Eckerd's-LR 990217 G · GEOTECHNICAL ENGINEERING
E GEE Consultants,
Inc.
E · CONSTRUCTION MATERIALS TESTING
10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972
REPORT OF CONCRETE MIX INSPECTION
Report Date: February. 17, 1999 Date Concrete Placed: Februax3.' lO. 1999 Standard 6"xt2"
Client: North American Properties-SW Area 2,',1.27 Square Inches
Project: Eckerds - Coppell Concrete Report No.: ~ 3
Con,~ractor: C.A. Walker Project No.: 298-0412
Concrete Supplier and Plant: TXI Plant/#31
Location of Placement: Sidewalk
MATERIALS ~ ..... ~s~ ~,c. ~,,. ENSPECTION DATA
Description , Lbs.'CuYd~
Mix Number: 8203 Time Sample Batched: 07:50 am
Cement: Time Sampled: 09:00 am
Fl.',' Ash: Sample Locauon: 18' E. & 2' N. of NW comer of building
Truck/Ticket No: 481/1236279
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 70°F
Fine Aggregate: Concrete Range: 7! °F
Admixtures: Slump Range (inches): 6"
Weather Condmons: Cloudy
' Time Started: 07:30 am
2 Time Completed: 10:00 am
Added Water: 10 Gallons Sample Air Content ~% ): 2 !/, %
Total Cubic Yards Placed: I0
Required Strength ~ Lbs.. sq.in. ~: 3.000
ECK 44 5 02/15/99 55,400 1.960
ECK 45 7 02/17~99 68,800 2.430
ECK 46 6" 28 03/10/99
ECK 47 28 03/10/99
ECK 48 H HOLD
-~STM C-3;.C-39.C-'.43 ,Unless Noted Otherw se) Cylinders Made By: R]~
Remarks and;or Distribution:
cc: Mr. John Maggiore - North American Properties -SW
Mr. Lance Liilv- Richmond Group Architecture & Planning
Mr. Gar5,' Stokes - C.A. Walker Construction
Mr. Lee Stone - City of Coppell
Mr. Larry Davis -Citv of Coppell