Loading...
Coppell Ind 2- LR150519 2424 STUTZ DR.  SUITE 400  DALLAS, TX 75235  TEL [214] 350 5600  FAX [214] 350 0019 CONCRETE CYLINDER TEST REPORT Tradepoint Business Park Building 1B Expansion 980 W. Bethel Road Coppell, Texas REPORTED TO: Hillwood Investment Properties 3090 Olive Street, Suite 300 Dallas, Texas 75219 ATTN: Mr. Mike Jones REPORT NO. 29 REG PROJECT NO. 20346 SAMPLE DATE: 05-19-15 TECHNICIAN: J. Watson PAGE: 1 of 1 CONTRACTOR: Hillwood Construction Services Location of Sample Set Number Location Quantity Represented (c.y.) 1 Piers: F-6, G-6 and H-6 10/80 Design Information Source of Concrete Mix Identification Specified Strength (psi) Argos 2554 3000 Test Results Set No. Cylinder ID Date Tested Age @ Test Total Load (lbs.) Compressive Strength (psi) Average Strength (psi) 1 5222 05-26-15 7 51050 4060 5222 06-16-15 28 61440 4890 5222 06-16-15 28 63060 5020 5222 06-16-15 28 63470 5050 4990 5222 Hold H Cylinder Data Set No. Cylinder ID Slump (inches) Time of Sample Air Temp. (°F) Concrete Temp. (°F) Air Entrainment (%) Unit Weight (lbs/ft3) Ticket Number 1 5222 5.0 9:50 AM 77 86 1.0 146.8 1614915 Note: (1) Concrete was sampled in accordance with ASTM C-31 (2) Concrete cylinders were tested in accordance with ASTM C-39 E-Mail Distribution: (1) Hillwood Investment Properties/ Mr. Mike Jones (1) Hillwood Investment Properties/ Ms. Sandy Carroll (1) Hillwood Construction Services/ Mr. David Grayson (1) Hillwood Construction Services/ Mr. Tom McConnell (1) City of Coppell/Mr. O’Dell Submitted by: REED ENGINEERING GROUP, LTD. Registration Number F-3114 Bill Woolwine Sr. Manager, CMT CT/cn