !( !( !( !( !( !( !( !( !( !( !(!(!( !( !( !( !(!(!( !( !( !(!( !( !( !(!( !( !( !( !( !( !( !( !( !(!(!( !( !( !( !(!(!(!(!(!(!( !( !( !( !( !(!( !(!( !( !(!(!( !( !( !( !( !(!( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !(!( !( !(!( !( !( !(!( !( !(!(!( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !(!( !( !( !(!( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !(!( !(!( !( !( !( !( !( !( !( !( !(!( !( !( !(!(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !(!( !(!(!( !( !(!(!(!(!( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !(!( !( !( !( !(!(!( !(!(!( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !(!( !(!(!( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!(!(!(!( !( !(!(!( !( !( !( !( !( !( !(!( !( !(!( !( !( !( !(!( !(!( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !(!(!( !( !( !(!( !( !( !( !(!(!(!( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !(!( !( !( !(!(!( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !(!( !(!(!( !( !( !(!( !(!(!( !( !(!(!( !(!( !(!( !(!( !(!( !( !( !(!( !( !( !(!( !( !( !( !(!( !(!(!( !( !( !( !( !(!( !( !( !(!( !( !( !(!(!( !(!(!( !( !( !( !( !( !( !( !(!(!(!( !( !( !(!( !( !(!( !(!( !(!(!(!(!(!( !( !( !( !( !( !( !( !(!( !( !( !( !(!( !(!( !( !( !(!(!( !(!(!( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!(!( !( !( !( !( !(!(!(!(!( !( !( !(!(!( !( !( !( !( !( !( !(!( !( !(!(!( !(!(!( !( !(!( !( !(!( !( !( !( !( !(!( !( !( !(!( !( !(!( !( !( !( !( !( !( !( !( !(!( !(!(!( !( !( !( !(!( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !(!(!(!( !( !( !( !( !( !( !( !(!(!( !(!( !( !( !(!(!( !( !( !( !( !( !( !(!( !( !(!( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !(!(!( !( !(!( !( !( !( !( !( !(!( !(!( !( !( !( !( !(!(!(!( !(!(!( !( !( !(!(!( !( !( !(!( !( !( !( !( !( !( !(!(!( !(!(!( !( !( !(!( !( !(!( !( !( !( !( !( !( !( !( !( !(!( !(!( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !(!( !( !(!( !( !(!(!(!(!( !(!( !( !( !( !( !( !( !( !(!(!( !( !(!(!(!(!(!( !( !( !( !(!(!(!(!(!(!(!(!(!(!( !( !( !( !( !( !( !( !(!(!( !( !(!(!( !(!( !( !(!(!( !( !( !(!( !( !( !(!( !( !( !( !( !(!( !(!(!( !( !( !(!( !(!( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !(!( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !(!(!( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !(!( !( !(!(!(!( !(!(!( !(!(!( !( !( !(!( !( !( !( !(!( !( !( !( !( !( !(!( !( !(!( !(!( !( !( !( !( !( !(!(!( !( !( !(!( !( !( !( !(!( !( !( !( !( !( !(!(!( !( !( !( !(!(!( !( !( !( !(!( !(!( !( !( !( !(!( !( !( !( !(!( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !(!( !( !( !( !(!( !( !( !( !( !( !( !( !(!( !( !( !(!( !( !( !( !(!( !( !( !(!( !(!( !( !(!( !( !( !( !( !( !(!(!( !(!(!( !( !( !( !( !( !( !(!( !( !( !(!(!(!( !( !(!(!( !( !( !( !( !( !( !( !(!( !(!( !(!( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !(!(!(!(!(!( !(!(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !(!( !( !( !( Vä Vä "C` Meter Station ,B ,C,C ,B ,D ,E ,H ,I ,F ,G ,G ,A,K ,K ,J Sandy Lake Lift StationFirm Capacity 4.2 MGD ,M Deforest Lift StationFirm Capacity 14.1 MGD ,L 24'' 18 ' ' 21''27'' 15'' 30'' 27'' 24'' 24'' 30'' 15'' 21'' 24 ' ' 2 7 ' ' 30'' 30'' 24'' 24'' 24'' 21'' 24'' 24'' 30'' 15'' 30'' 18' ' 2 7 ' ' 30'' 30'' 24'' 27 ' ' 3 0 ' ' 21'' 24'' 30'' 2 4 ' ' 15 ' ' 24' ' 30'' 21'' 30'' 24'' 15 ' ' 24'' 30'' 15'' 30'' 15'' 3 0 ' ' 15 ' ' 18'' 24'' 27'' 24 ' ' 15'' 30'' 30'' F. M . 20'' F.M. 30 ' ' F . M . 2 0 ' ' F . M . 20'' F . M . 30'' F.M . 30 ' ' F . M . 30'' F . M . 3 0'' F.M. 30' ' F . M . 3 0 ' ' F . M . 30'' F.M. 30'' F . M . 3 0 ' ' F . M. 3 0 ' ' F . M . E I 6 3 5 W I635 E Belt Line Rd Fr e e p o r t P k w y S R o y a l L n W Bethel Rd E Sandy Lake Rd S B e l t L i n e R d W Sandy Lake Rd N M a c A r t h u r B l v d E Bethel School Rd E Parkway Blvd N D e n t o n T a p R d Airline Dr SH 12 1 S D e n t o n T a p R d S M o o r e R d Dividend Dr S C o p p e l l R d W SH 1 2 1 Lo d g e R d S M a c A r t h u r B l v d Deforest Rd Creekview Dr Sa m u e l B l v d Wrangler Dr N SH 1 2 1 H w y N SH 1 2 1 S e r v i c e R N M o o r e R d Mo c k i n g b i r d L n W P a r k w a y B l v d N C o p p e l l R d E SH 1 2 1 S e r v i c e R Riverchase Dr Ruby Rd N H e a r t z R d No r t h p o i n t D r S H e a r t z R d Fritz Dr Falcon Ln Southwestern Blvd Hi l l D r Star l e a f S t Park V a l l e y D r Piny o n L n P h i l l i p s D r Plantation Dr Gateway Blvd Patri o t D r A l l e n R d L e d b e t t e r R d W SH 1 2 1 S e r v i c e R Pelican Ln Malla r d D r S C o u n t y L i n e R d Woo d h u r s t D r Wate r v i e w D r Shadowcrest Ln Brooks Ln Kaye St Burns St Canyon Dr Meado w c r e e k R d S SH 1 2 1 S e r v i c e R G r a h a m D r S p y g l a s s D r Oa k T r Gi f f o r d D r Greenway Dr Briarglen Dr Village Pkwy Bar c l a y A v Blue J a y L n Mapleleaf Ln Cozby Av V i l l a w o o d L n Minyard Dr Lake Vista Dr W i n d i n g H o l l o w L n Me a d o w R u n Martel L n La k e s h o r e D r Br i c k n e l l L n Woodmoor Dr Alex Dr Ed g e w o o d D r Halifax Dr Pecan Hollow Dr Tupelo Dr Fore s t H i l l D r Lyndsie Dr Quail Ln Falls Rd Parkview Plc Eagle Dr Cooper Ln G r e e n r i d g e Dr Snowshill Tr Wh i s p e r i n g H i l l s D r C arter Dr Asp e n w a y D r S SH 1 2 1 Co w b o y D r E SH 1 2 1 F a l l k i r k D r H a w k L n K il b r i d g e L n S SH 1 2 1 H w y Tim b e r R i d g e L n Oa k b e n d D r Beechwood Ln Hood Dr Cr e s t s i d e D r Sugarberry Dr He a t h e r G l e n D r Sa n d y K n o l l D r SH 121 - E x i t Con d o r D r D o g w o o d Tr Me a d o w g l e n C i r M a d i s o n S t SH 121 Ra m p Lee Dr Mead owview L n Sa n d e r s L p Redcedar Way Dr Christi Ln Willow Spri n g s D r Cribbs Dr W i l l e t D r Grace Ln P a r k e r D r Oriole Ln Swan Dr C o t t o n w o o d D r St r a t f o r d L n A c e L n Coral Dr Dillard Ln Cr e e k s i d e L n Kyle D r Waverly L n Cr e e k C r o s s i ng C h a t e a u s D r Levee Pl P a r k w o o d L n Crane Dr P l a z a B l v d W ellin gton Rd B a r r ing ton Dr Ex e c u t i v e D r To w n C e n t e r B l v d M a g n o l i a D r Si m m o n s D r Oa k c r e s t L n Travis St Ch e r r y b a r k D r Raven Ln En t e r p r i s e D r Coppersto n e T r Waln u t G r ove Ln Ro l l i n g H i l l s R d Robin Ln Leslie Ln Wales Ct L e x i n g t o n A v Trad e C e n t e r D r Br a n c h w o o d T r Ashley Dr Vanbebber Dr Di c k e n s D r L e a v a l l e y L n F a i r w a y D r Ha r w e l l S t Lake Park D r R o cky Bran c h L n L a g u n a L n Meadowood Ln Forest Ridge Dr Wr a n g l e r C i r B e a c o n H i l l D r Beal Ln Lo n d o n W a y Co u n t r y L n A r b o r Brook Ln Ashfo r d D r C a m b r i a D r E Nat c h e s T r a c e Woodl a k e D r B r a d f ord Dr Cas t l e C r e e k D r Ha r r i s S t De a n n D r Duncan Dr Cotton Rd E I635 - Exit 33 Service R Sh a d y d a l e L n Avalon Ln B e r k s h i r e L n Ha m m o n d S t Graywood Ln In g l e n o o k C t Sp r i n g o a k L n Johnson Dr H a r r i s R d Glade Point Dr W B e t h e l S c h o o l R d Sh o r e w ood D r Sparrow Ln P o i nt W e s t B l v d B itternut Dr Brock St Swallow Dr Havencrest Ln S H o l l y S t Wynnpage Dr Ta n b a r k C i r Highland Dr T r i n i t y C t I635 - O n Ramp 34 Houston St Kingsmill Ct Layton Dr Cardinal Ln An d e r s o n A v Fi n c h L n Steamboat Dr Mi l l T r Mullran y D r Te a l w o o d D r Halifax Ln Tr a i l w o o d L n R e d w i n g D r Pebble Creek Dr Gr e e n t r e e D r Lai r d s D r Thompson Dr L o n g m e a d o w D r River Rd N ewport Dr A n d o v e r L n Al l e n c r e s t L n Bu l l o c k D r Park M e a d o w W a y Dalm a l l e y L n Na s h D r Charleston Dr Rockcre s t D r W Natches Tra c e N SH 1 2 1 Lo c h L n Wo o d c r e s t L n Hu n t e r s R i d g e R d Glendale Dr B e v e r l y D r Parr St G a t e v i e w B l v d L a n s d o w n e C r Clear Creek Ln Oak Grove Ln Te n n y s o n P l c C a m b r i d g e M a n o r L n Hi d d e n V a l l e y D r Bl a c k O a k C i r No r t h L a k e D r Gl e n w o o d D r Westminster Way Fitness Ct Rai n t r e e C i r W Town Ce nt e r D r N SH 1 2 1 R d M e a d o w l a r k Ln P e p p e r w o o d S t Harrison Dr We s t l a k e D r S a d d l e T ree T r H i g h l a n d M e a d o w D r Pa r k R d Pheasant Ln Kingsridge Dr Fountain DrPost Oak Dr Wi l l i n g h a m D r Alendale Dr W I63 5 - E x i t 3 5 S e r v i c e R Ho w e l l D r Ni x o n S t Chestnut Ln Fl a g s t o n e L n Spani s h M o s s D r W e s t w i n d D r Sandy Oak Ln W I635 - O n R a m p 3 3 S e r v i c e R O l y m pia Ln Beau Dr O l d Y o r k R d Gi b s o n C t Hearthwood Dr Loxley Dr SH 121 - R a m p Kirkland Dr Pa r i s h P l c Coats St Hawken Dr P enuel D r Stonecrest Dr Archer Dr Sa n d P o i n t C t C ha lfo nt P l c Colonial Dr So r a L n N H o l l y S t Ma n c h e s t e r L n La k e w o o d C t T u r n b e r r y L n De f o r e s t C t C r e s t w o o d D r Me s q u i t e w o o d S t W B raewood Dr Pine hurst Dr I 6 3 5 - E x i t 34 Cooper E Peninsula Dr Fa i r v i e w C t D a k o t a Ln B r i t t a n y D r S l e e p y H o l l o w L n E I635 - E x i t 3 5 S e r v i c e R Woodw a y Grapevine Creek Dr Ha m p t o n C t Juniper DrField c r e s t L p Wrenwood Dr P r e s t w i c k C t Mo b l e y W a y N a t c h e s T r a c e Greenwich Ln Oakb r o o k D r Stringfellow Dr S H 1 2 1 - t u r n a r o u n d Breann a W a y Teal Cove Autumnwood Ln Ge o r g i a n D r E x c h a n g e C i r Highla n d W a y Pi n t a i l C t Briarcove Ln H i d d e n H o l l o w C t Grace Dr Blue J a y D r Do b e c k a D r Burning Tree Ln Dove Cir E I635 - On R a m p 3 5 S e r v i c e R B e n t T r e e C r t K i m b e l K o u r t A r m s t r o n g B l v d C l e a r H a v e n R d S t J a m e s P l K a i l e y W a y Cedar Crest Dr H u m m i n g b i r d D r Le isure Ln Tanglewood Ln Br i c k n e l l D r St a t e C h a m p i o n P k w y C a s t l e b u r y C t So u t h e r n B e l l e D r Br y a n L n Ridgewood Dr C a ne moun t L n Hackberry Rd M a t h e s o n C t Indi a n R o c k D r C h i n a b erry Way D r i f t w o o d D r Warren Crossing Brighton Ln Cherrywood TrAustin Ct Warwick Ln Su m m e r P l a c e D r Biltmore Ct Willow Ln Am b e r w o o d D r Encl a v e s C r t W Penins u l a D r W o o d h i l l S t Gifford C t Ma r t e l C r t Tara Ct Be a v e r R u n D r H e a r t h st one L n Alde r C t S heffield Ct Roundrock Cir Spanish Moss Ct We s t m i n s t e r C t H a m p t o n D r Rockcrest Ct Wh ite S p r u c e D r S u n r i s e D r C r o o k e d T r e e C t Tana g e r D r Hazelwood Cove Ha r t f o r d C i r Re e d e r D r Wo o d l a n d C o v e Mi t c h e l l S t E l m F o r k D r W e s t w o o d C t Willow Springs Ct No r t h w e s t e r n D r A p p l e c r o s s C t Carriage Ct Se a H a w k C t Clare m o n t C t Eastgate Dr Da V i n c i C t Maywoo d C i r Gl e n c r e s t C i r H o o d C t De l t a C t Maso n C t Elmhill Ct Cuttingham Ct Hardwick Ct P a r k V a l l e y C t Greenwood Ct Hickory Ridge Dr A r b o r M a n o r s D r Fountain Head Ln Crane Cir Elmvale Ct We s t b u r y C t Leisure Ct Gr a y w o o d C t SH 1 2 1 E SH 12 1 S H 1 2 1 - turnaround S H 1 2 1 R a m p SH 121 N SH 1 2 1 R d I6 3 5 - E x i t 3 4 SH 121 S SH 1 2 1 E SH 1 2 1 S e r v i c e R W SH 1 2 1 S e r v i c e R N SH 121 Service R W SH 1 2 1 Fre e p o r t P k w y W r a n g l e r C i r Aspen w a y D r N SH 1 2 1 S e r v i c e R S C o p p e l l R d I635 - On Ra m p 34 SH 1 2 1 - E x i t E Sandy Lake Rd D u n c a n D r Meadowglen Ci r N SH 1 2 1 H w y E SH 121 Service R Co t t o n R d 1 6 ' ' F . M . 0' ' F . M . 6 ' ' F . M . 2 ' ' F . M . 0' ' F . M . 