Eckerd's-LR 990302 (3) GEOTECHNICAL ENGIND-,dNG
. GEE Consultants,
Inc.
CONSTRUCTION MATERIALS TESTING
10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972
REPORT OF MORTAR MIX INSPECTION
Report Date: March 2, 1999 Date Mortar Placed: February I. [999
Client: North American Properties-SW Standard 2"x2"
Project: Eckerds
Coppell, Texas Area a Square Inches
Contractor: C.A. Walker Mortar Report No..
Mortar Supplier and Plant: On-Site ProJect No.: 298-0412
Location or' Placement: Walls
INSPECTION DATA
Time Sample Batched: 02:45 pm
Time Sampled: 02:53 pm
Sample Location: Wall - Grid L from i to 6: H from 21'9" to 23'4"
Temperature:
Ambtent Range: 67 °F
Mortar Range: 66°F
Weather Conditions: Partly Cloudy
Time Started: 02:00 pm
/:me Completed: 04:30 pm
Total Cubic Yard~ Placed:
Required Strength (Lh.~. >q.m.,.
ECK 01 7 02/08/99 8.660 2.160
ECK 02 7 02/08/99 8.040 2.010
ECK 03 7 02/08/99 7.060 1.760
ECK 04 28 03/01;99 1.2.040 3.010
ECK 05 28 03/01/99 12.760 3,190
ECK 06 28 03/01/99 11.100 2,780
\STM C-.Lw) :Unless Noled Otherw:s¢} Cubes Made By: AS
Remarks and;or Distribution:
cc: Mr. John Maggiore - North American Propert~es-SW
Mr. Lance Ldly - Richmond Group Architecture & Planmng
Mr. Gary Stokes - C.A.Walker Construction
Mr. LarD' Dav~s - City or' Coppel[
Mr. Lee Stone - City of Coppell
GEE Consultants, Inc. Revie.ed by: ~~~"