Loading...
WA1005- CS110727 (2) ST   PROJEC PROJEC TO: FROM: CC: PROJECT  U  La  A  Li  H  U  M  Li  U C  W  D   UPCOMIN  Tr  Sc PROJECT  P TATUS CT NO.: CT: T UPDATES ndeveloped L and Use data  o Undev o Future o NCTCO o Land u s‐built drawin ist of recently istorical Wat tility billing d Meeting on La ist of multi‐fa pdate existin omplete  Water and was evelop water NG TASKS A raffic counts  chedule a me T SCHEDULE roject is on sc S REPO CPL11254   Water, Was Ken Griffin,  Jessica Brow Tricia Hatley Land Use map received Jun veloped reside e land use ma OG zoning lay use inventory  ngs of recent y completed p er and Waste data base rece nd Use Assum amily units rec ng water and w stewater syst r and wastew AND DELIVER will take plac eeting to revie E chedule  ORT tewater and  George Mars wn  y, Jessica Vass ps received Ju e 21, 2011  ential and no ap  yer  shapefile  ly completed projects recei ewater Usage eived July 12, mptions July 1 ceived July 15 wastewater m tem analysis‐ water CIPs‐ On RABLES ce in late Augu ew CIPs in ea Roadway Imp shall  sar  une 21, 2011 onresidential a  projects dow ived July 8, 20 e received July  2011  14, 2011  5, 2011  models to inc Ongoing   ngoing  ust or early Se rly October  D pact Fee Upd areas  wnloaded from 011  y 8, 2011  clude recently eptember  DATE: 7/2 ate  m FTP July 1,  y constructed 20/2011  2011   projects‐