Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Eckerd's-LR 990331
[ G · G~©T~¢~NIC~L ENGIN£ERING I E ! GEE Consultants, Inc. I E . CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: March 3 l, 1999 Date Concrete Placed: Februa_E/ 3. 1999 Standard 6"xi2' Client: North American Properties-SW Area 28.27 Square Inches Project: Eckerds - Coppell Concrete Reporl No.: I 1 Contractor: C.A. Walker P role~.t No.: 298-0412 Concrete Supplier and Plant: TXI Plant/#41 Locanon or Placement: Pavlng MATERIALS ~ ....... ~so .~,~i, w,~. INSPECTION DATA Mix Number: ';,203 'rime Sample Batchcd: i [:10 am C:mcnt: Fimc Sampled. ','2:55 pm F}v Ash: Sample Location. 60' W. & 40' N ,,r NW ~orncr .,~ huildlng Tmck,'Ticket No' :~3T. 1 Coarse Aggregate: Temperature: Intermediate Aggregate: Anlb~cm Range: Fmc Aggregate: Concrete Range: Adlmxmres: Slump Range i lnchcs): Weather Conditions: Clear Time Started: 09:00 am Time Completed: 02:00 pm Added Water: H.) Gallons Sample Air Content, c; ;: Total Cubic Yards Placed: i40 Required Strm~glh :Lbs.-sq.m. ~: 3.0~ ECK 40 7 02/10,'99 59,360 2. iO0 ECK 41 28 03/03..99 79.200 2.800 ~ ECK 42 28 03:03.,'99 80,000 2.830 ~ ECK 43 56 03/31 :'99 100,300 3.550 Test .Me~ho~s L~:hzca I::acture Regular Cvlinders Made By: SM .-~.STM C-3i.C-39.C-!43 Unless Notea Otherwise, - - Remarks andtor D~stribution: 'Notified Gar)..' Stokes w;Walker Construction. Hold cylinder set up to test at 56-days. Mr. John Maggiore - North American Properties -SW Mr. Lance Lilly - Richmond Group Architecture & Planning Mr. Gar3.: Stokes - C.A. Walker Construction Mr. Lee Stone - City of Coppell Mr. LarD' Davis - City of Coppel[