33'' 1 8 ' ' 10 ' ' 12'' 15'' 24 ' ' 48'' 27 ' ' 21 ' ' 10'' 12'' 12'' 10 ' ' 15'' 1 0 ' ' 10 ' ' 10'' 10'' 15 ' ' 10'' 10'' 1 0 ' ' 10 ' ' 1 0 ' ' 10'' 15'' 12 ' ' 10 ' ' 12'' 10 ' ' 1 2 ' ' 1 0 ' ' 10'' 10 ' ' 10 ' ' 10 ' ' 33'' 1 0 ' ' 10'' 10'' 10 ' ' 12'' 1 0 ' ' 10'' 10 ' ' 10 ' ' 15'' 10'' 10'' 12'' 33'' 12'' 12'' 12'' 15 ' ' 15'' 12'' 18 ' ' 12'' 12'' 10 ' ' 10'' 10 ' ' 10'' 24 ' ' 18'' 12'' 15 ' ' 10'' 15 ' ' 10 ' ' 48'' 10 ' ' 15' ' 10 ' ' 1 0 ' ' 15'' 15'' 12 ' ' 18'' 1 5 ' ' 10'' 12'' 10'' 10 ' ' 15'' 12 ' ' 10'' 33'' 12'' 12'' 1 0 ' ' 10'' 10'' 10'' 12'' 10'' 10'' 10 ' ' 1 0 ' ' 10'' 12'' 12 ' ' 1 5 ' ' 10'' 10'' 12''12'' 1 0 ' ' 10'' 12'' 10 ' ' 12 ' ' 10'' 12'' 1 5 ' ' 10'' 12'' 10'' 10'' 10'' 12 ' ' 12'' 10'' 10 ' ' 12 ' ' 10'' 1 0 ' ' 1 0 ' ' 12'' 10'' 12'' 18'' 12 ' ' 1 5 ' ' 12'' 15'' 12'' 10'' 18'' 10'' 1 2 ' ' 10 ' ' 10'' 10'' 10 ' ' 12'' 10'' 10'' 10'' 10'' 10'' 1 0 ' ' 15'' 10 ' ' 10'' 10'' 10'' 12'' 12'' 10'' 10'' 1 0 ' ' 12 ' ' 10'' 12 ' ' 15'' 10''12'' 15'' 10'' 10'' 1 0 ' ' 10 ' ' 1 2 ' ' 10'' 12'' 10'' 10'' 12'' 10 ' ' 12 ' ' 15 ' ' 1 2 ' ' 10'' 10'' 10'' 12'' 1 0 ' ' 12'' 1 0 ' ' 10'' 15'' 12'' 12'' 10 ' ' 12 ' ' 12'' 10'' 15'' 1 2 ' ' 10' ' 10 ' ' 10 ' ' 12 ' ' 10'' 10'' 12'' 10'' 12'' 1 2 ' ' 18'' 10'' 10'' 15'' 12'' 10' ' 10 ' ' 12'' 10'' 10'' 10'' 10'' 1 2 ' ' 12'' 12'' 12'' 12 ' ' 10'' 33'' 15'' 12 ' ' 10'' 10'' 10 ' ' 12 ' ' 10'' 1 0 ' ' 10 ' ' 10'' 12'' 1 0 ' ' 12'' 10'' 12'' 10'' 10 ' ' 12'' 12'' 1 0 ' ' 10 ' ' 10'' 15'' 12 ' ' 10 ' ' 10'' 10'' 1 0 ' ' 10'' 10'' 12'' 12'' 1 0 ' ' 12'' 24 ' ' 10 ' ' 10'' 15'' 10 ' ' 12 ' ' 12 ' ' 15'' 10'' 10'' 15'' 15 ' ' 12'' 12 ' ' 1 0 ' ' 10'' 15'' 10 ' ' 10'' 12 ' ' 18'' 10' ' 10'' 15'' 1 5 ' ' 12'' 1 0 ' ' 10'' 1 0 ' ' 10'' 10'' 12'' 10'' 10'' 15'' 10' ' 12 ' ' 10'' 12'' 8'' 6'' 0' ' 4'' 8' ' 6'' 4'' 8'' 8'' 6' ' 8'' 8'' 8'' 8'' 0'' 8'' 4' ' 8'' 8' ' 8'' 6' ' 8' ' 8' ' 8 ' ' 8'' 8'' 8'' 8' ' 8'' 6'' 8' ' 8'' 8'' 6' ' 8'' 6' ' 8'' 6'' 4'' 8 ' ' 8' ' 8'' 8'' 8' ' 8 ' ' 6'' 8'' 8'' 8'' 8 ' ' 8'' 6'' 8'' 8'' 6' ' 8'' 8'' 8'' 8'' 8'' 8'' 6' ' 8'' 8 ' ' 8' ' 8'' 8'' 8'' 8'' 8'' 8'' 8'' 8' ' 6' ' 8'' 6'' 8'' 8'' 8'' 6'' 8'' 8'' 8'' 6'' 8'' 8'' 8' ' 8' ' 6'' 6' ' 8''8'' 8'' 8' ' 8'' 6'' 6'' 4' ' 8' ' 8'' 6'' 6'' 8' ' 8'' 6'' 8'' 6' ' 8'' 8'' 8'' 8' ' 6' ' 8'' 8' ' 8 ' ' 4'' 8'' 8'' 8'' 8' ' 8' ' 8'' 6' ' 4'' 4'' 8' ' 8 ' ' 8' ' 6'' 8' ' 6' ' 6'' 4'' 6'' 8'' 6'' 8'' 8'' 8'' 8'' 8' ' 6 ' ' 8' ' 8' ' 6''8'' 8'' 6' ' 8'' 6'' 8'' 8'' 8' ' 8'' 8'' 8 ' ' 8 ' ' 8 ' ' 8'' 8'' 6'' 8' ' 8' '8'' 8'' 8'' 8'' 8'' 6' ' 8'' 8' ' 8'' 8' ' 8' ' 8'' 8'' 6'' 6'' 8' ' 8'' 8' ' 8'' 6' ' 8'' 8'' 6' ' 6'' 6'' 8 ' ' 8'' 8 ' ' 8 ' ' 6 ' ' 8'' 4' ' 8''8'' 8'' 6'' 6'' 8'' 8'' 6'' 8'' 8'' 8'' 4'' 6'' 8'' 8'' 8'' 8'' 8'' 8'' 8'' 8' ' 8'' 8'' 8'' 8'' 8' ' 6'' 8' ' 8 ' ' 4' ' 8' ' 8'' 8'' 6'' 8' ' 8' ' 8' ' 8'' 8'' 8 ' ' 8'' 6'' 8'' 8'' 8'' 8 ' ' 8'' 8'' 8'' 4'' 8'' 4'' 8' ' 8'' 8''8'' 8' ' 8'' 6'' 8'' 6'' 8'' 8' ' 8'' 6' ' 8'' 8 ' ' 8'' 8'' 8'' 4' ' 8' ' 8' ' 8' ' 6'' 8'' 8'' 8'' 8'' 6'' 8'' 8'' 8'' 8' ' 6' ' 8'' 6'' 6' ' 8'' 8'' 8'' 8'' 6'' 8 ' ' 8' ' 8' ' 8 ' ' 8'' 8'' 8 ' ' 8' ' 8'' 8'' 8'' 8'' 6' ' 8'' 8'' 6'' 8' ' 8' ' 8' ' 8' ' 8'' 8' ' 4'' 8'' 6'' 6 ' ' 8' ' 6'' 8'' 8' ' 6'' 8'' 8'' 8'' 8'' 6'' 8'' 8'' 8' ' 8'' 6' ' 8 ' ' 8'' 8 ' ' 8' ' 8'' 6'' 8'' 8 ' ' 6'' 8'' 8'' 6'' 8 ' ' 6' ' 6'' 8'' 6'' 8'' 8' ' 6'' 8'' 8'' 8' ' 6' ' 4'' 8 ' ' 6' ' 6'' 8' ' 6'' 8'' 8'' 8 ' ' 8'' 6' ' 8' ' 8' ' 8' ' 8'' 6' ' 8'' 8'' 8' ' 8''8' ' 8'' 6'' 8'' 6'' 8'' 6' ' 8' ' 6' ' 8'' 8'' 6'' 8' ' 8'' 4'' 8'' 8'' 8'' 8' ' 6' ' 8 ' ' 4'' 8'' 6'' 8'' 8'' 6'' 8' ' 8' ' 8'' 8' ' 8' ' 8'' 8'' 4'' 6'' 8' ' 6'' 8' ' 8'' 8' ' 8' ' 8' ' 8'' 6'' 8' ' 6' ' 6'' 8' ' 8'' 6'' 8'' 8'' 8' ' 8'' 8' ' 8'' 8'' 8'' 6'' 8'' 8'' 6'' 6' ' 8' ' 8' ' 8'' 8'' 8' ' 8'' 8'' 6'' 8 ' ' 8 ' ' 8 ' ' 8'' 6' ' 8 ' ' 8'' 8'' 8' ' 8'' 8' ' 8'' 8'' 8'' 4'' 8'' 4' ' 8' ' 8' ' 8' ' 8'' 6'' 8' ' 8' ' 8 ' ' 8'' 8'' 8'' 8 ' ' 8' ' 8'' 8' ' 6'' 8'' 6'' 6 ' ' 8'' 8'' 8'' 8'' 8'' 8' ' 8' ' 8'' 8'' 8 ' ' 6' ' 8' ' 6'' 8' ' 8' ' 8'' 8'' 8'' 8'' 8'' 8 ' ' 8'' 6'' 8 ' ' 6' ' 8' ' 8'' 8'' 6' ' 8'' 8'' 8'' 8'' 8' ' 8'' 6'' 8' ' 6'' 8'' 8 ' ' 6' ' 8' ' 8'' 8'' 8'' 8'' 8' ' 8'' 8'' 8' ' 6'' 8'' 8'' 8'' 8'' 8'' 6' ' 8 ' ' 8' ' 6' ' 6' ' 8' ' 6'' 6' ' 8 ' ' 6'' 8'' 8' ' 8'' 8'' 8 ' ' 8'' 6'' 8' ' 8'' 8' ' 6' ' 8' ' 8'' 6' ' 6' '6'' 6' ' 8'' 6' ' 8'' 8 ' ' 8'' 8'' 8'' 8' ' 8'' 8'' 8 ' ' 8' ' 8 ' ' 8'' 4'' 8'' 8'' 8'' 8' ' 8' ' 8' ' 8 ' ' 8'' 6' ' 8'' 8''6'' 8' ' 8'' 6'' 8' ' 8'' 8'' 8' ' 8' ' 8'' 8'' 8'' 8'' 4'' 8' ' 6' ' 8'' 8' ' 8'' 6'' 8'' 6'' 4'' 8'' 8' '6'' 8' ' 8'' 6'' 6'' 8' ' 8'' 8''8' ' 8'' 8'' 6'' 8'' 8'' 6' ' 8'' 8'' 8'' 8'' 8'' 8' ' 8'' 8'' 8' ' 6'' 8 ' ' 6'' 8'' 6'' 8'' 8' ' 8'' 8'' 8' ' 8'' 8'' 6'' 8'' 8' ' 8'' 8'' 8'' 8' ' 8' ' 8' ' 8'' 6'' 8'' 8'' 8'' 8' ' 8'' 6'' 8 ' ' 8'' 8' ' 6'' 8'' 6'' 8'' 8' ' 8'' 6'' 8'' 8' ' 8'' 6'' 8'' 8'' 8'' 6' ' 8' ' 6 ' ' 8' ' 8'' 8'' 8'' 6'' 8 ' ' 8'' 8'' 8'' 6'' 8'' 8' ' 4' ' 8' ' 8'' 8'' 8' ' 6'' 8'' 8' ' 8'' 8'' 8'' 8''8'' 8'' 8'' 8' ' 8'' 8'' 8'' 8'' 6'' 6'' 8 ' ' 6'' 8'' 6'' 8'' 6'' 6'' 8'' 8'' 8'' 8' ' 8'' 4'' 8'' 6'' 8'' 8'' 8 ' ' 8' ' 8'' 8'' 8'' 8'' 8' ' 6'' 6'' 8'' 8'' 8'' 6'' 8' ' 8'' 8 ' ' 8'' 6'' 8' ' 6'' 8'' 8'' 6'' 8'' 8' ' 8' ' 8' ' 8'' 8''8' ' 6' ' 4'' 4' ' 6' ' 8'' 8'' 8'' 8 ' ' 8'' 8'' 8' ' 8 ' ' 8'' 8' ' 8'' 4' ' 8' ' 8' ' 8' ' 4'' 8' ' 4 ' ' 4 ' ' 8' ' 6'' 8'' 8' ' 8'' 6' ' 8 ' ' 8'' 8'' 4'' 6'' 6'' 6'' 8'' 8 ' ' 6' ' 8' ' 8' ' 8'' 8'' 4'' 8'' 8'' 8'' 8'' 8'' 6'' 8'' 8'' 8'' 8' ' 8'' 8' ' 8 ' ' 8'' 4'' 8 ' ' 8'' 8'' 8'' 6' ' 8'' 8'' 8'' 6 ' ' 8'' 8'' 6'' 8 ' ' 6'' 8' ' 6'' 8' ' 8'' 6'' 6'' 8'' 8'' 8' ' 4'' 8'' 8' ' 8'' 8' ' 8'' 8'' 8' ' 8 ' ' 8'' 8'' 8'' 8''8'' 8'' 6' ' 8' ' 8'' 6'' 8'' 8'' 8' ' 8'' 8'' 8'' 6'' 8'' 8' ' 8'' 8'' 6 ' ' 8'' 8'' 8'' 8'' 8' ' 8'' 8'' 8'' 6'' 8' ' 8' ' 8'' 6'' 8'' 6'' 8'' 8'' 8'' 8'' 8 ' ' 8 ' ' 8'' 8' ' 8' ' 8'' 8'' 6'' 8 ' ' 8'' 8'' 8 ' ' 8' ' 8 ' ' 8'' 8'' 8'' 8' ' 8'' 6 ' ' 8' ' 8'' 8'' 8'' 8' ' 8' ' 8' ' 8'' 8' ' 6'' 6'' 8'' 8 ' ' 6'' 8'' 8' ' 8' ' 8' ' 8'' 8'' 8'' 8' ' 8' ' 4'' 8'' 8'' 6'' 8'' 8' ' 8'' 6' ' 8'' 8' ' 8 ' ' 8'' 8'' 8'' 6'' 8'' 8'' 6'' 8' ' 6' ' 8'' 6 ' ' 8'' 8'' 8 ' ' 6'' 8'' 8'' 8'' 8'' 8' ' 8 ' ' 8'' 8' ' 8' ' 8' ' 8'' 8'' 8'' 8'' 8'' 6' ' 6'' 8' ' 8'' 8 ' ' 6'' 6'' 8' ' 6' ' 8' ' 8'' 8'' 4'' 6'' 8'' 8'' 6'' 6'' 8'' 6'' 8' ' 6'' 8' ' 6'' 8'' 8' ' 8'' 8 ' ' 8'' 8'' 8'' 8 ' ' 8'' 6'' 8'' 8'' 8' ' 8'' 8'' 8' ' 6'' 8'' 8' ' 8' ' 6' ' 8'' 8'' 8'' 8'' 8' ' 8' ' 8' ' 6'' 8'' 6' ' 8' ' 8'' 8'' 8' ' 8'' 8' ' 8'' 8' ' 8'' 8'' 8' ' 8' ' 0'' 8'' 8 ' ' 6'' 8'' 8'' 8'' 8' ' 6'' 8' ' 8'' 8'' 8' ' 8' ' 8' ' 8'' 8 ' ' 8' ' 8' ' 8'' 8'' 8' ' 8'' 8'' 8' ' 8'' 6' ' 6'' 6'' 8'' 6'' 6'' 8'' 8'' 8'' 8'' 8' ' 6'' 8 ' ' 6'' 6'' 8' ' 8 ' ' 8'' 8'' 8' ' 8'' 8' ' 6'' 6'' 8 ' ' 6'' 8' ' 8' '6'' 6'' 8'' 8'' 8' ' 8' ' 6'' 6'' 8'' 8'' 8' ' 8'' 8'' 8'' 8'' 8 ' ' 8 ' ' 0'' 8' ' 6'' 6'' 8'' 8'' 8'' 8'' 8'' 8' ' 8' ' 8'' 8' ' 8'' 8'' 6'' 8'' 6'' 8'' 8'' 8'' 8 ' ' 8'' 8' ' 8'' 8' ' 8' ' 8'' 8'' 8' ' 8'' 8'' 6'' 8'' 8'' 8'' 8'' 8'' 8'' 6 ' ' 6' ' 6'' 8'' 6'' 8' ' 6''6' ' 6 ' ' 8'' 4'' 8' ' 8' ' 8'' 8'' 8 ' ' 6' ' 8'' 8'' 8' ' 8' ' 8'' 8' ' 8' ' 8 ' ' 8'' 8' ' 6' ' 6' ' 8' ' 6''8'' 8'' 8'' 8'' 8'' 8' ' 6'' 8'' 8 ' ' 8 ' ' 8'' 8' ' 8' ' 8'' 8'' 8 ' ' 4'' 8'' 6' ' 8' ' 8'' 8 ' ' 8' ' 8'' 8'' 6'' 8'' 8'' 8' ' 8'' 8'' 8' ' 6'' 8 ' ' 6' ' 8 ' ' 8'' 4' ' 8'' 8' ' 8 ' ' 8'' 8 ' ' 8' ' 8' ' 8''8'' 8'' 8'' 6'' 8' ' 8'' 8'' 8'' 6'' 8'' 8' ' 8'' 8' ' 0'' 8'' 8 ' ' 8'' 8' ' 8'' 8'' 8'' 8'' 8'' 6'' 8' ' 8'' 6'' 6'' 8'' 8'' 8'' 8' ' 8' ' 8' ' 8' ' 8' ' 8'' 6' ' 8'' 8' ' 6'' 8''4' ' 8'' 8'' 8'' 8'' 8' ' 8'' 8' ' 8'' 8'' 8'' 8'' 6'' 8'' 8'' 8' ' 8'' 8'' 8'' 8'' 8'' 8'' 8 ' ' 6' ' 6' ' 6' ' 8'' 8 ' ' 8 ' ' 8'' 8'' 8'' 4'' 8' ' 8'' 6'' 8' ' 6'' 8'' 6'' 8'' 8'' 8'' 8' ' 6'' 8'' 8'' 8'' 8'' 8'' 6 ' ' 8'' 8'' 8'' 8'' 6'' 8'' 8'' 8' ' 8'' 0' ' 8'' 6'' 8'' 8'' 8 ' ' 8'' 8 ' ' 8'' 8'' 6'' 8'' 8 ' ' 8'' 8'' 8'' 8'' 6'' 8 ' ' 8'' 8' ' 8'' 8' ' 8'' 8' ' 8' ' 8'' 8' ' 8'' 8'' 8'' 8 ' ' 8'' 8' ' 8'' 8' ' 8'' 8'' 8' ' 8'' 8' ' 6'' 8'' 8' ' 6'' 8'' 8' ' 8 ' ' 8''8'' 8'' 8'' 8'' 8' ' 8'' 6'' 8' ' 6'' 8' ' 8' ' 8'' 8'' 6'' 6'' 8'' 8' ' 8'' 6' ' 8 ' ' 8'' 8'' 8' ' 8'' 8'' 8 ' ' 8'' 6' ' 8'' 6'' 8'' 8' ' 8'' 8'' 8'' 8'' 8'' 8'' 8' ' 8' ' 6'' 8'' 8'' 8' ' 8'' 8' ' 8'' 8'' 8'' 8' ' 8'' 8'' 6'' 8' ' 4' ' 8' ' 8'' 6'' 8' ' 8' ' 8'' 6 ' ' 6'' 8' ' 8'' 6'' 6' ' 4' ' 6'' 8'' 8'' 8'' 8' ' 8 ' ' 8'' 6'' 6'' 8'' 6'' 8' ' 4 ' ' 6' ' 8'' 8 ' ' 8 ' ' 6'' 8'' 8' ' 8' ' 8'' 8' ' 8' ' 8'' 8' ' 8' ' 8'' 8' ' 8'' 8'' 8'' 8' ' 8'' 8' ' 8' ' 8'' 6'' 8'' 6' ' 8' ' 8''8' ' 8' ' 8'' 8'' 8' ' 8' ' 8'' 8'' 8' ' 6'' 8'' 8' ' 8'' 8' ' 8'' 6'' 8' ' 8'' 8 ' ' 6'' 6'' 6'' 8' ' 8'' 8'' 0'' 8' ' 6' ' 8' ' 6'' 8'' 8' ' 8'' 8' ' 6' ' 8' ' 6'' 8' ' 8' ' 8' ' 6'' 6' ' 6' ' 8'' 8' ' 8'' 8'' 6' ' 8'' 8' ' 8'' 8'' 8'' 8' ' 8' ' 8' ' 8 ' ' 8'' 4'' 8 ' ' 8'' 8'' 8' ' 8'' 8'' 6'' 8'' 8'' 8' ' 8' ' 6'' 8'' 8'' 6'' 8'' 8' ' 8' ' 6'' 8' ' 6'' 6 ' ' 8'' 8'' 8'' 6'' FIGURE 3-2CITY OF COPPELLWASTEWATER IMPACT FEECAPITAL IMPROVEMENTS PLAN Created by Freese and Nichols, Inc.Job No.: [CPL11254]Location: H:\W_WW_PLANNING\DELIVERABLES\WORKING\(Figure-1)_Existing_Wastewater_System.mxdUpdated: Wednesday, July 13, 2011 LEGEND Existing Eligible Impact FeeWastewater Lines Existing Eligible Impact FeeForce Mains 8" and Smaller Wastewater Line 10" and Larger Wastewater Line Force Main Vä Existing Eliible Lift Station "C`Meter Station !(Manhole Streets Parcel City Limits Lake SEWER BASINS Basin 'A' Basin 'B' Basin 'C' Basin 'E' Basin 'F' I 0 1,000 2,000 SCALE IN FEET DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  4‐1  4.0 WATER AND WASTEWATER IMPACT FEE ANALYSIS The impact fee analysis involves determining the utilization of existing and proposed projects  required as defined by the capital improvement plan to serve new development over the next  10‐year time period.  For existing or proposed projects, the impact fee is calculated as a  percentage of the project cost, based upon the percentage of the project’s capacity required to  serve development projected to occur between 2011 and 2021.  Capacity serving existing  development and development projected for more than 10 years in the future cannot be  charged to impact fees.  4.1 Service Units The maximum impact fee may not exceed the amount determined by dividing the cost of  capital improvements required by the total number of service units attributed to new  development during the impact fee eligibility period.  A water service unit is defined as the  service equivalent to a water connection for a single‐family residence.  The City of Coppell does  not directly meter wastewater flows and bills for wastewater services based on the customer’s  water consumption.  Therefore, a wastewater service unit is defined as the wastewater service  provided to a customer with a water connection for a single‐family residence.  The service associated with public, commercial, and industrial connections is converted into  service units based upon the capacity of the meter used to provide service.  The number of  service units required to represent each meter size is based on the safe maximum operating  capacity of the appropriate meter type.  The City uses Class I turbine meters.  American Water  Works Association (AWWA) standards C701 (Cold Water Meters – Turbine Type) was used to  determine the safe maximum operating capacity. The service unit equivalent for each meter  size used by the City is listed in Table 4‐1.  DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  4‐2  Table 4‐1 Service Unit Equivalencies  Meter Size Safe Maximum Operating Capacity (gpm)(1) Service Unit Equivalent 5/8” x 3/4” 30 1.0  1” 50 1.7  1‐1/2” 100 3.3  2” 160 5.3  3” 350 11.7  4” 630 21.0  6” 1,400 46.7  8” 2,400 80.0  (1) Safe maximum operating capacity is based on AWWA standards C701   Typically, in Coppell, single‐family residences are served with 5/8‐inch water meters.  Larger  meters represent public, commercial, and industrial water use.  