Loading...
Eckerd's-LR 990217 G · GEOTECHNICAL ENGINEERING E GEE Consultants, Inc. E · CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: February. 17, 1999 Date Concrete Placed: Februax3.' lO. 1999 Standard 6"xt2" Client: North American Properties-SW Area 2,',1.27 Square Inches Project: Eckerds - Coppell Concrete Report No.: ~ 3 Con,~ractor: C.A. Walker Project No.: 298-0412 Concrete Supplier and Plant: TXI Plant/#31 Location of Placement: Sidewalk MATERIALS ~ ..... ~s~ ~,c. ~,,. ENSPECTION DATA Description , Lbs.'CuYd~ Mix Number: 8203 Time Sample Batched: 07:50 am Cement: Time Sampled: 09:00 am Fl.',' Ash: Sample Locauon: 18' E. & 2' N. of NW comer of building Truck/Ticket No: 481/1236279 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 70°F Fine Aggregate: Concrete Range: 7! °F Admixtures: Slump Range (inches): 6" Weather Condmons: Cloudy ' Time Started: 07:30 am 2 Time Completed: 10:00 am Added Water: 10 Gallons Sample Air Content ~% ): 2 !/, % Total Cubic Yards Placed: I0 Required Strength ~ Lbs.. sq.in. ~: 3.000 ECK 44 5 02/15/99 55,400 1.960 ECK 45 7 02/17~99 68,800 2.430 ECK 46 6" 28 03/10/99 ECK 47 28 03/10/99 ECK 48 H HOLD -~STM C-3;.C-39.C-'.43 ,Unless Noted Otherw se) Cylinders Made By: R]~ Remarks and;or Distribution: cc: Mr. John Maggiore - North American Properties -SW Mr. Lance Liilv- Richmond Group Architecture & Planning Mr. Gar5,' Stokes - C.A. Walker Construction Mr. Lee Stone - City of Coppell Mr. Larry Davis -Citv of Coppell