Loading...
ST0301C- LR150818G I • GEOTECHNICAL ENGINEERING E I • ENVIRONMENTAL CONSULTING E I • CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive Dallas, Texas 75229 • (214) 352-5433 0 Fax (214) 352-6972 REPORT OF CONCRETE MIX OBSERVATION Report Date: August 18, 2015 Date Concrete Placed: Client: City of Coppell Project: Bethel & Coppell Road Contractor: Iowa Bridge & Culvert LC Concrete Supplier and Plant: LMC 956 Location of Placement: Box Culvert Walls June 19, 2015 Standard 6°x12" Cylinders Cylinder Cross-sectional Area: 28.27 Square Inches Concrete Report No.: 04 Project No.: 215-140 MATERIALS Source / SSD Batch Wts. Description (Lbs/CuYd) OBSERVATION DATA Date Tested Mix Number: 1701 Time Sample Batched: 1:54 PM 3 Time Sampled: 2:55 PM Cement: Sample Location: Middle Two Culvert Walls FI Ash: Y 6/26/15 Truck / Ticket No: 7060/63091967 Coarse Aggregate: BCR 16 Temperature: 28 Intermediate Aggregate: 154,440 Ambient Range: 96 OF BCR 17 Concrete Range: 102 OF Fine Aggregate: 5,470 Slump Range (inches): 2.0 Admixtures: H Weather Conditions: Partly Cloudy I Time Started: 1:00 PM 2 Test Methods Utilized Time Completed: 4:00 PM ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Sample Air Content (%): 3.0 Added Water: 0 Gallons Total Cubic Yards Placed: 12 D,.....:. A c...o__1, if 1— ice„ ir, ). 'AAnn Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.ln.) Remarks BCR 14 3 6/22/15 108,760 3,850 BCR 15 7 6/26/15 132,820 4,700 BCR 16 2.0 28 7/18/15 154,440 5,460 BCR 17 28 7/18/15 154,760 5,470 BCR 18 H Test Methods Utilized Fracture Regular Cylinders Made By: BT ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution: cc: Mr. Rick Odell - City of Coppell via E-mail: Roden ,coppelltx.gov Mr. Michelle Matunas - City of Coppell via Email: mmatunas(a)coppelltx.gov Mr. George Marshall - City of Coppell via Email: gmarshalla,coppelltx.gov Mr. Robert Caudill - Tiseo Paving via Email: rcaudill(cDtiseopaving.com C.F.F. Cnnenitants. Inc. TBPE Firm: F-3212 Reviewed All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. G I • GEOTECHNICAL ENGINEERING E I • ENVIRONMENTAL CONSULTING E I • CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive 0 Dallas, Texas 75229 0 (214) 352-5433 • Fax (214) 352-6972 REPORT OF CONCRETE MIX OBSERVATION Report Date: August 18, 2015 Date Concrete Placed: August 7, 2015 Standard 6"x12" Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Bethel & Coppell Road Concrete Report No.: 08 Contractor: Iowa Bridge & Culvert LC Project No.: 215-140 Concrete Supplier and Plant: LMC 961 Location of Placement: Box Culvert Wing Wall MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 1701 Time Sample Batched: 12:47 PM Cement: Time Sampled: 1:26 PM Remarks Sample Location: Culvert Wing Wall Fly Ash: Truck / Ticket No: 1054/63705988 Coarse Aggregate: Temperature: BCR 35 Intermediate Aggregate: Ambient Range: 100 °F Fine Aggregate: Concrete Range: 100 °F BCR 36 Slump Range (inches): 2.0 Admixtures: Weather Conditions: Clear I Time Started: 12:00 PM 2 Time Completed: 3:00 PM Sample Air Content (%): 5.0 Added Water: 0 Gallons Total Cubic Yards Placed: 8 Renttirt-d Ctrenoth (l.hs /sn in _1' 3.600 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.ln.) Remarks BCR 34 3 8/10/15 140,600 4,970 BCR 35 7 8/14/15 149,900 5,300 BCR 36 2.0 28 9/4/15 BCR 37 28 9/4/15 BCR 38 H Test Methods Utilized Fracture Regular Cylinders Made By: BT ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution: cc: Mr. Rick Odell - City of Coppell via E-mail: RodellAcoppelltx.gov Mr. Michelle Matunas - City of Coppell via Email: mmatunas(a coppelltmov Mr. George Marshall - City of Coppell via Email: gmarshallRmcoppelltx.gov Mr. Robert Caudill - Tiseo Paving via Email: rcaudill r,tiseopaving.com GEE Consultants. Inc. TBPE Firm: F-3212 Reviewed bv: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. G I • GEOTECHNICAL ENGINEERING E • ENVIRONMENTAL CONSULTING E I • CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive 0 Dallas, Texas 75229 0 (214) 352-5433 0 Fax (214) 352-6972 REPORT OF CONCRETE MIX OBSERVATION Report Date: August 18, 2015 Date Concrete Placed: Client: City of Coppell Project: Bethel & Coppell Road Contractor: Iowa Bridge & Culvert LC Concrete Supplier and Plant: LMC 952 Location of Placement: Box Culvert Extension August 14, 2015 Standard 6"x12" Cylinders Cylinder Cross-sectional Area: 28.27 Square Inches Concrete Report No.: 09 Project No.: 215-140 MATERIALS Source / SSD Batch Wts. Description (Lbs/CuYd) OBSERVATION DATA Date Tested Mix Number: 1701 Time Sample Batched: 1:08 PM 6SK Time Sampled: 2:20 PM Cement: Sample Location: South End of Culvert Fly Ash: 8/21/15 Extension Coarse Aggregate: BCR 41 Truck / Ticket No: 9140/62985700 Intermediate Aggregate: Temperature: BCR 42 Ambient Range: 95 OF Fine Aggregate: Concrete Range: 90 OF Admixtures: I i Slump Range (inches): 4.5 1 Weather Conditions: Partly Cloudy Cylinders Made By: RB ASTM C-31, C-39, C-143 Time Started: 12:30 PM 2 Time Completed: 4:00 PM Added Water: 0 Gallons Sample Air Content (%): 4.0 Total Cubic Yards Placed: 19 D- ­ ;,_A Q--4, /1 by /en in 1• i rinn Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.ln.) Remarks BCR 39 3 8/17/15 105,560 3,730 BCR 40 7 8/21/15 BCR 41 4.5 28 9/11/15 BCR 42 28 9/11/15 BCR 43 I i Test Methods Utilized Fracture Regular Cylinders Made By: RB ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution: cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell(a coI)pelltx.gov Mr. Michelle Matunas - City of Coppell via Email: mmatunas(@coppelltx.gov Mr. George Marshall - City of Coppell via Email: v_marshall(�bcoppelltx.gov Mr. Robert Caudill - Tiseo Paving via Email: rcaudillatiseopaving.com I -up int._ TRPF Firm: F-321.2 Reviewed All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.