The City provided data that  included the meter size of each active water meter as of June 2011.  Table 4‐2 shows the water  and wastewater service units for 2011 and the projected service units for 2021.    Table 4‐2 Water and Wastewater Service Units  Meter Size 2011 Connections 2011 Service Units 2021 Connections 2021 Service Units Growth in Service Units 5/8” x 3/4” 11,219 11,219 11,702 11,702 483  1” 202 337 211 352 15  1‐1/2” 103 343 107 357 14  2” 487 2,597 508 2,709 112  3” 18 210 19 222 12  4” 24 504 25 525 21  6” 3 140 3 140 0  8” 204 16,320 213 17,040 720  Total 12,260 31,670 12,788 33,047 1,377    DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  4‐3  4.2 Maximum Impact Fee Calculations Chapter 395 of the Texas Local Government Code states that the maximum impact fee may not  exceed the amount determined by dividing the cost of capital improvements required by the  total number of service units attributed to new development during the impact fee eligibility  period less the credit to account for water and wastewater revenues used to finance capital  improvement plans.  The total projected costs include the projected capital improvement costs to serve 10‐year  development, the projected finance cost for the capital improvements, and the consultant cost  for preparing and updating the Capital Improvements Plan.  A 4.0% interest rate was used to  calculate financing costs.  Comparison graphs showing impact fees in other cities throughout  the Metroplex are presented on Figure 4‐1 and Figure 4‐2.   Water Impact Fee:  Total Capital Improvement Costs      $3,869,298  Financing Costs           $1,287,050  Total Eligible Costs           $5,156,348  Growth in Service Units                  1,377  Maximum Water Impact Fee =  Total Eligible Costs/Growth in Service Units    =  $5,156,348/1,377    =  $3,745 per Service Unit  Maximum Allowable Water Impact Fee =  Maximum Impact Fee – 50% Credit    =  $3,745 ‐ $1,873   =  $1,873 per Service Unit          DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  4‐4   Wastewater Impact Fee:  Total Capital Improvement Costs       $2,916,507  Financing Costs            $970,122  Total Eligible Costs         $3,886,629  Growth in Service Units                 1,377  Maximum Wastewater Impact Fee =  Total Eligible Costs/Growth in Service Units    =  $3,886,629/1,377   =  $2,823 per Service Unit  Maximum Allowable Wastewater Impact Fee =  Maximum Impact Fee – 50% Credit    =  $2,823 ‐ $1,412   =  $1,412 per Service Unit    DR A F T  Wa t e r ,  Wa s t e w a t e r  an d  Ro a d w a y  Im p a c t  Fe e  Re p o r t   Ci t y  of  Co p p e l l   4 ‐5   Fi g u r e  4 ‐1   Wa t e r  an d  Wa s t e w a t e r  Im p a c t  Fe e  pe r  Se r v i c e  Un i t  Co m p a r i s o n     DR A F T  Wa t e r ,  Wa s t e w a t e r  an d  Ro a d w a y  Im p a c t  Fe e  Re p o r t   Ci t y  of  Co p p e l l   4 ‐6   Fi g u r e  4 ‐2   Wa t e r ,  Wa s t e w a t e r ,  an d  Ro a d w a y  Im p a c t  Fe e  pe r  Si n g l e  Fa m i l y  Ho m e  Co m p a r i s o n    DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  5‐7  5.0 ROADWAY IMPACT FEE ANALYSIS 5.1 Methodology To update the roadway impact fee system, a series of work tasks were undertaken that  included the following:  • A roadway conditions inventory of major thoroughfares in Coppell was updated for lane  geometries, roadway classifications and segment lengths.  The existing roadway network  was evaluated based on updated traffic volume count information, collected in August  2011, to determine roadway capacity, current utilization, and deficiencies, if present, for  each service area.  • The vehicle‐mile of travel during the PM peak hour was retained as the appropriate service  unit for measuring capacity and system utilization for the impact fee calculation Roadway  capacity values were based on data developed by the NCTCOG for level of service “C/D”  operations.   • New vehicle‐miles of demand were calculated for each service area based on updated land  use assumptions by service area for the program planning period.  The land use  equivalency table was used as a basis for deriving projected vehicle‐miles from growth  over the ten‐year planning period.  • An analysis of previous roadway impact fee Capital Improvements Plan (CIP) was  conducted based on updated traffic volume count information to ensure excess capacity  remained in program projects for each service area.   • A CIP was prepared based on growth needs from future development (land use  assumptions), other capital improvements programming and City Staff input.  Roadway  cost data including construction, engineering and right‐of‐way for impact fee projects were  prepared and compiled by service area based on cost estimates and data provided by the  City.  For recently completed projects, actual costs were incorporated into the system  database.  DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  5‐8  • The cost of capacity supplied, cost attributable to new development and the maximum  cost per service unit was calculated for each service area.  A credit of 50% was applied to  the overall cost of the capital improvements program for the identification of the  maximum allowable cost per service unit consideration.  • The Land Use Equivalency Table (service unit generation for specific land use categories)  was updated to incorporate new trip rate and trip length data.  Trip rate data was obtained  from Trip Generation, Eighth Edition by the Institute of Transportation Engineers.  Trip  length statistics for the city were obtained from a workplace survey conducted by the  NCTCOG.  Several new land uses were incorporated within the major categories of  residential, office, commercial, industrial, and institutional.  • Example fee calculations were prepared based upon sample land uses, associated service  unit equivalencies, and the maximum allowable cost per service unit.   This section documents the procedures, findings, and conclusions of the study.  5.2 Roadway Impact Fee Service Area Chapter 395 requires that service areas be defined for impact fees to ensure that facility  improvements are located in proximity to the area that is generating the need.  Legislative  requirements stipulate that roadway service areas be limited to a six mile maximum and must  be located within the current city limits.  Roadway service areas are different from other impact  fee service areas, which can extend beyond the city limits and include its Extra Territorial  Jurisdiction (ETJ) or other defined area of service.  This is primarily because roadway systems  are "open" to both local and regional use as opposed to a defined limit of service that is  provided with water and wastewater systems.  For roadways, the result is that new  development can only be assessed an impact fee based on the cost of necessary capital  improvements within that service area.  No changes were made to the service area structure and is illustrated in Figure 2‐1.     DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  5‐9  Roadway Impact Fee Land Use Assumptions Land use assumptions serve as the basis from which travel demands are developed over the  planning period.  Chapter 395 requires that land use assumptions and CIP be updated at least  every five (5) years to ensure growth projections are commensurate with current residential  and non‐residential trends of the community.  The land use assumptions provide the basis for  determining the portion of the capital improvements plan (and associated cost) attributed to  future growth and development.  For this system update, service unit generation (future  growth) was based on the net population and employment growth as identified in the “Land  Use Assumptions for Impact Fees” report prepared by the City and discussed as part of Chapter  2.    For roadways, both population and employment data are necessary for the determination of  both residential and non‐residential traffic (vehicle‐miles) over the planning period.  Derived  demographic data, in conjunction with service unit generation from the land use equivalency  table, formed the basis for ten‐year growth estimates.  Table 5‐1 details the breakout of the  increase in Developed Acreages within the service area.    Table 5‐1 Increase in Developed Acreages for Years 2011 to 2021  Land Use Acres Commercial Commercial/Office/Retail 170 Freeway Commercial/Office/Retail 594 Light Industrial 209 Public Institutional 0 Residential Residential High Density 0 Residential Medium Density 40 Residential Low Density 438 Parks and Open Space 279 Total 1,730   DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  5‐10  5.3 Establishment of the Roadway Capital Improvement Plan Chapter 395 of the Texas Local Government Code specifies the requirements necessary to  prepare a capital improvements plan.  These requirements include:  • A description of the existing capital improvements within the service area and the cost to  upgrade, update, improve, expand or replace the improvements to meet existing needs  and usage  • An analysis of the total capacity, the level of current usage, and commitments for usage of  capacity of the existing capital improvements  • A description of all or the parts of the capital improvements and their costs necessitated by  and attributable to new development in the service area based on approved land use  assumptions  • A definitive table establishing the specific level or quantity of use, consumption,  generation, or discharge of service unit for each category of capital improvements and an  equivalency table establishing the ratio of the service unit to various types of land uses,  including residential, office, retail/commercial, light industrial, and institutional.   • The total number of projected service units necessitated by and attributable to new  development within the service area based on the approved land use assumptions  • The projected demand for capital improvements required by the new service units  projected over a reasonable period of time  • A plan for awarding a credit for the portion of the ad valorem tax generated by new service  units during the program period that is used for the payment of improvements, or a credit  equal to 50 percent of the total projected cost of implementing the capital improvements  plan  The plan must contain two distinct components: analysis of existing conditions and analysis of  projected conditions.  To analyze these components two measures of performance must be  established, they are:  level‐of‐service and service units.  DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  5‐11  5.4 Roadway Level of Service Level‐of‐Service (LOS) is a term used in traffic engineering to describe the performance of the  roadway system.  Roadway level‐of‐service is the basic design criterion used in thoroughfare  planning.  The design level‐of‐service determines the capacity for which the roadway is  intended.  Level‐of‐service is rated from “A” to “F”.  The higher level of service (A‐B) provides  better driving conditions, but typically requires higher construction cost.  Level of Service “E” is  considered to be the capacity limit of urban roadways.  Level of Service “C/D” is the design  level‐of‐service selected for the Impact Fee Analysis for the City of Coppell.  Table 5‐2 lists the  maximum service volumes for level‐of‐service “C/D” as a function of facility type.  