Loading...
Eckerd's-LR 990211I G · GEOTECHNICAL ENGINEERING E -ENVIRONMENTAL CONSULTING GEE Consultants, Inc. E· CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 o Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: Februax3, 1 l, 1999 Da~ Concrete Placed: February. 3, 1999 Standard 6"x12' Client: North American Properties-SW Area 28.27 Square Inches ProJect: Eckerds - Coppell Concrete Report No.: I0 Contractor: C.A. Walker Project No.: 298-0412 Concrete Supplier and Plant: TMI Plaint/#41 Location of Placement: Paving MATERIALS .',ou,~,; ssn Ba,ce,~,,. INSPECTION DATA Descr~otion { Lbs,'CuYd) Mix Number: 8203 Time Sample Batched: 09:40 am Cement: Time Sampled: 10:50 am Fly Ash: Sample Location: -,tO' N. & 40' E. of NW comer Track/Ticket No: 835/1230266 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 65'F Fine Aggregate: Concrete Range: 67°F Admixtures: Slump Range ¢mches): 6" I Weather Condmons: Clear Time Started: 09:00 am - Time Completed: 02:00 pm Added Water: 15 Gallons Sample Air Content (%): 1~ Total Cubic Yards Placed: 40 Required Strength ~Lbs./sq.in.}: 3.000 ECK 36 7 02/10/99 61.840 2.190 ECK 37 28 03/03/99 6" ECK 38 28 03/03/99 ECK 39 H HOLD -XSTM C-31.C-39.C-143 .L'nle$$ Noted Otherwise! Cylinders Made By: SM Remarks and/or Distribution: cc: Mr. John Maggiore - North American Properties -SW Mr. Lance Lilly - Richmond Group Architecture & Planning Mr. Gary Stokes - C.A. Walker Construction Mr. Lee Stone - City of Coppell Mr. Larry Davis - City of Coppell All let~rs and reports arc fo*' tl~¢ exclu.swe ~ ot' the client :o whom ,,hey are 3ddressed and shall n(x be reprod4t w~thou~ the full approval o( GEE Comulmnts. Inc. The usa of o~r :xamc muat recaiv= <,')ur prior wnnen approval. Our Ict~rs and repom apply only to Ibe sample tested aM/or ;repcct~ and arc n~l necessarily indicauve of the quanuties oi apparently idenucal or simdar products.