REPORT OF CONCRETE MIX INSPECTION
Report Date: Februax3, 1 l, 1999 Da~ Concrete Placed: February. 3, 1999 Standard 6"x12'
Client: North American Properties-SW Area 28.27 Square Inches
ProJect: Eckerds - Coppell Concrete Report No.: I0
Contractor: C.A. Walker Project No.: 298-0412
Concrete Supplier and Plant: TMI Plaint/#41
Location of Placement: Paving
MATERIALS .',ou,~,; ssn Ba,ce,~,,. INSPECTION DATA
Descr~otion { Lbs,'CuYd)
Mix Number: 8203 Time Sample Batched: 09:40 am
Cement: Time Sampled: 10:50 am
Fly Ash: Sample Location: -,tO' N. & 40' E. of NW comer
Track/Ticket No: 835/1230266
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 65'F
Fine Aggregate: Concrete Range: 67°F
Admixtures: Slump Range ¢mches): 6"
I Weather Condmons: Clear
Time Started: 09:00 am
- Time Completed: 02:00 pm
Added Water: 15 Gallons Sample Air Content (%): 1~
Total Cubic Yards Placed: 40
Required Strength ~Lbs./sq.in.}: 3.000
ECK 36 7 02/10/99 61.840 2.190
ECK 37 28 03/03/99
6"
ECK 38 28 03/03/99
ECK 39 H HOLD
-XSTM C-31.C-39.C-143 .L'nle$$ Noted Otherwise! Cylinders Made By: SM
Remarks and/or Distribution:
cc: Mr. John Maggiore - North American Properties -SW
Mr. Lance Lilly - Richmond Group Architecture & Planning
Mr. Gary Stokes - C.A. Walker Construction
Mr. Lee Stone - City of Coppell
Mr. Larry Davis - City of Coppell
All let~rs and reports arc fo*' tl~¢ exclu.swe ~ ot' the client :o whom ,,hey are 3ddressed and shall n(x be reprod4t w~thou~ the full approval o( GEE Comulmnts. Inc. The usa of o~r :xamc muat recaiv=
<,')ur prior wnnen approval. Our Ict~rs and repom apply only to Ibe sample tested aM/or ;repcct~ and arc n~l necessarily indicauve of the quanuties oi apparently idenucal or simdar products.