Table 5‐2 Roadway Facility Vehicle‐Mile Capacities  Roadway Facility Roadway Type Capacity “LOS C/D Vehicles per hour per lane‐mile of Roadway Facility(1) Principal Arterial – Divided P6D 700 Divided Local Arterials C4D 625 Undivided Collector – 4 Lane C4U 440 Undivided Collector – 2 Lane C2U 350 (1) Hourly capacity for LOS “C/D” obtained from NCTCOG DFW Regional Travel Model and the Highway Capacity  Manual  5.5 Roadway Impact Fee Service Units Service units establish a relationship between roadway projects and demand placed on the  street system by development, as well as the ability to calculate and assess impact fees for  specific development proposals.  As defined, service unit means; “a standardized measure of  consumption, use, generation, or discharge attributable to an individual unit of development in  accordance with generally accepted engineering or planning standards for a particular category  of capital improvements or facility expansions."   To determine the roadway impact fee for a particular development, the service unit must  accurately identify the impact that the development will have on the major roadway system  (i.e., arterial and collector roads) serving the development.  This impact is a combination of the  number of new trips generated by the development, the particular peaking characteristics of  DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  5‐12  the land‐use(s) within the development, and the length of each new trip on the transportation  system.  The service unit must also reflect the capacity, which is provided by the roadway system, and  the demand placed on the system during the time in which peak, or design, conditions are  present on the system.  Transportation facilities are designed and constructed to accommodate  volumes expected to occur during the peak hours (design hours).  These volumes typically occur  during the peak hours as motorists travel to and from work.  The vehicle‐mile during the PM peak hour was retained as the service unit for impact fees in  Coppell.  This service unit establishes a more precise measure of capacity, utilization and  intensity of land development through the use of published trip generation data.  It also  recognizes legislative requirements with regards to trip length.    The PM peak hour is recommended as the time period for assessing impacts because the  greatest demand for roadway capacity occurs during this hour.  Roadways are sized to meet  this demand, and roadway capacity is more accurately defined on an hourly basis.  Traffic  volume data collected August 2011 at over 20 locations throughout the city confirmed the PM  peak hour as the highest period of use.  5.6 Roadway Existing Conditions Analysis An accurate service unit is required to calculate and assess impact fees for new developments.   As defined in Chapter 395, “Service unit means a standardized measure of consumption, use,  generation, or discharge attributed to an individual unit of development calculated in  accordance with generally accepted engineering or planning standards, based on historical data  and trends applicable to the political subdivision in which the individual unit of development is  located during the previous 10 years.”  In other words it is a measure of supply and demand.    The service unit must accurately reflect the supply, which is provided by the roadway system.   Transportation facilities are designed to accommodate peak hour traffic volumes because the  heaviest demand for the roadway capacity occurs during the peak hour.  These peak hours  typically occur during the morning (AM peak) and evening (PM peak) rush hours as motorist  DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  5‐13  travel to and from work.  The impact fee analysis for the City of Coppell was developed for PM  peak traffic volumes.  For the supply side the unit of measurement is the service volume that is  provided by a lane‐mile (lane‐miles) of roadway facility.  This number is also the capacity of the  roadway based on an acceptable level‐of‐service; in this case that level‐of‐service is “C/D”.  The service unit must also reflect the demand that a particular development will place on the  transportation system.  The impact the development has on the street system is directly related  to: the trips generated by development, land‐use for which the development is intended, and  the average length of each trip on the transportation system.  For the demand side this unit is a  vehicle‐trip of one‐mile in length (vehicle‐miles).  Service units create a link between supply (roadway projects) and demand (new development).   Both supply and demand can be expressed as a combination of the number of vehicles traveling  during the peak hour and the distance traveled by these vehicles in miles.  Thus, the Service  Unit for roadway impact fees is vehicle‐mile.  5.7 Existing Conditions Analysis An inventory of major roadway facilities was conducted to determine existing conditions  throughout Coppell.  This analysis determined the capacity provided by the existing roadway  system, the demand currently placed on the system, and the existence of any deficiencies on  the system.  Data for the inventory was obtained from field reconnaissance, traffic volume  counts, the City Thoroughfare Plan and City Staff, and is detailed in Appendix B.  5.7.1 Existing Traffic Volumes Existing directional PM peak hour volumes were obtained from automated traffic counts  collected by the City from their comprehensive traffic count program in November  2011.  Automated traffic counts at 20 separate locations were collected on major  roadways (as identified in the Thoroughfare Plan as arterial or collector status)  throughout the city.  In an effort to minimize the total number of counts, data was  collected at locations where traffic volumes would typify link volumes on the major  segments within the immediate area.  For segments not counted, estimates were  DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  5‐14  developed based on peaking characteristics of area roadways or data from adjoining  roadway counts.  This data was compiled for roadway segments throughout the city and  entered into the database for use in calculations.  A summary of volumes by roadway  segment is included in Appendix C as part of the existing capital improvements  database.  5.7.2 Vehicle‐Miles of Existing Capacity (Supply) The vehicle‐miles of existing capacity for each counted roadway segment were obtained  using the equation below:   Vehicle–Miles of Capacity = Capacity per peak hour per lane x Number of lanes x Length  (miles)  Example:  a 4‐lane divided roadway that is 2 miles in length and has a capacity of 625 vehicles  per hour per lane:  Vehicle–Miles of Capacity = 625 vehicles per hour x 4 lanes x 2 miles = 5,000 vehicle‐ miles per hour   This existing capacity is calculated for the service area and is not limited to only those  roadways identified in the impact fee capital improvements program.  A summary of  existing capacity for the service area is illustrated in Table 5‐3.  A complete detailed  listing by roadway segment is provided in Appendix C.   5.7.3 Vehicle‐Miles of Existing Demand The vehicle‐miles of existing demand or the current usage of the facilities for each  roadway segment was obtained using the equation below:   Vehicle–Miles of Demand = PM peak hour volume x Length of Roadway (miles)  For example:  a 3‐mile long roadway that has a PM peak hour traffic volume of 400 vehicles  per hour:   Vehicle–Miles of Demand = 400 vehicles per hour x 3 miles = 1,200 vehicle‐miles per hour   DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  5‐15  This existing demand is calculated for the service area and is not limited to only those  roadways identified in the impact fee capital improvements program.  A summary of the  existing demand for the service area is illustrated in Table 5‐3.  A complete detailed  listing by roadway segment is provided in Appendix C.  Table 5‐3 Existing Excess Capacity and Demand  Service Area Excess Capacity (Peak Hour Veh‐Miles) Demand (Peak Hour Veh‐ Miles) City 26,679 43,511   5.7.4 Vehicle‐Miles of Existing Excess Capacity or Deficiencies From the calculation of vehicle‐miles of existing capacity and demand for each roadway  segment, the excess capacity or deficiencies for each direction can be determined.  A  deficiency exists if a roadway is over capacity or has an hourly traffic volume that is  below its acceptable level‐of‐service in any direction of travel.  If this is the case then the  deficiency is deducted from the available supply.  A summary of existing excess capacity  and/or deficiencies for each service area is illustrated in Table 5‐4.  A complete detailed  listing by roadway segment is provided in Appendix C.  Roadways with deficiencies in  the City of Coppell are Parkway Boulevard, Sandy Lake Road, Bethel Road, Belt Line  Road, Freeport Parkway, Denton Tap Road, and MacArthur Boulevard.  Table 5‐4 Existing Excess Capacity and Deficiencies  Service Area Excess Capacity (Peak Hour Veh‐Miles) Deficiencies (Peak Hour Veh‐ Miles) City 26,679 1,451 5.8 Calculating Impact Fees Chapter 395 of the Texas Local Government Code requires a description of all capital  improvements and their cost attributable to new development within the service area.  To  determine the cost attributable to new development, the following information needs to be  DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  5‐16  calculated or supplied:  future land use assumptions, vehicle‐miles of new demand, a capital  improvement plan, vehicle‐miles of new capacity supplied by the capital improvements plan  and the costs for the roadway improvements. The recommended service unit for assessing  impact fees for the impact new development has on roadway facilities is a combination of the  trips generated (vehicles) by the new development during the peak hour and the average trip  length (miles) of each trip.  The following section describes the methodology used in developing  service units for new developments.  5.8.1 Trip Generation The trip generation rates are used to determine the number of vehicles added to the  roadway system as a result of new development.  The trip generation rates were  developed for the PM peak weekday period.  The trip generation rates were established  using the Institute of Transportation Engineers Trip Generation Manual 8th edition.   Development units were chosen by size (e.g.: office building, retail, industrial), by  number of units (e.g.: residential, multifamily) and by the number of students (schools).  The following development units are typically used:  • Dwelling Units (DU) – Total number of habitable dwellings within the development.  This should not be mistaken as bedrooms.  For example a single‐family residence is  one dwelling unit; a 50 unit apartment complex is 50 dwelling units.  • Gross Floor Area (GFA) – Total square feet of building floor area bounded by the  exterior boundary of outer building walls. Uncovered and outdoor patios are  excluded from GFA.  • Acres – The total number of acres included in the development.  • Students – The total number of students attending an institution.  Adjustments to the trip generation rates are necessary to reflect the differences  between driveway volumes and the total amount of traffic added to adjacent roadways.   The actual “traffic impact” of the new development is based only on the traffic added to  the adjacent roadways.  The actual traffic added to the adjacent roadways is determined  DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  5‐17  by adjusting the driveway volumes to account for pass‐by trips, diverted trips, and  internal trips.  • Pass‐by trips – are those trips attracted to a development from traffic that would  otherwise pass‐by the site on an adjacent roadway.  