Loading...
Eckerd's-LR 990218 G ° GEOTECHNICAL ENGINEI:I<ING E GEE Consultants, Inc. E ° CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive · Dallas, Texas 75229 ° (214) 352-5433 · Fax (214) 352-6972 REPORT OF GROUT MIX INSPECTION Report Date: February. 18, 1999 Date Concrete Placed: Jalluary 21, 1999 Standard 6"x12" Client: North American Properties-SW Area 28.27 Square Inches Pro]ect: Eckerds- Coppell Grout Report No. I Contractor: C.A.Walker Report No: 298-0412 Grout Supplier and Plant: On-Site Location or' Placement: Core fill INSPECTION DATA Time Sample Batched: 10:30 am Time Sampled: 10:40 am Sample Locauon: Core Fill - SW comer of wail Temperature: Ambient Range: 70*F Concrete Range: 73°F Weather Conditions: Slump Range l inches~: NiA Time Started: 09:30 am Time Completed: 12:00 pm Sample A~r Content( ~ '~: N/A Total Cubic Yards Placed: N;A Reqmred Strength iLbs.;sq.in.'l:2,000 Specu~en Age Date Total Load Compressive Strength Remark~ NumBer ~ Days ) 'rested , Lbs. ) ~ Lbs ./Sq. I n. } ECK 1 7 01/28/99 127,300 4,500 ECK 2 28 02/18/99 170,460+ 6,030+ ECK 3 28 02/18/99 170,640 + 6,040 + ECK 4 H HOLD Test Me:boos gltllzexl Fracture Regular ASTM C-31. C-39. C-~3 iUnless Nord Otherwise~ Cylinders Made By: RB Remarks and/or Distribution: cc: Mr. John Maggiore - North American Properties-SW Mr. Lance Lilly - Richmond Group Architecture & Planning Mr. GaD' Stokes - C.A. Walker Construction Mr. Larw Davis - Ci.ty of Coppell Mr. Lee Stone - CiD' of Coppell ~ Con~ttltantH, Thc. lav~eve~ by: All :.et:ere and reporus are for --he exolus:.ve use pt the claenr. :o whom :hey area~lr~ssed and shall not be reprod'aced wLr. hour. :.he full approval GEE Consuir-ancs, Inc. The use of our name must receive our prior wr/tten approval. Our letters and reports apply only Co the sample :esced and/or inspected and are not ~.ecessarLly indicat:ve of '-he quanti:ies of apparently identical or similar products.