Loading...
Eckerd's-LR 990302 (3) GEOTECHNICAL ENGIND-,dNG . GEE Consultants, Inc. CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF MORTAR MIX INSPECTION Report Date: March 2, 1999 Date Mortar Placed: February I. [999 Client: North American Properties-SW Standard 2"x2" Project: Eckerds Coppell, Texas Area a Square Inches Contractor: C.A. Walker Mortar Report No.. Mortar Supplier and Plant: On-Site ProJect No.: 298-0412 Location or' Placement: Walls INSPECTION DATA Time Sample Batched: 02:45 pm Time Sampled: 02:53 pm Sample Location: Wall - Grid L from i to 6: H from 21'9" to 23'4" Temperature: Ambtent Range: 67 °F Mortar Range: 66°F Weather Conditions: Partly Cloudy Time Started: 02:00 pm /:me Completed: 04:30 pm Total Cubic Yard~ Placed: Required Strength (Lh.~. >q.m.,. ECK 01 7 02/08/99 8.660 2.160 ECK 02 7 02/08/99 8.040 2.010 ECK 03 7 02/08/99 7.060 1.760 ECK 04 28 03/01;99 1.2.040 3.010 ECK 05 28 03/01/99 12.760 3,190 ECK 06 28 03/01/99 11.100 2,780 \STM C-.Lw) :Unless Noled Otherw:s¢} Cubes Made By: AS Remarks and;or Distribution: cc: Mr. John Maggiore - North American Propert~es-SW Mr. Lance Ldly - Richmond Group Architecture & Planmng Mr. Gary Stokes - C.A.Walker Construction Mr. LarD' Dav~s - City or' Coppel[ Mr. Lee Stone - City of Coppell GEE Consultants, Inc. Revie.ed by: ~~~"