Loading...
Coppell Ind 2- LR150608 2 4 2 4 S T U T Z D R .  S U I T E 4 0 0  D A L L A S , T X 7 5 2 3 5  T E L [2 1 4 ] 3 5 0 5 6 0 0  F AX [2 1 4 ] 3 5 0 0 0 1 9 CONCRETE CYLINDER TEST REPORT Tradepoint Business Park Building 1B Expansion 980 W. Bethel Road Coppell, Texas REPORTED TO: Hillwood Investment Properties 3090 Olive Street, Suite 300 Dallas, Texas 75219 ATTN: Mr. Mike Jones REPORT NO. 39 REG PROJECT NO. 20346 SAMPLE DATE: 06-08-15 TECHNICIAN: B. Grant PAGE: 1 of 2 CONTRACTOR: Hillwood Construction Services Location of Sample Set Number Location Quantity Represented (c.y.) 1 Slab: D.1-1.8 50/600 2 Slab: E.5-3.4 160/600 3 Slab: E.8-4.9 280/600 4 Slab: D.3-6.1 360/600 5 Slab: D-6.8 430/600 6 Slab: E.5-7.2 510/600 Design Information Source of Concrete Mix Identification Specified Strength (psi) Argos 1060PPU 4000 Test Results Set No. Cylinder ID Date Tested Age @ Test Total Load (lbs.) Compressive Strength (psi) Average Strength (psi) 1 5630 06-15-15 7 54310 4320 5630 07-06-15 28 5630 07-06-15 28 5630 07-06-15 28 5630 Hold H 2 5631 06-15-15 7 63710 5070 5631 07-06-15 28 5631 07-06-15 28 5631 07-06-15 28 5631 Hold H 3 5632 06-15-15 7 58940 4690 5632 07-06-15 28 5632 07-06-15 28 5632 07-06-15 28 5632 Hold H REPORT NO. 39 REG PROJECT NO. 20346 SAMPLE DATE: 06-08-15 PAGE: 2 of 2 Test Results Set No. Cylinder ID Date Tested Age @ Test Total Load (lbs.) Compressive Strength (psi) Average Strength (psi) 4 5633 06-15-15 7 57710 4590 5633 07-06-15 28 5633 07-06-15 28 5633 07-06-15 28 5633 Hold H 5 5634 06-15-15 7 49280 3920 5634 07-06-15 28 5634 07-06-15 28 5634 07-06-15 28 5634 Hold H 6 5635 06-15-15 7 56560 4500 5635 07-06-15 28 5635 07-06-15 28 5635 07-06-15 28 5635 Hold H Cylinder Data Set No. Cylinder ID Slump (inches) Time of Sample Air Temp. (°F) Concrete Temp. (°F) Air Entrainment (%) Unit Weight (lbs/ft3) Ticket Number 1 5630 3.5 2:30 AM 76 86 1.5 147.0 1623401 2 5631 3.5 4:00 AM 75 88 1.4 146.8 1623444 3 5632 3.75 5:50 AM 77 85 1.4 146.9 1623516 4 5633 4.25 6:45 AM 75 84 1.3 146.8 1623568 5 5634 4.75 7:40 AM 76 89 1.1 147.5 1623657 6 5635 4.0 9:00 AM 78 92 1.4 146.9 1623782 Note: (1) Concrete was sampled in accordance with ASTM C-31 (2) Concrete cylinders were tested in accordance with ASTM C-39 E-Mail Distribution: (1) Hillwood Investment Properties/ Mr. Mike Jones (1) Hillwood Investment Properties/ Ms. Sandy Carroll (1) Hillwood Construction Services/ Mr. David Grayson (1) Hillwood Construction Services/ Mr. Tom McConnell (1) City of Coppell/Mr. O’Dell Submitted by: REED ENGINEERING GROUP, LTD. Registration Number F-3114 Bill W oolwine Sr. Manager, CMT CT/cn