Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Eckerd's-LR 990303
I G · GEOTECHNICAL ENGINEERING I E . ENVIRONMENTAL CONSULTING GEE Consultants, Inc. E · CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive · Dallas, Texas 75229 ° (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: March 3. 1999 Date Concrete Placed: Februa.ry 3, 1999 Standara 6"x12" Chent: North American Properties-SW Area 28.27 Square Inches Project: Eckerds - Coppell Concrete Report' No.: 10 C,mtractor: C.A. Walker P mle;:t Ni} . 298-0412 Concrete Supplier and Plant: TXI Plant/#41 Locauon t}f Placement: Paving MATERIALS .~ou,,c: SSD Ba~,, w,~. INSPECTION DATA Descnm~on : Lb.q!Cu Yd) Y. lix Number: S2t)3 Time Sample Batched: 09:40 am Cement: Time Sampled: :0:50 Fly Ash: Sample Locatmn: 40' N & 40' E..c NW carnet Track/Ticket No: =S35; 1230260 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 65°F Frae Aggregate: Concrete Range: Admixtures: Slump Range (inches): 6" ! Wea~er Conaitions: Clear Time Sta~ed: t)9-t~ am 2 Time Completed: 02:00 pm Added Water: t5 Gallons Sample A~r C,mtent, % ~. I ~ Total Cubic Ya~s Placco: 40 Reqmred Strength, Lbs. sq.m. ~. ECK 36 7 02/10/99 61.840 2.190 ECK 37 28 03:'03/99 90.520 3.200 ECK 38 28 03."03,99 109.000 3.860 ECK 39 H HOLD ~,:~1'5.t t' ~2.[ .3~.t :43 ,L',aess .',iot~a ()flier'.vise, Cylinders Made By: SM Remarks and/or D~stnbutton: Mr. John Maggiore - North American Properties -SW Mr. Lance Lilly - Richmond Group Architecture & Planning Mr. Gary Stokes - C.A. Walker Construction Mr. Lee Stone - City or' Coppell Mr. Larry Davis - City of Coppell ~:E Consultants, Xnc. R~vl~ed by: ~~ ~ ~