WA1005- CS111024Jessica,
1) Water lines shown on Moore Rd appear to be correct.
2) The 48" SS line along Belt Line Road from the eastern City limit continues west to the intersection of the 30" force main. It appears that the existing 33" is active. (note the junction
box for the 30" FM, 33" Gravity & 48" Gravity)
3) Deforest Lift Station ($2,293,611.41) & Sandy Lake Lift Station ($318,130) = $2,611,741.41 See attached for breakdown.
You should be receiving an email for an FTP site to download the plans requested.
If you need anything further please let me know.
Thank You, George