Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Eckerd's-LR 990310
GEOTECHNICAL ENGINEERING . GEE Consultants, Inc. CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive ° Dallas, Texas 75229 ° (214) 352-5433 ° Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: March 10, 1999 Date Concrete Placed: February. 10, 1999 Standard b'xi2" Client: North American Properties-SW Area 2.'¢.27 Square Inches Project: Eckerds - Coppell Concrete Report No.. 12 Contractor: C.A. Walker Project No.: 298-0412 Concrete Supplier and Plant: TXI Plant/#31 Location of Placement: Sidewalk MATERIALS ~ ..... ~sD 8.,c, w,,. ENSPECTION DATA Descr:pt~on · Lbs;CuYd~ .X, Dx Number: :4203 Time Sample Batched: 07:50 am Cement: Time Sampled: 09:00 :.tm Fl.,. Ash: Sample Location: 18' E. & 2' N. of NW corner ot budding Track/Ticket No: 481:1236279 Coarse Aggregate: Temperature: Intermediate Aggregate: A~nbmnr Rauge: ?0~F Fine Aggregate: Concrete Range: 71 'F Adm,xtures: Slump Range dnches~: 0" Weather Condiuons: Cloudy ! Time Started: 07-30 am 2 Time Completed: it):00 am Added Water: 10 Galion~ Sample Air Content ~. 5~ ): 2 '..a % Total Cubic Yards Placed: 10 Required Strength ,: Lbs.; sq. in.,: 3.000 ECK 44 5 02/15/99 55,400 1,960 ECK -1.5 7 02/17.;99 68.800 2.430 ECK 46 6" 28 03/10/99 92,980 3.290 ECK 47 28 03/10/99 93,100 3.290 ECK 48 H HOLD .Ves~ Med'wa.'.s t':ii,zee Fracture Regular Cylinders Made By: RB ASTM C - 3: .C-~9.C- 1.13 , L'nless Noted Othe.-'w,se Remarks andlor Dtstnbution: cc: Mr. John Maggiore - North American Properties -SW Mr. Lance Lilly - Richmond Group Architecture & Planning Mr. Gary Stokes - C.A. Walker Construction Mr. Lee Stone - City of Coppell Mr. Larry Davis- City of Coppell