For example, a stop at a  convenience store on the way from the office to home is a pass‐by trip for the  convenience store.  The trip does not create an additional burden on the street  system and therefore should not be double‐counted.  The burden of this type  should be assigned to the office and/or residence.   • Diverted trips – are those trips that are already on the roadway system and are  diverted to the roadway system serving the new development.  For example, a trip  from home to work along Parkway Boulevard would be a diverted trip if the travel  path was changed to Sandy Lake Road the purposes of stopping at the dry cleaners.   On a system‐wide basis, this trip also does not add a significant additional burden  to the street system so it is not considered in assessing impact fees.   • Internal trips – are those that would typically be made in a mixed‐use development  between two uses within the development, not utilizing a thoroughfare outside the  development for that trip. For example, a trip between a shopping center and a  restaurant contained within the same site would be considered and internal trip,  and does not create any additional burden on the roadway system.  5.8.2 Trip Length Trip lengths in miles will be used in conjunction with site trip generation to establish the  vehicle‐miles of travel, the service unit to be used for assessing impact fees.  As with trip  generation, trip lengths are used in the development of travel forecasting models for  use in assessing roadway needs, as well as for assessing impact fees.  As previously  stated, trip lengths are limited to six miles.  Each trip has an origin and destination, half  of the trip length will be assigned to the origin and half of the trip length will be assigned  to the destination.  Therefore, the average trip length for a development is half the total  DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  5‐18  trip length, allowing the maximum total trip length under state law to be six miles.  The  trip length data used in this report was based on information generated in the 1984 and  1994 NCTCOG Workplace Survey and the 2001 National Household Travel Survey.   5.8.3 Projected Growth and Vehicle‐Miles of New Demand Project growth for roadway impact fees is represented by an increase in the vehicle‐ miles over a 10‐year period.  The basis used to calculate the increase in vehicle‐miles is  population and employment projections that were prepared as part of the land use  assumptions detailed in the Section 2.0.  The calculation for the increase in the vehicle‐ miles due to new development is made up of three components:  • Increase in the acreage for each land use for the 10‐year study period   • Trip generation rates for PM peak hour of adjacent street traffic (provided by the ITE  Trip Generation Manual, 8th edition)  • Average trip length (provided by NCTCOG 1984 and 1994 Workplace Survey and  2001 National Household Travel Survey)  A summary of the vehicle‐miles of new demand is illustrated in Table 5‐5.  A complete  detailed listing by land use category is provided in Appendix D.  Table 5‐5 Projected Vehicle‐Miles of New Demand  Service Area Projected Vehicle‐Miles Of New Demand City 41,679   5.8.4 Capital Improvements Plan (CIP) The capital improvements plan includes roadway improvements that are needed to  accommodate long‐term growth.  The impact fee CIP can only contain roadways which  are included on the city’s official thoroughfare plan and are classified as arterial and  collector status streets.  Freese and Nichols, along with City staff, evaluated roadway  projects for inclusion in the CIP based on: 1) future growth areas, 2) projected 10‐year  DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  5‐19  traffic demand, 3) ability to recoup roadway costs (cost share or previously constructed  roadways with excess capacity), 4) financial considerations, and 5) staff input.  Chapter  395 also allows the City to include their share of the cost for state and federal highways  to also be included in this plan.  At this time no state highways are included in the CIP.     An assessment of the existing impact fee capital improvements plan was conducted to  ensure that excess capacity remains in the impact fee roadway projects.  Using traffic  count data, a determination was that all projects within the Impact Fee CIP contain  excess capacity and can be retained in the program.  The projects included in the Impact Fee Roadway CIP are listed in Table 5‐6 and  illustrated in Figure 5‐1.    The following costs were included in the preparation of the 10‐year CIP program:  • Construction price  • Surveying and engineering fees  • Land acquisition costs  • Fees paid for the preparation of the capital improvements plan  • Projected interest charges and other finance costs  The total projected cost for the 10‐year impact fee CIP is $38,340,711 in 2011 dollars  ($51,381,000 cost with financing).  A detailed Engineer’s Opinion of Probable Construction  Cost for each roadway is provided in Appendix E.  A summary of the cost for the impact fee  CIP are provided in Table 5‐6.    DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  5‐20  Table 5‐6 Summary of Roadway Cost  RECOUPMENT PROJECTS No. ROADWAY FROM TO COST COST w/ FINANCING 1* SANDY LAKE RD CITY LIMIT (WEST)COPPELL ROAD $4,697,908 $6,296,000 3* SANDY LAKE RD DENTON TAP ROAD MACARTHUR BLVD. $11,145,337 $14,935,000 4* SANDY LAKE RD MACARTHUR BLVD.CITY LIMIT (EAST)$5,193,720 $6,960,000 9* BETHEL RD CITY LIMIT (WEST) FREEPORT PKWY. $7,280,321 $9,756,000 11* SOUTHWESTERN BLVD COPPELL ROAD DENTON TAP $1,204,349 $1,614,000 12* BELT LINE ROAD SOUTHWESTERN BLVD. MACARTHUR BLVD. $522,283 $700,000 13* MACARTHUR BLVD. BETHEL SCHOOL ROAD BELT LINE ROAD $325,394 $437,000 Total:$30,369,311 $40,698,000 EXPANSION PROJECTS No. ROADWAY FROM TO COST COST w/ FINANCING 2** SANDY LAKE ROAD COPPELL ROAD DENTON TAP RD $6,102,000 $8,177,000 6*** FREEPORT PKWY SH 121 SANDY LAKE RD $881,800 $1,182,000 7*** FREEPORT PKWY RUBY ROAD SANDY LAKE RD $987,600 $1,324,000 Total:$7,971,400 $10,683,000 TOTAL ROADWAY IMPACT FEE CAPITAL IMPROVEMENTS $38,340,711 $51,381,000 *Cost from City Contract Documents **Engineer's Probable Construction Cost Estimates provided by the City ***Freese and Nichols Conceptual Level Cost Estimates     §¨¦635 State H w y 1 2 1 Sandy Lake Rd Belt Line R d De n t o n T a p R d Co p p e l l R d Fr e e p o r t ( S t a t e R d ) Ro y a l L n Fr e e p o r t P k w y Southwestern Blvd Bethel Rd Sandy Lake Rd State H w y 1 2 1 Be l t L i n e R d Parkway Blvd MacA r t h u r B l v d Bethel School Rd Ro y a l ¬«12 ¬«3 ¬«9 ¬«8 ¬«2 ¬«4¬«7 ¬«6 ¬«13 ¬«11 ¬«1 ³0 1,200 2,400 SCALE IN FEET IMPACT FEE PROJECTS Impact Fee Roadways Recoupment Roadways Coppell City Limits FIGURE 5-1CITY OF COPPELLROADWAY IMPACT FEES Created By Freese and Nichols, Inc.Job No.: CPL11254Location: H:\TRANSPORTATION\WORKING\RoadImpactFee_5-1_2011_11.mxdUpdated: Tuesday, December 06, 2011 11:53:21 AM DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  5‐22  5.8.5 Vehicle‐Miles of New Capacity Provided The vehicle‐miles of capacity added are calculated in a similar manner as the vehicle‐ miles of existing capacity supplied.  Vehicle–Miles of New Capacity = Capacity per peak hour per lane x Number of     lanes x Length (miles)    The calculated capacity is for the new impact fee roadways.  The vehicle‐miles of new  capacity supplied for each service area is provided in Table 5‐7.  A complete detailed  listing by roadway segment is provided in Appendix F.  Table 5‐7 Projected Vehicle‐Miles of New Capacity (Supply)  Service Area Projected Vehicle‐Miles of New Capacity (Supply) City 26,517   5.8.6 Vehicle‐Miles of Existing Demand on Impact Fee CIP Roadways The vehicle‐miles of existing demand on CIP roadways are provided in Table 5‐8.  A  complete detailed listing by roadway segment is provided in Appendix F.  Table 5‐8 Vehicle‐Miles of Existing Demand on CIP Roadways  Service Area Vehicle‐Miles of Existing Demand City 11,734   5.8.7 Maximum Cost per Service Unit The maximum cost per service unit is a calculation of the cost per service unit (dwelling,  1000 sq. ft GFA, acre) for a service area.  This maximum cost per service area is the cost  of the CIP divided by the growth attributable to new development projected to occur  with a 10‐year period.  Table 5‐9 illustrates these calculations for the roadway impact  fees.  The maximum fee per service unit is calculated to be $619.  The credited cost per  service unit is $309.   DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  5‐23  Table 5‐9 Cost Per Service Unit Calculation  Line # Service Area 1 Total Veh‐Miles of Capacity Added by the CIP 26,517 (From Projected Veh‐Miles of New Capacity) (Table 4.7) 2 Total Veh‐Miles of Existing Demand on CIP Roads 11,734 (From Veh‐Miles of Existing Demand on CIP Roadways)(Table 4.8) 3 Total Veh‐Mile of Existing Deficiencies on Existing Roads 1,451 (From Excess Capacity and Deficiencies)(Table 4.4) 4 Net Amount of Veh‐Mile Capacity Added 13,332 (Line #1‐Line #2‐Line #3) 5 Total Eligible Cost of CIP Within Service Area $51,381,000 (From Engineer's Opinion of Probable Construction Costs)(Table 4.6) 6 Cost of Net Capacity Supplied $25,832,614 (Net of Capacity Added/Total of Capacity Added)*CIP Cost ‐(Line #4/Line #1)*(Line #5) 7 Cost to Meet Existing Needs and Usage $25,548,386 (Total Cost of CIP‐Cost of Net Capacity Supplied) ‐Line #5‐Line #6 8 Total Veh‐Mile of New Demand Over 10 Years 41,679 (From Projected Vehicle‐Miles of New Demand)(Table 4.5) 9 % of Capacity Added Attributed to New Growth 312.6% (Total of New Demand/Net Amount of Capacity Added) ‐Line #8/Line #4 10 If Line 8 > Line 4, Reduce Line 9 to 100% 100.0% 11 Cost of Capacity Added Attributed to New Growth $25,832,614 (Cost of Net Capacity Supplied * Cost Attributed to New Growth) ‐Line #6*Line#10 12 Maximum Fee per Service Unit ‐Without Credit $619 (Cost of Net Capacity Attributed to New Growth/Total Veh‐Mile of New Demand) ‐ Line #11/Line #8 13 Percent of Fee Recoverable 50% 14 Maximum Assessable Fee Per Service Unit $309 (Line #12*Line #13)   5.8.8 Land Use / Vehicle‐Mile Equivalency Table A land use/vehicle‐mile equivalency table establishes the service unit rate for various land uses.   This table is a result of combining PM peak hour trip generation rates with average trip length  information for various land uses.  These rates are based on an appropriate development unit  DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  5‐24  for each land use.  For example; office, retail, and light industrial, are based on development of  1,000 square feet of gross floor area, while single‐family and multi‐family residential is based on  dwelling units.  The City of Coppell’s Land‐Use Vehicle Mile Equivalency Table is made up of five  main land uses with specific use categories, they are:  residential, office, retail/commercial,  light industrial, and institutional.  Table 5‐10 illustrates the total service units generated by the  various land uses.  Appendix G provides the land‐uses used for this table.  