Loading...
WA1005- CS110610MEE  ETING   PROJE NAME RECOR DATE: LOCAT ATTEN   The follo notify us ITEM 1. 2. 3. 4. 5. 6. 7. 8. MINUT ECT: E OF MEETI RDED BY: : TION: NDEES: owing reflects  s within five w M  Introduct  Review S   Review S ‐ O ‐ T ‐ F  Project C ‐ M   Review D ‐ T in ‐ N ‐ U a   Land Use ‐ T e ‐ A ‐ L  Traffic Co ‐ T   Projects C ‐ W u ‐ W 1 ‐ C ‐ R u s is 6 f TES Wate NG: Kicko Jessic May  Copp City o FNI: J our understan working days, w tion of Projec cope of Work chedule  Only one ordin The CIAC will m FNI will provid ommunicatio Monthly One  Data Request  The City recen ncluding futu New Land Use Updated shap and billing dat  Assumptions The City has se ended up bein A hotel is plan Land use has b ounts  The City will se Completed si Water Project under design.  Wastewater P 14 are comple City does not  Roadway: 1, 5 undivided, Pro outhbound a s a bottleneck 6 and 7 are no unding for th er, Wastewat off Meeting  ca Vassar  31, 2011  pell City Hall of Coppell: Ke Jessica Brown nding of the ite we will assume DESCRI ct Team  k  nance readin meet before t de an updated on  Page Reports Memorandum ntly adopted a re land use.  e shapefiles a pefiles for wat ta will be sent s  een a trend w ng call center nned in an old been updated end the data  nce 2005 Stu ts: 8, 11 and 1 Projects: 10, 1 ete.  plan to build  5, and 9 are co oject 10 is 4 la nd 2 northbo k because it h ot done, but t em and will o ter and Roadw en Griffin, Ge n, Tricia Hatle ems discussed  e that you are  IPTION g is required. the Final Rep d schedule to s will be sent. m  a new compr re available. ter, wastewat t.  where some in s/ office use.  d “commercia d to include m from the exis dy  12 are comple 11, 12a, 12b, a Water Projec omplete.  Pro anes, and Pro ound). The Cit has not been  the City is rec only pay 20%. way Impact Fe eorge Marsha ey, Jessica Va during the sub in agreement  .  port is availab o the City.   .  ehensive plan ter, ground c ndustrial area   al freeway” ar mixed use.  sting location ete.  Project 1 a portion of 1 ct 9.  oject 11 is 2 la oject 13 is 5 la ty asked if Pro completed.  P ceiving a lot o .  ee Update  ll  ssar  bject meeting. with our unde P Je Je ble.   Je Je n,  ontours  Je a has  rea.  Je ns. Tr 13 is  13 and  anes  anes (3  oject 10  Projects  of  C . If you do not  erstanding.  PRESENTER essica Brown essica Brown essica Brown essica Brown essica Brown essica Brown ricia Hatley  ity of Coppell R l  Water, Wastewater and Roadway Impact Fee Update Kickoff Meeting  5/31/2011  Page 2 of 2    ITEM DESCRIPTION PRESENTER 9.   Other Information  ‐ The City is considering adding a new pressure plane due to  high pressure north of Village Parkway.  ‐ The Star Leaf Pump Station could be moved further south if  a proposed land deal occurs (near MacArthur/ Beltline).  ‐ The City is providing temporary wastewater service to  Northlake and will provide more information.   City of Coppell        ACTION ITEMS WHAT WHO 1. FNI will send an updated schedule. FNI  2. The City will send updated shapefiles for water, wastewater, contours, billing  data and land use. City of Coppell  3. The City will send data from the existing traffic count locations. City of Coppell  4. The City will verify the timing of the wastewater service for Northlake. City of Coppell