Coppell Ind 2- LR150507
2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019
CONCRETE CYLINDER TEST REPORT
Tradepoint Business Park Building 1B Expansion
980 W. Bethel Road
Coppell, Texas
REPORTED TO: Hillwood Investment Properties
3090 Olive Street, Suite 300
Dallas, Texas 75219
ATTN: Mr. Mike Jones
REPORT NO. 23
REG PROJECT NO. 20346
SAMPLE DATE: 05-07-15
TECHNICIAN: J. Watson
PAGE: 1 of 1
CONTRACTOR: Hillwood Construction Services
Location of Sample
Set Number Location Quantity Represented (c.y.)
1 Piers: E.9-1, H.6-1 and J.2-1 10/100
Design Information
Source of Concrete Mix Identification Specified Strength (psi)
Argos 2554 3000
Test Results
Set
No.
Cylinder
ID
Date Tested
Age @
Test
Total Load
(lbs.)
Compressive
Strength (psi)
Average Strength
(psi)
1 5071 05-14-15 7 51410 4090
5071 06-04-15 28 67990 5410
5071 06-04-15 28 64230 5110
5071 06-04-15 28 70000 5570 5360
5071 Hold H
Cylinder Data
Set
No.
Cylinder
ID
Slump
(inches)
Time of
Sample
Air
Temp.
(°F)
Concrete
Temp.
(°F)
Air
Entrainment
(%)
Unit
Weight
(lbs/ft3)
Ticket
Number
1 5071 6.0 11:08 AM 74 82 1.5 146.8 1011441
Note: (1) Concrete was sampled in accordance with ASTM C-31
(2) Concrete cylinders were tested in accordance with ASTM C-39
E-Mail
Distribution: (1) Hillwood Investment Properties/
Mr. Mike Jones
(1) Hillwood Investment Properties/
Ms. Sandy Carroll
(1) Hillwood Construction Services/
Mr. David Grayson
(1) Hillwood Construction Services/
Mr. Tom McConnell
(1) City of Coppell/Mr. O’Dell
Submitted by:
REED ENGINEERING GROUP, LTD.
Registration Number F-3114
Bill Woolwine
Sr. Manager, CMT
CT/cn