Table 5‐10 Land‐Use Vehicle‐Mile Equivalency Table  ITE Land Use Dev. Unit Trip Rate(1) Trip Length Veh‐Mi Per Dev Unit Residential Residential (Medium/Low) DU 1.01 4.20 4.24 Residential (High Density) DU 0.62 4.20 2.60 Others Not Specified DU 1.01 4.20 4.24 Office General Office Building 1000 sq. ft.1.49 4.80 7.15 Medical / Dental Office 1000 sq. ft. 3.46 4.80 16.61 Others Not Specified 1000 sq. ft.1.49 4.80 7.15 Retail / Commercial Shopping Center 1000 sq. ft.1.99 3.20 6.38 Home Improvement Superstore 1000 sq. ft. 1.12 1.95 2.19 Super market 1000 sq. ft.4.64 1.05 4.87 Restaurant 1000 sq. ft. 5.28 1.90 10.02 Fast food with drive thru 1000 sq. ft.15.36 2.15 33.02 Convenience Market with Gasoline Pumps Fuel Positions 5.32 0.90 4.79 Hotel Rooms 0.59 3.20 1.89 Bank with Drive Thru 1000 sq. ft. 10.13 1.25 12.66 Others Not Specified 1000 sq. ft.1.99 3.20 6.38 Light Industrial General Light Industrial 1000 sq. ft.0.98 3.30 3.20 Industrial Park 1000 sq. ft. 0.86 3.30 2.84 Mini Warehouse (Self Storage) 1000 sq. ft.0.26 3.30 0.86 Others Not Specified 1000 sq. ft. 0.97 3.30 3.20 Institutional Jr. / Community College Students 0.12 3.00 0.36 Day Care Center Students 0.82 2.10 1.72 Church 1000 sq. ft. 0.55 1.45 0.80 Others Not Specified 1000 sq. ft.0.55 1.45 0.80 (1) Average Trip Rate with Reductions    DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  5‐25  5.9 Calculating Impact Fees The calculation of the actual fee charged to development is a two‐part process as follows:   Part 1:  Determine number of service units (vehicle‐miles) generated by the development using  the land‐use vehicle‐mile equivalency table.   No. of Development Units x Vehicle‐miles (Total Service Units) per development unit   =    Development’s Vehicle‐miles  Part 2: Calculate the impact due by new development.  This fee based on the cost per service  unit for the service area where the development is located.  Development’s Vehicle‐miles (from part 1) x Cost per vehicle‐mile (from CIP calculation)  =    Impact Fee due from development  Examples:  The following fee would be assessed to new developments which has a maximum  (Assessable) fee per service unit of $310.  A. Single‐Family Dwelling    (1 dwelling unit x 4.24 vehicle‐miles) / 1 dwelling unit = 4.24 vehicle‐miles   4.24 Vehicle‐miles x $309 / vehicle‐mile = $1,310  B. 10,000 square foot (s.f.) General Office Building   (10,000 s.f. x  7.15 vehicles‐miles)/1000 s.f. units = 71.50 vehicle‐miles   71.50  vehicle‐miles x $309 / vehicle‐mile = $22,093  C. 60,000 s.f. Retail Shopping Center   (60,000 s.f. x 6.38 vehicle‐miles)/ 1,000 s.f. units = 382.80 vehicle‐miles   475.20 vehicle‐miles x $309/vehicle‐mile = $146,837  D. 100,000 s.f. Light Industrial Development   (100,000 s.f. x 3.20 vehicle‐miles)/ 1,000 s.f. units =320 vehicle‐miles     323 vehicle‐miles x $309/ vehicle‐mile = $99,807  DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  5‐26  E. 4,000 Student Junior/Community College   (4,000 Students. x 0.36vehicle‐miles)/ 1 Student = 1,440 vehicle‐miles    1,440 vehicle‐miles x $309/ vehicle‐mile = $444,960  DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell    Appendix A  Water System Project Cost Estimates    OPINION OF PROBABLE COST Construction Project Number 1 ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL 1 20" Pipe 4,618 LF $120 554,208 2 30" Boring and Casing 200 LF $465 93,000 3 Pavement Repair 3,500 LF $50 175,000 SUBTOTAL: $822,210 CONTINGENCY 20% $164,450 SUBTOTAL: $986,660 ENG/SURVEY 15% $148,000 SUBTOTAL: $1,134,660 PROJECT TOTAL $1,134,660 City of the Coppell Water CIP Project Description 20-inch water line from Southwestern EST Detailed Description Replacement of existing 12-inch with a 20-inch water line from the Southwestern Elevated Storage Tank UPDATE DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  Appendix B  Existing Roadway Inventory    St r e e t F r o m T o L e n g t h P a v e m e n t N o . o f T r a f f i c V o l u m e T r a f f i c V o l u m e T D P C o n f i g (F T ) T y p e L a n e s ( P M ) N / E ( P M ) S / W PA R K W A Y B L V D CO P P E L L R O A D D E N T O N T A P R O A D 6 2 1 0 C O N C 4 D 2 5 4 2 6 6 C 4 D PA R K W A Y B L V D DE N T O N T A P R O A D M O O R E R O A D 5 4 0 0 C O N C 4 D 5 2 1 2 9 0 C 4 D PA R K W A Y B L V D MO O R E R O A D S A M U E L B L V D . 1 6 5 0 C O N C 2 U 5 2 1 2 9 0 C 2 U PA R K W A Y B L V D SA M U E L B L V D . M A C A R T H U R B L V D . 3 5 5 0 C O N C 4 U 5 2 1 2 9 0 C 4 U SA N D Y L A K E R O A D CI T Y L I M I T ( W E S T ) C O P P E L L R O A D 4 9 8 0 C O N C 4 D 3 1 2 4 6 5 C 4 D / 6 SA N D Y L A K E R O A D CO P P E L L R O A D D E N T O N T A P R O A D 5 8 7 0 C O N C 4 D 6 4 5 6 8 2 C 2 U SA N D Y L A K E R O A D DE N T O N T A P R O A D M A C A R T H U R B L V D . 1 0 3 3 0 C O N C 4 D 8 4 2 9 0 3 C 4 D SA N D Y L A K E R O A D MA C A R T H U R B L V D . C I T Y L I M I T ( E A S T ) 4 9 2 0 C O N C 4 D 5 6 5 1 , 4 0 1 C 4 D / 6 BE T H E L R O A D CI T Y L I M I T ( W E S T ) F R E E P O R T P K W Y . 6 4 3 0 C O N C 4 D 3 7 3 3 2 8 C 2 U BE T H E L R O A D FR E E P O R T P K W Y . D E N T O N T A P R O A D 5 3 1 0 A S P 2 U 3 8 3 3 4 5 C 2 U SO U T H W E S T E R N B L V D FR E E P O R T P K W Y . C O P P E L L R O A D 1 7 9 0 C O N C 2 U 1 9 7 1 5 4 C 4 U SO U T H W E S T E R N B L V D CO P P E L L R O A D D E N T O N T A P R O A D 3 6 1 0 C O N C 2 U 1 9 7 1 5 4 C 2 U BE L T L I N E R O A D CI T Y L I M I T ( S O U T H ) S O U T H W E S T E R N B L V D . 8 4 5 0 C O N C 6 D 2 2 8 1 1 1 7 5 P 6 D BE L T L I N E R O A D SO U T H W E S T E R N B L V D . M A C A R T H U R B L V D . 1 2 0 9 0 C O N C 4 D 9 8 0 6 3 3 P 6 D BE L T L I N E R O A D MA C A R T H U R B L V D . C I T Y L I M I T ( E A S T ) 5 8 1 0 C O N C 6 D 1 0 3 1 1 3 2 0 P 6 D RO Y A L L A N E CI T Y L I M I T ( S O U T H ) B E T H E L R O A D 2 9 9 0 C O N C 4 D 6 1 7 5 6 0 C 4 D RO Y A L L A N E BE T H E L R O A D S A N D Y L A K E R O A D 6 1 4 0 C O N C 4 D 4 4 3 3 9 9 C 4 D / 6 FR E E P O R T P K W Y IH - 6 3 5 B E T H E L R O A D 6 7 4 0 C O N C 4 D 5 3 1 1 1 9 7 C 4 D / 6 FR E E P O R T P K W Y BE T H E L R O A D R U B Y R O A D 3 2 2 0 C O N C 4 D 3 4 2 1 5 2 C 4 D / 6 FR E E P O R T P K W Y RU B Y R O A D S A N D Y L A K E R O A D 3 9 4 0 A / C 2 U 7 5 8 1 2 8 C 2 U CO P P E L L R O A D SO U T H W E S T E R N B L V D . B E T H E L R O A D 2 1 4 0 A S P 2 U 2 0 2 1 7 0 C 2 U CO P P E L L R O A D BE T H E L R O A D S A N D Y L A K E R O A D 5 3 6 0 A S P 2 U 2 0 2 1 7 0 C 2 U DE N T O N T A P R O A D SO U T H W E S T E R N B L V D . S A N D Y L A K E R O A D 7 8 6 0 C O N C 6 D 2 3 1 5 8 4 7 P 6 D DE N T O N T A P R O A D SA N D Y L A K E R O A D C I T Y L I M I T ( N O R T H ) 6 0 2 0 C O N C 6 D 2 1 6 2 1 1 0 0 P 6 D MA C A R T H U R B L V D BE L T L I N E R O A D N . O F R I V E R C H A S E 1 5 6 5 C O N C 6 D 1 , 4 1 9 7 4 5 C 4 D MA C A R T H U R B L V D N. O F R I V E R C H A S E S A N D Y L A K E R O A D 4 9 4 0 C O N C 4 D 1 , 4 1 9 7 4 5 C 4 D MA C A R T H U R B L V D SA N D Y L A K E R O A D C I T Y L I M I T ( N O R T H ) 1 0 0 0 0 C O N C 4 D 1 , 2 9 3 6 2 3 C 4 D Co p p e l l R o a d w a y I m p a c t F e e s 2 0 1 1 Ex i s t i n g R o a d w a y I n v e n t o r y DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  Appendix C  Existing Roadway Capacity, Demand, Excess  Capacity and Deficiencies    Le n g t h L e n g t h L a n e s T y p e V e h - M i Ro a d w a y F r o m T o ( F e e t ) ( M i l e s ) C a p a c i t y T o t a l % i n D i r e c t i o n a l V e h - M i V e h - M i V e h - M i V e h - M i E x c e s s E x c e s s T o t a l E x c e s s E x c e s s E x c e s s T o t a l A B V o l u m e S e r v i c e S u p p l y T o t a l D i r e c t i o n A D i r e c t i o n B T o t a l C a p a c i t y C a p a c i t y C a p c i t y D e f i c i e n c i e s D e f i c i e n c i e s D e f i c i e n c i e s Pk - H r N o r t h b o u n d S o u t h b o u n d A r e a S u p p l y D e m a n d D e m a n d D e m a n d D i r e c t i o n A D i r e c t i o n B P e a k - H o u r D i r e c t i o n A D i r e c t i o n B P e a k - H o u r Pe r l a n e E a s t b o u n d W e s t b o u n d P e a k - H o u r P e a k - H o u r P e a k - H o u r P e a k - H o u r P e a k - H o u r V e h - M i V e h - M i V e h - M i v e h - M i v e h - M i v e h - M i PA R K W A Y B L V D CO P P E L L R O A D D E N T O N T A P R O A D 6 2 1 0 1 . 1 8 4 C 4 D 6 2 5 25 4 2 6 6 52 0 1 0 0 % 1 4 7 0 2 , 9 4 0 2 9 9 3 1 3 6 1 2 1 , 1 7 1 1 , 1 5 7 2 , 3 2 9 0 0 0 PA R K W A Y B L V D DE N T O N T A P R O A D M O O R E R O A D 5 4 0 0 1 . 0 2 4 C 4 D 6 2 5 52 1 2 9 0 81 1 1 0 0 % 1 2 7 8 2 , 5 5 7 5 3 3 2 9 7 8 2 9 7 4 6 9 8 2 1 , 7 2 7 0 0 0 PA R K W A Y B L V D MO O R E R O A D S A M U E L B L V D . 1 6 5 0 0 . 3 1 2 C 2 U 3 5 0 52 1 2 9 0 81 1 1 0 0 % 1 0 9 2 1 9 1 6 3 9 1 2 5 3 0 1 9 1 9 - 5 3 0 - 5 3 PA R K W A Y B L V D SA M U E L B L V D . M A C A R T H U R B L V D . 3 5 5 0 0 . 6 7 4 C 4 U 4 4 0 52 1 2 9 0 81 1 1 0 0 % 5 9 2 1 , 1 8 3 3 5 0 1 9 5 5 4 5 2 4 1 3 9 7 6 3 8 0 0 0 SA N D Y L A K E R O A D CI T Y L I M I T ( W E S T ) C O P P E L L R O A D 4 9 8 0 0 . 9 4 4 C 4 D 6 2 5 31 2 4 6 5 77 7 1 0 0 % 1 1 7 9 2 , 3 5 8 2 9 4 4 3 9 7 3 3 8 8 5 7 4 0 1 , 6 2 5 0 0 0 SA N D Y L A K E R O A D CO P P E L L R O A D D E N T O N T A P R O A D 5 8 7 0 1 . 1 1 4 C 2 U 3 5 0 64 5 6 8 2 1, 3 2 7 1 0 0 % 7 7 8 1 , 5 5 6 7 1 7 7 5 8 1 , 4 7 5 6 1 2 0 8 1 0 0 0 SA N D Y L A K E R O A D DE N T O N T A P R O A D M A C A R T H U R B L V D . 1 0 3 3 0 1 . 9 6 4 C 4 D 6 2 5 84 2 9 0 3 1, 7 4 5 1 0 0 % 2 4 4 6 4 , 8 9 1 1 , 6 4 7 1 , 7 6 7 3 , 4 1 4 7 9 8 6 7 9 1 , 4 7 7 0 0 0 SA N D Y L A K E R O A D MA C A R T H U R B L V D . C I T Y L I M I T ( E A S T ) 4 9 2 0 0 . 9 3 4 C 4 D 6 2 5 56 5 1 , 4 0 1 1, 9 6 6 1 0 0 % 1 1 6 5 2 , 3 3 0 5 2 6 1 , 3 0 5 1 , 8 3 2 6 3 8 0 6 3 8 0 - 1 4 1 - 1 4 1 BE T H E L R O A D CI T Y L I M I T ( W E S T ) F R E E P O R T P K W Y . 6 4 3 0 1 . 2 2 4 C 2 U 3 5 0 37 3 3 2 8 70 0 1 0 0 % 8 5 2 1 , 7 0 5 4 5 4 3 9 9 8 5 3 3 9 9 4 5 4 8 5 2 0 0 0 BE T H E L R O A D FR E E P O R T P K W Y . D E N T O N T A P R O A D 5 3 1 0 1 . 0 1 2 C 2 U 3 5 0 38 3 3 4 5 72 7 1 0 0 % 3 5 2 7 0 4 3 8 5 3 4 6 7 3 1 0 6 6 - 3 3 0 - 3 3 SO U T H W E S T E R N B L V D FR E E P O R T P K W Y . C O P P E L L R O A D 1 7 9 0 0 . 3 4 2 C 4 U 4 4 0 19 7 1 5 4 35 1 1 0 0 % 1 4 9 2 9 8 6 7 5 2 1 1 9 8 2 9 7 1 7 9 0 0 0 SO U T H W E S T E R N B L V D CO P P E L L R O A D D E N T O N T A P R O A D 3 6 1 0 0 . 6 8 2 C 2 U 3 5 0 19 7 1 5 4 35 1 1 0 0 % 2 3 9 4 7 9 1 3 5 1 0 5 2 4 0 1 0 5 1 3 4 2 3 9 0 0 0 BE L T L I N E R O A D CI T Y L I M I T ( S O U T H ) S O U T H W E S T E R N B L V D . 8 4 5 0 1 . 6 0 6 P 6 D 7 0 0 2, 2 8 1 1 , 1 7 5 3, 4 5 6 1 0 0 % 3 3 6 1 6 , 7 2 2 3 , 6 5 0 1 , 8 8 0 5 , 5 3 1 0 1 , 4 8 0 1 , 4 8 0 - 2 9 0 0 - 2 9 0 BE L T L I N E R O A D SO U T H W E S T E R N B L V D . M A C A R T H U R B L V D . 1 2 0 9 0 2 . 2 9 4 P 6 D 7 0 0 98 0 6 3 3 1, 6 1 3 4 3 % 3 2 0 6 6 , 4 1 1 2 , 2 4 4 1 , 4 4 9 3 , 6 9 3 9 6 2 1 , 7 5 6 2 , 7 1 8 0 0 0 BE L T L I N E R O A D MA C A R T H U R B L V D . C I T Y L I M I T ( E A S T ) 5 8 1 0 1 . 1 0 6 P 6 D 7 0 0 1, 0 3 1 1 , 3 2 0 2, 3 5 1 1 0 0 % 2 3 1 1 4 , 6 2 2 1 , 1 3 4 1 , 4 5 3 2 , 5 8 7 1 , 1 7 6 8 5 8 2 , 0 3 5 0 0 0 RO Y A L L A N E CI T Y L I M I T ( S O U T H ) B E T H E L R O A D 2 9 9 0 0 . 5 7 4 C 4 D 6 2 5 61 7 5 6 0 1, 1 7 6 1 0 0 % 7 0 8 1 , 4 1 6 3 4 9 3 1 7 6 6 6 3 5 9 3 9 1 7 5 0 0 0 0 RO Y A L L A N E BE T H E L R O A D S A N D Y L A K E R O A D 6 1 4 0 1 . 1 6 4 C 4 D 6 2 5 44 3 3 9 9 84 2 1 0 0 % 1 4 5 4 2 , 9 0 7 5 1 5 4 6 4 9 7 9 9 3 8 9 9 0 1 , 9 2 8 0 0 0 FR E E P O R T P K W Y IH - 6 3 5 B E T H E L R O A D 6 7 4 0 1 . 2 8 4 C 4 D 6 2 5 53 1 1 , 1 9 7 1, 7 2 8 1 0 0 % 1 5 9 6 3 , 1 9 1 6 7 8 1 , 5 2 8 2 , 2 0 6 9 1 8 6 8 9 8 5 0 0 0 FR E E P O R T P K W Y BE T H E L R O A D R U B Y R O A D 3 2 2 0 0 . 6 1 4 C 4 D 6 2 5 34 2 1 5 2 49 3 1 0 0 % 7 6 2 1 , 5 2 5 2 0 8 9 3 3 0 1 5 5 4 6 7 0 1 , 2 2 4 0 0 0 FR E E P O R T P K W Y RU B Y R O A D S A N D Y L A K E R O A D 3 9 4 0 0 . 7 5 2 C 2 U 3 5 0 75 8 1 2 8 88 6 1 0 0 % 2 6 1 5 2 2 5 6 6 9 6 6 6 1 0 1 6 6 1 6 6 - 3 0 4 0 - 3 0 4 CO P P E L L R O A D SO U T H W E S T E R N B L V D . B E T H E L R O A D 2 1 4 0 0 . 