WA1005- CS110727MEE ETING
PROJE
NAME
RECOR
DATE:
LOCAT
ATTEN
The follo
notify us
ITEM
1.
2.
3.
4.
5.
MINUT
ECT:
E OF MEETI
RDED BY:
:
TION:
NDEES:
owing reflects
s within five w
M
Impact Fe
‐ F
s
‐ T
t
‐ F
p
‐ F
‐ T
o
‐ F
‐ F
a
Water De
‐ T
t
‐ F
‐ T
Wastewa
Model Up
‐ S
‐ R
‐ T
y
t
‐ R
‐ F
V
Next Step
‐ W
‐ D
‐ T
S
‐ S
TES
Wate
NG: Land
Study
Jessic
July 1
Copp
City o
FNI: J
our understan
working days, w
ee Land Use A
FNI will updat
ay 2021 inste
The City will se
he number of
FNI will updat
populations in
FNI will send a
The City assum
occupation ra
FNI will updat
FNI will add ad
apartments.
emand Projec
The City has n
hey changed
FNI will evalua
The City will se
ater Load Proj
pdates
Siphon at Beth
Remove lines
The Star Leaf
years. The loc
rying to nego
Remove lift st
FNI will send a
Village Parkwa
ps
Water and wa
Develop wate
Traffic counts
September.
Schedule a me
er, Wastewat
Use Assump
y
ca Vassar
14, 2011
pell City Hall
of Coppell: Ke
Jessica Brown
nding of the ite
we will assume
DESCRI
Assumptions
e the legend
ead of Buildou
end a list of a
f units.
e the populat
n the apartme
an updated m
mes 2.7 peop
te.
e the land us
dditional peo
ctions
ot had a max
watering day
ate the reside
end revised h
jections
hel Road was
with other ow
Pump Station
cation is still t
otiate for prop
ation at MacA
a zoom in of t
ay to verify co
astewater sys
r and wastew
will take plac
eeting to revi
ter and Roadw
tions for Wat
en Griffin, Ge
n, Tricia Hatle
ems discussed
e that you are
IPTION
of the Popula
ut.
all the apartm
tions by TSZ t
ents.
map of the po
le per unit an
e map along
ple in 2021 to
ximum day ov
ys.
ential per cap
historical wate
removed.
wners from th
n will be desig
to be determ
perty south o
Arthur Boulev
the 16‐ and 3
onnectivity.
tem modelin
water CIPs.
ce in late Aug
ew CIPs in ea
way Impact Fe
ter/Wastewa
eorge Marsha
ey, Jessica Va
during the sub
in agreement
ation by TSZ m
ments in the C
to include
pulations by
nd a 96.3%
Denton Tap R
o TSZ #40338
ver 17 MGD s
pita.
er usage data
he wastewate
gned in the ne
ined, as the C
of Beltline Roa
vard and Belt
0‐inch lines e
g.
gust or early
arly October.
ee Update
ter/Roadway
ll, Matt Steer
ssar
bject meeting.
with our unde
P
map to
City with
TSZ.
Road.
8 for the
Je
since
a.
Je
Je
er map.
ext 10
City is
ad.
t Line.
east of
Je
Je
y Impact Fee
r
. If you do not
erstanding.
PRESENTER
essica Brown
essica Brown
essica Brown
essica Brown
essica Brown
R
Land Use Assumptions for Water/Wastewater/Roadway Impact Fee Study
7/14/2011
Page 2 of 2
ACTION ITEMS
WHAT WHO
1. FNI will send a revised land use map with updated populations and commercial
acres. FNI
2. FNI will send revised water demand projections. FNI
3. FNI will send a zoom in of the 16‐ and 30‐inch lines east of Village Parkway to
verify connectivity. FNI
4. The City will send the location of apartments in the City (received 7/15/2011). City of Coppell
5. The City will send revised historical water usage data. City of Coppell