Loading...
Eckerd's-LR 990225 G · GEOTECHNICAL ENGINI-~.aNG E GEE Consultants, Inc. E° CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 o Fax (214) 352-6972 STRUCTURAL STEEL INSPECTION REPORT Report Date Februa~ 25. 1999 Test Date: February. 22, 1999 Client North American Properties-SW Report No.: Project Eckerds - Coppell Project No.: 298-0412 Identification Field Inspection Method of Test Visual Results On this date a representative of GEE Consultants. Inc. was present at the above referenced project to perform structural steel inspection. The following items were noted during our inspection. Locations;items inspected: Partial Roof Deck ;fl. Puddle welds - Numerous locations found non-compliant for these conditions: a. Deck metal not fused by weld metal b. Joist not fused at 4 plys c. Locations not welded ti. Deck. not all placed Side lap screws not all installed NOTE: Roof material placement has already started prior to this inspection at east end. '~ Discrepancies cc: Mr. John Maggiore - North American Properties-SW Mr. Lance Lilly - Richmond Group Architecture & Planning Mr. GaD' Stokes - C.A.Walker Construction Mr. Larry Davis - City of Coppell Mr. Lee Stone - City of Coppell