4 1 2 C 2 U 3 5 0 20 2 1 7 0 37 2 1 0 0 % 1 4 2 2 8 4 8 2 6 9 1 5 1 6 0 7 3 1 3 3 0 0 0 CO P P E L L R O A D BE T H E L R O A D S A N D Y L A K E R O A D 5 3 6 0 1 . 0 2 2 C 2 U 3 5 0 20 2 1 7 0 37 2 1 0 0 % 3 5 5 7 1 1 2 0 5 1 7 3 3 7 8 1 5 0 1 8 3 3 3 3 0 0 0 DE N T O N T A P R O A D SO U T H W E S T E R N B L V D . S A N D Y L A K E R O A D 7 8 6 0 1 . 4 9 6 P 6 D 7 0 0 2, 3 1 5 8 4 7 3, 1 6 2 1 0 0 % 3 1 2 6 6 , 2 5 2 3 , 4 4 6 1 , 2 6 1 4 , 7 0 7 0 1 , 8 6 5 1 , 8 6 5 - 3 2 0 0 - 3 2 0 DE N T O N T A P R O A D SA N D Y L A K E R O A D C I T Y L I M I T ( N O R T H ) 6 0 2 0 1 . 1 4 6 P 6 D 7 0 0 2, 1 6 2 1 , 1 0 0 3, 2 6 2 1 0 0 % 2 3 9 4 4 , 7 8 9 2 , 4 6 5 1 , 2 5 4 3 , 7 1 9 0 1 , 1 4 0 1 , 1 4 0 - 7 1 0 - 7 1 MA C A R T H U R B L V D . BE L T L I N E R O A D N . O F R I V E R C H A S E 1 5 6 5 0 . 3 0 6 C 4 D 6 2 5 1, 4 1 9 7 4 5 2, 1 6 4 1 0 0 % 5 5 6 1 , 1 1 2 4 2 1 2 2 1 6 4 1 1 3 5 3 3 5 4 7 0 0 0 0 MA C A R T H U R B L V D . N. O F R I V E R C H A S E S A N D Y L A K E R O A D 4 9 4 0 0 . 9 4 4 C 4 D 6 2 5 1, 4 1 9 7 4 5 2, 1 6 4 1 0 0 % 1 1 7 0 2 , 3 3 9 1 , 3 2 8 6 9 7 2 , 0 2 5 0 4 7 2 4 7 2 - 1 5 8 0 - 1 5 8 MA C A R T H U R B L V D SA N D Y L A K E R O A D C I T Y L I M I T ( N O R T H ) 1 0 0 0 0 1 . 8 9 4 C 4 D 6 2 5 1, 2 9 3 6 2 3 1, 9 1 6 1 0 0 % 2 3 6 7 4 , 7 3 5 2 , 4 4 9 1 , 1 8 0 3 , 6 2 9 0 1 , 1 8 8 1 , 1 8 8 - 8 1 0 - 8 1 Su b t o t a l 27 . 9 0 68 , 7 5 6 2 5 , 3 1 0 1 8 , 2 0 0 4 3 , 5 1 1 1 0 , 3 7 8 1 6 , 3 1 9 2 6 , 6 9 7 - 1 , 3 1 1 - 1 4 1 - 1 , 4 5 1 Tr a f f i c c o u n t s c o n d u c t e d i n A u g u s t 2 0 1 1 Ho u r l y V e h i c l e - M i l e Ca p a c i t y p e r L a n e Mi l e o f R o a d w a y F a c i l i t y Ro a d w a y F a c i l i t y T y p e D e s i g n a t i o n f o r L O S " C / D " Pr i n c i p a l A r t e r i a l - D i v i d e d P 6 D 7 0 0 Di v i d e d L o c a l A r t e r i a l s C 4 D 6 2 5 Un d i v i d e d C o l l e c t o r s - 4 l a n e C 4 U 4 4 0 Un d i v i d e d C o l l e c t o r s - 2 L a n e C 2 U 3 5 0 Di r e c t i o n Co p p e l l R o a d w a y I m p a c t F e e s 2 0 1 1 Ex i s t i n g R o a d w a y C a p a c i t y , D e m a n d , E x c e s s C a p a c i t y a n d D e f i c i e n c i e s PM P e a k - H o u r V o l u m e Fr e e s e a n d N i c h o l s , I n c . 4 0 5 5 I n t e r n a t i o n a l P l a z a , S t e . 2 0 0 Fort Worth, Texas 76109-4895 DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  Appendix D  Projected Vehicle‐Miles of New Demand    Year 2011 TOTAL SERVICE UNITS1 Unit of Trip No. of Land Use (Veh-Mi/Dev Unit) Generation Units per Acre2 Acres Veh-Mile3 Commercial Commercial/Office/Retail 5.13 1000 sq.ft. GFA 10.89 309 17,282 4Freeway Commercial/Office/Retail 5.13 1000 sq.ft. GFA 10.89 94 3,157 *Light Industrial 2.55 1000 sq.ft. GFA 15.24 1,369 53,138 Public Institutional 1.76 1000 sq.ft. GFA 15.24 497 13,338 Residential Residential High Density 2.60 DU 16 181 7,521 Residential Medium Density 3.90 DU 4 34 535 Residential Low Density 3.90 DU 2 2,755 21,506 Parks and Open Space 0.38 Acres 1 905 340 Total 6,144 116,817 * Assumed 77% of the existing developed non-residential is industrial Year 2021 TOTAL SERVICE UNITS1 Unit of Trip No. of Land Use (Veh-Mi/Dev Unit) Generation Units per Acre2 Acres Veh-Mile3 Commercial Commercial/Office/Retail 5.13 1000 sq.ft. GFA 10.89 480 26,781 4Freeway Commercial/Office/Retail 5.13 1000 sq.ft. GFA 10.89 688 23,049 Light Industrial 2.55 1000 sq.ft. GFA 15.24 1,578 61,267 Public Institutional 1.76 1000 sq.ft. GFA 15.24 497 13,349 Residential Residential High Density 2.60 DU 16 181 7,521 Residential Medium Density 3.90 DU 4 74 1,155 Residential Low Density 3.90 DU 2 3,194 24,928 Parks and Open Space 0.38 Acres 1 1,183 445 Total 7,874 158,496 Difference 2011-2021 TOTAL SERVICE UNITS1 Unit of Trip No. of Land Use (Veh-Mi/Dev Unit) Generation Units per Acre2 Acres Veh-Mile3 Commercial Commercial/Office/Retail 5.13 1000 sq.ft. GFA 10.89 170 9,499 4Freeway Commercial/Office/Retail 5.13 1000 sq.ft. GFA 10.89 594 19,893 Light Industrial 2.55 1000 sq.ft. GFA 15.24 209 8,129 Public Institutional 1.76 1000 sq.ft. GFA 15.24 01 1 Residential Residential High Density 2.60 DU 16 00 Residential Medium Density 3.90 DU 4 40 621 Residential Low Density 3.90 DU 2 438 3,421 Parks and Open Space 0.38 Acres 1 279 105 Total 1,730 41,679 ACRES TO UNIT OF TRIP GENERATION CONVERSION FACTORS Number of Dwelling Units per Acre Notes: (High Density) 16 units per acre 1 See Average Land Use Trip Calculations 2 See Trip Generation Conversion Factors Number of Dwelling Units per Acre 3 Calculated by multiplying the Total Service Units by the No. of units (Medium Density) 4 units per acre per Acres by the Acres provided in the land use assumptions 4 Reduce the Freeway Commercial/Office/Retail by 40%. Number of Dwelling Units per Acre The 40% represents the number of trips added to the (Low Density) 2 units per acre Freeway system and not the Coppell Roadway System Gross Floor Area per Acre (Commercial) 25% coverage 10.89* sq ft per acre Gross Floor Area per Acre (Light Industrial) 35% coverage 15.24* sq ft per acre Gross Floor Area per Acre (Public Institutional) 35% coverage 15.24* sq ft per acre *all #'s are for 1,000 square feet INCREASE IN VEH-MILES Projected Vehicle Miles of New Demand YEAR 2011 (EXISTING) YEAR 2021 (PROJECTED) Freese and Nichols, Inc. 4055 International Plaza, Ste. 200 Fort Worth, Texas 76109-4895 DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  Appendix E  Engineer’s Opinion of Probable Construction  Cost     OPINION OF PROBABLE CONSTRUCTION COST SCHEMATIC DESIGN PHASE TEAGUE NALL AND PERKINS, INC. CONSULTING ENGINEERS CLIENT: CITY OF COPPELL DESCRIPTION: WEST SANDY LAKE ROAD - PHASE II (COPPELL ROAD NORTH TO DENTON TAP ROAD) DATE: APRIL 2004 ITEM NO. DESCRIPTION OF ITEMS QUANTITY UNIT UNIT COST TOTAL PAVING IMPROVEMENTS 1 RIGHT-OF-WAY PREPARATION 7820 STA $25.00 $195,500 2 MOBILIZATION 1 LS $200,000.00 $200,000 3 CONCRETE REMOVAL 5000 SY $5.00 $25,000 4 HMAC REMOVAL 17100 SY $5.00 $85,500 5 UNCLASSIFIED STREET EXCAVATION 50000 CY $6.00 $300,000 6 8" CEMENT STABLIZED SUBGRADE 44000 SY $1.85 $81,400 7 CEMENT STABLIZATION (42#/SY) 924 TON $85.00 $78,540 8 8" REINFORCED CONCRETE PAVEMENT 42400 SY $27.50 $1,166,000 9 8" ENHANCED PAVEMENT 1500 SY $100.00 $150,000 10 REMOVE 6" HMAC PAVEMENT TRANSITION 1450 SY $5.00 $7,250 11 STEPPED BLOCK RETAINING WALLS 750 SF $25.00 $18,750 12 6" REINFORCED CONCRETE DRIVEWAY 800 SY $30.00 $24,000 13 PVC CONDUIT 5800 LF $10.00 $58,000 14 PAVEMENT MARKINGS AND SIGNAGE 1 LS $80,000.00 $80,000 15 BARRICADES, SIGNS & TRAFFIC CONTROL 1 LS $200,000.00 $200,000 16 EROSION CONTROL 1 LS $50,000.00 $50,000 17 10' BIKE PATH 53100 SF $3.50 $185,850 18 5' SIDEWALK 25650 SF $3.00 $76,950 19 STREET LIGHT FOUNDATION 60 EA $2,000.00 $120,000 20 RESTORE PARKWAYS 7820 STA $20.00 $156,400 21 RESTORE/RECONSTRUCT EXISTING IRRIGATION 1 LS $30,000.00 $30,000 SUBTOTAL PAVING $3,289,140 BRIDGE IMPROVEMENTS 1 DEMO EXISTING BRIDGE 1 EA $35,000.00 $35,000 2 FLEXIBLE BASE 280 CY $50.00 $14,000 3 18" DRILL PIERS 152 LF $60.00 $9,120 4 30" DRILLED PIERS 375 LF $90.00 $33,750 5 CONCRETE ABUTMENTS 105 CY $550.00 $57,750 6 CONCRETE BENTS 83 CY $600.00 $49,800 7 8" THICK BRIDGE DECK 13004 SF $12.00 $156,048 8 EXPOXY WATERPROOFING 3650 SF $1.00 $3,650 9 CONCRETE SURFACE TREATMENT 12716 SF $1.50 $19,074 10 TYPE C PRESTRESSED CONCRETE GIRDERS 1581 LF $70.00 $110,670 11 CONCRETRE RIP-RAP 175 CY $250.00 $43,750 12 STRUCTURAL STEEL - ARMOR JOINT 6400 LB $4.00 $25,600 13 SPECIAL TRAFFIC / PEDESTRIAN RAIL 193 LF $125.00 $24,125 14 SPECIAL TRAFFIC / BICYCLE RAIL 386 LF $140.00 $54,040 15 CONCRETE APPROACH SLABS 144 CY $250.00 $36,000 16 METAL BEAM GUARD FENCE 400 LF $25.00 $10,000 17 ELECTRICAL CONDUIT 880 LF $3.00 $2,640 18 LIGHT STANDARDS 4 EA $1,500.00 $6,000 19 ENHANCED PAVEMENT 2175 SF $5.00 $10,875 SUBTOTAL BRIDGE $701,892 WATER IMPROVEMENTS 1 RELOCATE / ADJUST 24" WATER LINE 700 LF $150.00 $105,000 2 RELOCATE MISC. WATER (HYDRANTS, VALVES, ETC) 1 LS $50,000.00 $50,000 SUBTOTAL WATER $155,000 SANITARY SEWER IMPROVEMENTS 1 8" SS LINE 230 LF $100.00 $23,000 2 ADJUST MH & MISC. 1 LS $10,000.00 $10,000 SUBTOTAL SANITARY SEWER $33,000 UTILITY ADJUSTMENTS 1 RELOCATE TXU OVERHEAD TRASMISSION POLES 4 EA $10,000.00 $40,000 SUBTOTAL UTILITY ADJUSTMENT $40,000 STORM DRAIN IMPROVEMENTS 1 DEMO RCP STORM DRAIN 849 LF $7.50 $6,368 2 DEMO HEADWALLS 6 EA $500.00 $3,000 3 CONNECT TO EXISTING RCP 7 EA $400.00 $2,800 4 CONNECT TO EXISTING 10x8 RCB 1 EA $1,500.00 $1,500 5 5'X3' RCB 385 LF $215.00 $82,775 6 6'X3' RCB 190 LF $225.00 $42,750 7 6'X4' RCB 440 LF $230.00 $101,200 8 9'X6' RCB 130 LF $300.00 $39,000 9 10'X8' RCB 50 LF $360.00 $18,000 10 48" CLASS III RCP 240 LF $100.00 $24,000 11 42" CLASS III RCP 110 LF $95.00 $10,450 12 39" CLASS III RCP 85 LF $90.00 $7,650 13 36" CLASS III RCP 440 LF $70.00 $30,800 14 33" CLASS III RCP 275 LF $65.00 $17,875 15 30" CLASS III RCP 185 LF $60.00 $11,100 16 27" CLASS III RCP 50 LF $55.00 $2,750 17 24" CLASS III RCP 665 LF $50.00 $33,250 18 21" CLASS III RCP 455 LF $45.00 $20,475 19 18" CLASS III RCP 900 LF $40.00 $36,000 20 10' RECESSED CURB INLET 6 EA $2,500.00 $15,000 21 12' RECESSED CURB INLET 5 EA $2,750.00 $13,750 22 14' RECESSED CURB INLET 5 EA $3,000.00 $15,000 23 20' RECESSED CURB INLET 5 EA $3,500.00 $17,500 24 4' COMBINATION INLET 1 EA $2,500.00 $2,500 25 6x6 DROP INLET 1 EA $5,000.00 $5,000 26 6' SQUARE MANHOLE 2 EA $5,000.00 $10,000 27 5' SQUARE MANHOLE 1 EA $4,000.00 $4,000 28 4' SQUARE MANHOLE 7 EA $3,000.00 $21,000 29 TRENCH SAFETY 4600 LF $2.00 $9,200 30 WINGWALL FOR MBC 9x6 1 EA $10,000.00 $10,000 SUBTOTAL DRAINAGE $614,693 TRAFFIC SIGNAL IMPROVEMENT 1 SIGNALIZATION FOR 2 INTERSECTIONS 1 LS $155,000.00 $155,000 SUBTOTAL SIGNALIZATION $155,000 LANDSCAPING / IRRIGATION 1 WEST SANDY LAKE ROAD 1 LS $500,000.00 $500,000 2 404 MITIGATION 1 LS $50,000.00 $50,000 SUBTOTAL LANDSCAPING $550,000 OPINION OF PROBABLE CONSTRUCTION COST SCHEMATIC DESIGN PHASE TEAGUE NALL AND PERKINS, INC. CONSULTING ENGINEERS CLIENT: CITY OF COPPELL DESCRIPTION: WEST SANDY LAKE ROAD - PHASE II (COPPELL ROAD NORTH TO DENTON TAP ROAD) DATE: APRIL 2004 COST OPINION SUMMARY-PHASE II I PAVING IMPROVEMENTS $3,289,140 II BRIDGE IMPROVEMENTS $701,892 III WATER IMPROVEMENTS $155,000 IV SANITARY SEWER IMPROVEMENTS $33,000 V UTILITY ADJUSTMENTS $40,000 VI STORM DRAIN IMPROVEMENTS $614,693 VII TRAFFIC SIGNAL IMPROVEMENTS $155,000 VIII LANDSCAPING IMPROVEMENTS $550,000 SUBTOTAL $5,538,725 CONTINGENCY (10%) $553,870 CONSTRUCTION TOTAL $6,093,000 FLOODPLAIN/ENVIRONMENTAL APPLICATION FEES $9,000 PROJECT TOTAL $6,102,000 Roadway Description:Quantity Unit Roadway Length 3,400 LF Right-of-Way Width 110 FT Roadway Width (BOC - BOC) 66 FT Undivided Roadway = 1 , Divided Roadway = 2 2 Item No. Item Description Quantity Unit Unit Cost Total Cost 1 Mobilization (5% of Construction Cost) 1 LS $100,000.00 $100,000 2 Right of Way Preparation 10 ACRE $2,000.00 $20,000 3 Unclassified Street Excavation or Embankment 8,400 CY $10.00 $84,000 4 8" Reinforced Concrete Pavement 27,500 SY $28.00 $770,000 5 8" Lime or Cement Stabilized Subgrade 28,300 SY $4.00 $113,200 6 Lime or Cement for Stabilization (40lbs/SY) 600 TON $100.00 $60,000 7 6" Monolithic Curb 15,000 LF $5.00 $75,000 8 Sidewalk and Ramps 34,000 SF $4.00 $136,000 9 Drainage Improvements (RCP, Inlets, MH, Outfalls) 1 LS $251,640.00 $251,640 10 Traffic Signals 1 LS $120,000.00 $120,000 11 Hydromulching 13,600 SY $1.00 $13,600 12 Top Soil 13,600 SY $2.00 $27,200 13 Pavement Markings & Signage 13,600 LF $1.00 $13,600 14 Traffic Control 1 LS $33,000.00 $33,000 15 Erosion Control 1 LS $20,000.00 $20,000 16 Landscaping and Irrigation 1 LS $65,000.00 $65,000 17 Lighting (Foundations, Poles, Conduit, Conductors) 30 EA $4,000.00 $120,000 Subtotal Construction Cost Estimate $2,022,300 Contingency 20% $404,500 Total Construction Cost Estimate $2,426,800 Right-of-Way Cost 374,000 SF $4.00 $1,496,000.00 Engineering Services (15% of Construction Cost) 15.0%$364,100.00 Surveying Services (3% of Construction Cost)3.0%$72,900.00 Geotechnical Services (1% of Construction Cost) 1.0%$24,300.00 Testing (1% of Construction Cost) 1.0%$24,300.00 *Total Capital Cost (Based on Unit Prices for Nov. 2011) $4,409,000.00 *Total Capital Cost Per Foot $1,300.00 *Future Capital Cost (Based on 3% Inflation for 10 years) $5,926,000.00 *This estimate does not include Legal, Administration, or Financial Cost to Sandy Lake Road Date Performed: 11/28/11 City of Coppell, Texas Conceptual Engineer's Opinion of Probable Construction Cost Estimate Freeport Parkway Project Summary: 6-Lane Divided Principal Arterial from SH 121 Roadway Description:Quantity Unit Roadway Length 4,050 LF Right-of-Way Width 95 FT Roadway Width (BOC - BOC) 50 FT Undivided Roadway = 1 , Divided Roadway = 2 2 Item No. Item Description Quantity Unit Unit Cost Total Cost 1 Mobilization (5% of Construction Cost) 1 LS $160,000.00 $160,000 2 Right of Way Preparation 10 ACRE $2,000.00 $20,000 3 Pavement Removal 12,400 SY $8.00 $99,200 4 Unclassified Street Excavation or Embankment 7,500 CY $10.00 $75,000 5 8" Reinforced Concrete Pavement 24,800 SY $28.00 $694,400 6 8" Lime or Cement Stabilized Subgrade 25,800 SY $4.00 $103,200 7 Lime or Cement for Stabilization (40lbs/SY) 600 TON $100.00 $60,000 8 6" Monolithic Curb 17,900 LF $5.00 $89,500 9 Sidewalk and Ramps 40,500 SF $4.00 $162,000 10 Bridge 1 LS $1,300,000.00 $1,300,000 11 Drainage Improvements (RCP, Inlets, MH, Outfalls) 1 LS $261,000.00 $261,000 12 Traffic Signals 1 LS $120,000.00 $120,000 13 Hydromulching 16,700 SY $1.00 $16,700 14 Top Soil 16,700 SY $2.00 $33,400 15 Pavement Markings & Signage 16,200 LF $1.00 $16,200 16 Traffic Control 1 LS $39,000.00 $39,000 17 Erosion Control 1 LS $24,000.00 $24,000 18 Landscaping and Irrigation 1 LS $30,000.00 $30,000 19 Lighting (Foundations, Poles, Conduit, Conductors) 0 EA $4,000.00 $0 Subtotal Construction Cost Estimate $3,303,600 Contingency 20% $660,800 Total Construction Cost Estimate $3,964,400 Right-of-Way Cost 45,000 SF $4.00 $180,000.00 Engineering Services (15% of Construction Cost) 15.0%$594,700.00 Surveying Services (3% of Construction Cost)3.0%$119,000.00 Geotechnical Services (1% of Construction Cost) 1.0%$39,700.00 Testing (1% of Construction Cost) 1.0%$39,700.00 *Total Capital Cost (Based on Unit Prices for Nov. 2011) $4,938,000.00 *Total Capital Cost Per Foot $1,220.00 *Future Capital Cost (Based on 3% Inflation for 10 years) $6,637,000.00 *This estimate does not include Legal, Administration, or Financial Cost to Sandy Lake Rd Date Performed: 11/28/11 City of Coppell, Texas Conceptual Engineer's Opinion of Probable Construction Cost Estimate Freeport Parkway Project Summary: 4-Lane Divided Local Arterial from Ruby Rd DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  Appendix F  Roadway Improvements Plan Project CIP  Service Units of Supply    Le n g t h L e n g t h L a n e s T y p e V e h - M i Pr o j e c t R o a d w a y F r o m T o ( F e e t ) ( M i l e ) C a p a c i t y % i n V e h - M i V e h - M i E x c e s s T o t a l T o t a l Pk - H r A B S e r v i c e T o t a l T o t a l C a p a c i t y P r o j e c t P r o j e c t Pe r l a n e N o r t h b o u n d S o u t h b o u n d A r e a S u p p l y D e m a n d P e a k - H o u r C o s t C o s t Ea s t b o u n d W e s t b o u n d P e a k - H o u r P e a k - H o u r V e h - M i w / F i n a n c i n g RE C O U P E M E N T P R O J E C T S 1* S A N D Y L A K E R O A D C I T Y L I M I T ( W E S T ) C O P P E L L R O A D 4 9 8 0 0 . 9 4 4 C 4 D 6 2 5 3 1 2 4 6 5 1 0 0 % 2 , 3 5 8 7 3 3 1 , 6 2 5 $ 4 , 6 9 7 , 9 0 8 $ 6 , 2 9 6 , 0 0 0 3* S A N D Y L A K E R O A D D E N T O N T A P R O A D M A C A R T H U R B L V D . 1 0 3 3 0 1 . 9 6 4 C 4 D 6 2 5 8 4 2 9 0 3 1 0 0 % 4 , 8 9 1 3 , 4 1 4 1 , 4 7 7 $ 1 1 , 1 4 5 , 3 3 7 $ 1 4 , 9 3 5 , 0 0 0 4* S A N D Y L A K E R O A D M A C A R T H U R B L V D C I T Y L I M I T ( E A S T ) 4 9 2 0 0 . 9 3 4 C 4 D 6 2 5 5 6 5 1 , 4 0 1 1 0 0 % 2 , 3 3 0 1 , 8 3 2 4 9 8 $ 5 , 1 9 3 , 7 2 0 $ 6 , 9 6 0 , 0 0 0 9* B E T H E L R O A D C I T Y L I M I T ( W E S T ) F R E E P O R T P K W Y 6 4 3 0 1 . 2 2 4 C 4 D 6 2 5 3 7 3 3 2 8 1 0 0 % 3 , 0 4 5 8 5 3 2 , 1 9 2 $ 7 , 2 8 0 , 3 2 1 $ 9 , 7 5 6 , 0 0 0 11 * S O U T H W E S T E R N B L V D C O P P E L L R O A D D E N T O N T A P R O A D 1 5 0 0 0 . 2 8 4 C 4 U 4 4 0 1 9 7 1 5 4 1 0 0 % 5 0 0 1 0 0 4 0 0 $ 1 , 2 0 4 , 3 4 9 $ 1 , 6 1 4 , 0 0 0 12 * B E L T L I N E R O A D S O U T H W E S T E R N B L V D . M A C A R T H U R B L V D . 1 2 0 9 0 2 . 2 9 6 P 6 D 7 0 0 9 8 0 6 3 3 4 3 % 4 , 1 3 5 1 , 5 8 8 2 , 5 4 7 $ 5 2 2 , 2 8 3 $ 7 0 0 , 0 0 0 13 * M A C A R T H U R B L V D . B E T H E L S C H O O L R O A D B E L T L I N E R O A D 2 6 3 0 0 . 5 0 6 P 6 D 7 0 0 1 , 4 1 9 7 4 5 1 0 0 % 2 , 0 9 2 1 , 0 7 8 1 , 0 1 4 $ 3 2 5 , 3 9 4 $ 4 3 7 , 0 0 0 EX P A N S I O N P R O J E C T S 2* * S A N D Y L A K E R O A D C O P P E L L R O A D D E N T O N T A P R O A D 5 8 7 0 1 . 1 1 4 C 4 D 6 2 5 6 4 5 6 8 2 1 0 0 % 2 , 7 7 9 1 , 4 7 5 1 , 3 0 4 $ 6 , 1 0 2 , 0 0 0 $ 8 , 1 7 7 , 0 0 0 6* * F R E E P O R T P K W Y S H 1 2 1 S A N D Y L A K E R O A D 3 1 7 0 0 . 6 0 6 P 6 D 7 0 0 0 0 1 0 0 % 2 , 5 2 2 0 2 , 5 2 2 $ 8 8 1 , 8 0 0 $ 1 , 1 8 2 , 0 0 0 7* * F R E E P O R T P K W Y R U B Y R O A D S A N D Y L A K E R O A D 3 9 4 0 0 . 7 5 4 C 4 D 6 2 5 7 5 8 1 2 8 1 0 0 % 1 , 8 6 6 6 6 1 1 , 2 0 4 $ 9 8 7 , 6 0 0 $ 1 , 3 2 4 , 0 0 0 Su b t o t a l 10 . 5 8 2 6 , 5 1 7 1 1 , 7 3 4 1 4 , 7 8 3 $ 3 8 , 3 4 0 , 7 1 1 $ 5 1 , 3 8 1 , 0 0 0 Ho u r l y V e h i c l e - M i l e Ca p a c i t y p e r L a n e Mi l e o f R o a d w a y F a c i l i t y Ro a d w a y F a c i l i t y T y p e D e s i g n a t i o n f o r L O S " C / D " Pr i n c i p a l A r t e r i a l - D i v i d e d P 6 D 7 0 0 Di v i d e d L o c a l A r t e r i a l s C 4 D 6 2 5 Un d i v i d e d C o l l e c t o r s - 4 l a n e C 4 U 4 4 0 Un d i v i d e d C o l l e c t o r s - 2 L a n e C 2 U 3 5 0 PM P e a k - H o u r V o l u m e Di r e c t i o n Co p p e l l R o a d w a y I m p a c t F e e - 2 0 1 1 Ro a d w a y I m p r o v e m e n t s P l a n P r o j e c t CI P S e r v i c e U n i t s o f S u p p l y DRAFT Water, Wastewater and Roadway Impact Fee Report  City of Coppell  Appendix G  Land Use Vehicle‐Mile Equivalency Table      LA N D U S E I T E L a n d U s e 1 IT E L a n d U s e D e v e l o p m e n t T r i p G e n e r a t i o n N o . o f P a s s B y D i v e r t e d A v e r a g e A v e r a g e L a n d U s e T r i p N C T C O G 5 1/2 Trip Average Total Service Units Co d e U n i t Ra t e 2 St u d i e s Ra t e 3 Tr i p s 4 Tr i p R a t e R a t e w i t h d e d u c t i o n s T r i p L e n g t h L e n g t h Trip Length 6 (Veh-Mi/Dev Unit )7 Co m m e r c i a l / O f f i c e / R e t a i l Ge n e r a l O f f i c e 7 1 0 1 0 0 0 s q . f t . 1 . 4 9 2 3 5 0 0 9 . 6 0 4 . 8 0 Me d i c a l - D e n t a l O f f i c e 7 2 0 1 0 0 0 s q . f t . 3 . 4 6 4 3 0 0 9 . 6 0 4 . 8 0 El e c t r o n i c S u p e r s t o r e 8 6 3 1 0 0 0 s q . f t . 4 . 5 3 0 . 4 0 . 3 3 3 . 9 0 1 . 9 5 Ph a r m a c y w i t h d r i v e t h r u 8 8 1 1 0 0 0 s q . f t . 1 0 . 3 5 1 9 0 . 4 9 0 . 1 3 1 . 5 0 0 . 7 5 To y S u p e r s t o r e 8 6 4 1 0 0 0 s q . f t . 4 . 9 9 2 0 0 4 . 3 0 2 . 1 5 Sp e c i a l t y R e t a i l C e n t e r 8 1 4 1 0 0 0 s q . f t . 2 . 7 1 5 0 0 3 . 1 0 1 . 5 5 Fr e e s t a n d i n g D i s c o u n t S u p e r s t o r e 8 1 3 1 0 0 0 s q . f t . 4 . 6 1 6 4 0 . 2 8 0 3 . 8 0 1 . 9 0 Ap p a r e l S t o r e 8 7 6 1 0 0 0 s q . f t . 3 . 8 3 7 0 0 3 . 1 0 1 . 5 5 Re s t u r a n t 9 3 2 1 0 0 0 s q . f t . 1 1 . 1 5 4 6 0 . 4 3 0 . 1 7 3 . 8 0 1 . 9 0 Sh o p p i n g C e n t e r 8 2 0 1 0 0 0 s q . f t . 3 . 7 3 4 1 2 0 . 3 4 0 . 1 9 6 . 4 0 3 . 2 0 Su p e r m a r k e t 8 5 0 1 0 0 0 s q . f t . 1 0 . 5 4 0 0 . 3 6 0 . 3 1 2 . 1 0 1 . 0 5 Fa s t f o o d w i t h d r i v e t h r u 9 3 4 1 0 0 0 s q . f t . 3 3 . 8 4 1 1 8 0 . 4 9 0 . 1 1 4 . 3 0 2 . 1 5 Au t o m o t i v e C a r e C e n t e r 9 4 2 1 0 0 0 s q . f t . 3 . 3 8 5 0 0 4 . 5 0 2 . 2 5 Ho t e l 3 1 0 R o o m s 0 . 5 9 2 5 0 0 6 . 4 0 3 . 2 0 Ba n k w i t h D r i v e T h r u 9 1 2 1 0 0 0 s q . f t . 2 5 . 8 2 7 1 0 . 4 7 0 . 2 6 2 . 5 0 1 . 2 5 Ho m e I m p r o v e m e n t S u p e r s t o r e 8 6 2 1 0 0 0 s q . f t . 2 . 3 7 3 9 0 . 4 8 0 . 0 9 3 . 9 0 1 . 9 5 Au t o P a r t s S a l e s 8 4 3 1 0 0 0 s q . f t . 5 . 9 8 5 0 . 4 3 0 . 1 3 2 . 3 0 1 . 1 5 Ga r d e n C e n t e r 8 1 7 1 0 0 0 s q . f t . 3 . 8 1 2 0 0 3 . 1 0 1 . 5 5 Ar t s a n d C r a f t s S t o r e 8 7 9 1 0 0 0 s q . f t . 6 . 2 1 2 0 0 2 . 3 0 1 . 1 5 Co n v e n i e n c e M a r k e t w i t h G a s o l i n e P u 85 3 F u e l i n g P o s i t i o n s 1 9 . 0 7 5 4 0 . 6 6 0 . 1 8 1 . 8 0 0 . 9 0 Fu r n i t u r e S t o r e 8 9 0 1 0 0 0 s q . f t . 0 . 4 5 1 9 0 . 5 3 0 . 1 6 4 . 8 0 2 . 4 0 Di s c o u n t C l u b 8 5 7 1 0 0 0 s q . f t . 4 . 2 4 2 5 0 0 4 . 0 0 2 . 5 2 2 . 3 0 1 . 1 5 2 . 0 3 5.13 Li g h t I n d u s t r i a l Ge n e r a l L i g h t I n d u s t r i a l 1 1 0 1 0 0 0 s q . f t . 0 . 9 7 2 7 0 0 6 . 6 0 3 . 3 0 In d u s t r i a l P a r k 1 3 0 1 0 0 0 s q . f t . 0 . 8 6 4 2 0 0 6 . 6 0 3 . 3 0 Ma n u f a c t u r i n g 1 4 0 1 0 0 0 s q . f t . 0 . 7 3 5 6 0 0 6 . 6 0 3 . 3 0 Mi n i W a r e h o u s e ( S e l f S t o r a g e ) 1 5 1 1 0 0 0 s q . f t . 0 . 2 6 1 3 0 0 6 . 6 0 3 . 3 0 Ut i l i t i e s 1 7 0 1 0 0 0 s q . f t . 0 . 7 6 3 0 0 0 . 7 7 0 . 7 7 6 . 6 0 3 . 3 0 3 . 3 0 2.55 Pu b l i c I n s t i t u t i o n a l Mi d d l e / J r h i g h s c h o o l 5 2 2 1 0 0 0 s q . f t . 1 . 1 9 9 0 0 4 . 2 0 2 . 1 0 Hi g h S c h o o l 5 3 0 1 0 0 0 s q . f t . 0 . 9 7 2 2 0 0 4 . 2 0 2 . 1 0 Da y C a r e C e n t e r 5 6 5 S t u d e n t s 0 . 8 2 7 1 0 0 4 . 2 0 2 . 1 0 Jr . / C o m m u n i t y C o l l e g e 54 0 S t u d e n t s 0 . 1 2 5 0 0 6 . 0 0 3 . 0 0 Ch u r c h 5 6 0 1 0 0 0 s q . f t . 0 . 5 5 1 2 0 0 0 . 8 2 0 . 8 2 2 . 9 0 1 . 4 5 2 . 1 5 1.76 Re s i d e n t i a l - H i g h D e n s i t y Ap a r t m e n t 2 2 0 D U 0 . 6 2 9 0 0 0 0 . 6 2 0 . 6 2 8 . 4 0 4 . 2 0 4 . 2 0 2.60 Re s i d e n t i a l - M e d i u m / L o w D e n s i t y Si n g l e - f a m i l y d e t a c h e d h o u s i n g 2 1 0 D U 1 . 0 1 3 1 4 0 0 8 . 4 0 4 . 2 0 Re s i d e n t i a l C o n d o m i n i u m / T o w n h o u s 23 0 D U 0 . 5 2 6 2 0 0 0 . 9 3 0 . 9 3 8 . 4 0 4 . 2 0 4 . 2 0 3.90 Pa r k s a n d O p e n S p a c e Ci t y P a r k 4 1 1 a c r e s 0 . 1 6 3 0 0 0 . 1 6 0 . 1 6 4 . 7 0 2 . 3 5 2 . 3 5 0.38 No t e s : 1 S o u r c e I T E T r i p G e n e r a t i o n M a n u a l 8 t h E d i t i o n 2 A v e r a g e n u m b e r o f P M p e a k h o u r t r i p s p e r d e v e l o p m e n t u n i t 3 S o u r c e T r i p G e n e r a t i o n H a n d b o o k , 2 n d E d i t i o n 4 S o u r c e T r i p G e n e r a t i o n H a n d b o o k , 2 n d E d i t i o n 5 So u r c e N C T C O G 1 9 8 4 & 1 9 9 4 W o r k p l a c e S u r v e y a n d 2 0 0 1 N a t i o n a l H o u s e h o l d T r a v e l S u r v e y 6 Mi n i m u m a v e r a g e v a l u e o f 1 / 2 t r i p l e n g t h o r 6 m i l e s 7 Ca l c u l a t e d b y m u l t i p l y i n g t h e a v e r a g e t r i p l e n g t h b y t h e a v e r a g e t r i p r a t e w / d e d u c t i o n s CI T Y O F C O P P E L L AV E R A G E L A N D U S E T R I P C A L C U L A T I O N S