Eckerd's-LR 990218 G ° GEOTECHNICAL ENGINEI:I<ING
E GEE Consultants,
Inc.
E ° CONSTRUCTION MATERIALS TESTING
10046 Monroe Drive · Dallas, Texas 75229 ° (214) 352-5433 · Fax (214) 352-6972
REPORT OF GROUT MIX INSPECTION
Report Date: February. 18, 1999 Date Concrete Placed: Jalluary 21, 1999 Standard 6"x12"
Client: North American Properties-SW Area 28.27 Square Inches
Pro]ect: Eckerds- Coppell Grout Report No. I
Contractor: C.A.Walker Report No: 298-0412
Grout Supplier and Plant: On-Site
Location or' Placement: Core fill
INSPECTION DATA
Time Sample Batched: 10:30 am
Time Sampled: 10:40 am
Sample Locauon: Core Fill - SW comer of wail
Temperature:
Ambient Range: 70*F
Concrete Range: 73°F
Weather Conditions:
Slump Range l inches~: NiA
Time Started: 09:30 am
Time Completed: 12:00 pm
Sample A~r Content( ~ '~: N/A
Total Cubic Yards Placed: N;A
Reqmred Strength iLbs.;sq.in.'l:2,000
Specu~en Age Date Total Load Compressive Strength Remark~
NumBer ~ Days ) 'rested , Lbs. ) ~ Lbs ./Sq. I n. }
ECK 1 7 01/28/99 127,300 4,500
ECK 2 28 02/18/99 170,460+ 6,030+
ECK 3 28 02/18/99 170,640 + 6,040 +
ECK 4 H HOLD
Test Me:boos gltllzexl Fracture Regular
ASTM C-31. C-39. C-~3 iUnless Nord Otherwise~ Cylinders Made By: RB
Remarks and/or Distribution:
cc: Mr. John Maggiore - North American Properties-SW
Mr. Lance Lilly - Richmond Group Architecture & Planning
Mr. GaD' Stokes - C.A. Walker Construction
Mr. Larw Davis - Ci.ty of Coppell
Mr. Lee Stone - CiD' of Coppell
~ Con~ttltantH, Thc. lav~eve~ by:
All :.et:ere and reporus are for --he exolus:.ve use pt the claenr. :o whom :hey area~lr~ssed and shall not be reprod'aced wLr. hour. :.he full approval
GEE Consuir-ancs, Inc. The use of our name must receive our prior wr/tten approval. Our letters and reports apply only Co the sample :esced and/or
inspected and are not ~.ecessarLly indicat:ve of '-he quanti:ies of apparently identical or similar products.