Loading...
WA1005- CS110727MEE  ETING PROJE NAME RECOR DATE: LOCAT ATTEN   The follo notify us ITEM 1. 2. 3. 4. 5. MINUT ECT: E OF MEETI RDED BY: : TION: NDEES: owing reflects  s within five w M   Impact Fe ‐ F s ‐ T t ‐ F p ‐ F ‐ T o ‐ F ‐ F a   Water De ‐ T t ‐ F ‐ T  Wastewa   Model Up ‐ S ‐ R ‐ T y t ‐ R ‐ F V   Next Step ‐ W ‐ D ‐ T S ‐ S TES Wate NG: Land Study Jessic July 1 Copp City o FNI: J our understan working days, w ee Land Use A FNI will updat ay 2021 inste The City will se he number of FNI will updat populations in FNI will send a The City assum occupation ra FNI will updat FNI will add ad apartments.  emand Projec The City has n hey changed  FNI will evalua The City will se ater Load Proj pdates  Siphon at Beth Remove lines  The Star Leaf  years.  The loc rying to nego Remove lift st FNI will send a Village Parkwa ps  Water and wa Develop wate Traffic counts  September.  Schedule a me er, Wastewat  Use Assump y  ca Vassar  14, 2011  pell City Hall of Coppell: Ke Jessica Brown nding of the ite we will assume DESCRI Assumptions e the legend  ead of Buildou end a list of a f units.  e the populat n the apartme an updated m mes 2.7 peop te.  e the land us dditional peo ctions  ot had a max watering day ate the reside end revised h jections   hel Road was with other ow Pump Station cation is still t otiate for prop ation at MacA a zoom in of t ay to verify co astewater sys r and wastew will take plac eeting to revi ter and Roadw tions for Wat en Griffin, Ge n, Tricia Hatle ems discussed  e that you are  IPTION of the Popula ut.  all the apartm tions by TSZ t ents.  map of the po le per unit an e map along  ple in 2021 to ximum day ov ys.   ential per cap historical wate  removed.  wners from th n will be desig to be determ perty south o Arthur Boulev the 16‐ and 3 onnectivity.  tem modelin water CIPs.  ce in late Aug ew CIPs in ea way Impact Fe ter/Wastewa eorge Marsha ey, Jessica Va during the sub in agreement  ation by TSZ m ments in the C to include  pulations by  nd a 96.3%  Denton Tap R o TSZ #40338 ver 17 MGD s pita.  er usage data he wastewate gned in the ne ined, as the C of Beltline Roa vard and Belt 0‐inch lines e g.  gust or early  arly October. ee Update  ter/Roadway ll, Matt Steer ssar  bject meeting. with our unde P map to  City with  TSZ.   Road.  8 for the  Je since  a.   Je Je er map.  ext 10  City is  ad.   t Line.  east of  Je Je y Impact Fee  r  . If you do not  erstanding.  PRESENTER essica Brown essica Brown essica Brown essica Brown essica Brown R Land Use Assumptions for Water/Wastewater/Roadway Impact Fee Study  7/14/2011  Page 2 of 2      ACTION ITEMS WHAT WHO 1. FNI will send a revised land use map with updated populations and commercial  acres. FNI  2. FNI will send revised water demand projections. FNI  3. FNI will send a zoom in of the 16‐ and 30‐inch lines east of Village Parkway to  verify connectivity. FNI  4. The City will send the location of apartments in the City (received 7/15/2011). City of Coppell  5. The City will send revised historical water usage data. City of Coppell