WA1005- CS110610MEE ETING
PROJE
NAME
RECOR
DATE:
LOCAT
ATTEN
The follo
notify us
ITEM
1.
2.
3.
4.
5.
6.
7.
8.
MINUT
ECT:
E OF MEETI
RDED BY:
:
TION:
NDEES:
owing reflects
s within five w
M
Introduct
Review S
Review S
‐ O
‐ T
‐ F
Project C
‐ M
Review D
‐ T
in
‐ N
‐ U
a
Land Use
‐ T
e
‐ A
‐ L
Traffic Co
‐ T
Projects C
‐ W
u
‐ W
1
‐ C
‐ R
u
s
is
6
f
TES
Wate
NG: Kicko
Jessic
May
Copp
City o
FNI: J
our understan
working days, w
tion of Projec
cope of Work
chedule
Only one ordin
The CIAC will m
FNI will provid
ommunicatio
Monthly One
Data Request
The City recen
ncluding futu
New Land Use
Updated shap
and billing dat
Assumptions
The City has se
ended up bein
A hotel is plan
Land use has b
ounts
The City will se
Completed si
Water Project
under design.
Wastewater P
14 are comple
City does not
Roadway: 1, 5
undivided, Pro
outhbound a
s a bottleneck
6 and 7 are no
unding for th
er, Wastewat
off Meeting
ca Vassar
31, 2011
pell City Hall
of Coppell: Ke
Jessica Brown
nding of the ite
we will assume
DESCRI
ct Team
k
nance readin
meet before t
de an updated
on
Page Reports
Memorandum
ntly adopted a
re land use.
e shapefiles a
pefiles for wat
ta will be sent
s
een a trend w
ng call center
nned in an old
been updated
end the data
nce 2005 Stu
ts: 8, 11 and 1
Projects: 10, 1
ete.
plan to build
5, and 9 are co
oject 10 is 4 la
nd 2 northbo
k because it h
ot done, but t
em and will o
ter and Roadw
en Griffin, Ge
n, Tricia Hatle
ems discussed
e that you are
IPTION
g is required.
the Final Rep
d schedule to
s will be sent.
m
a new compr
re available.
ter, wastewat
t.
where some in
s/ office use.
d “commercia
d to include m
from the exis
dy
12 are comple
11, 12a, 12b, a
Water Projec
omplete. Pro
anes, and Pro
ound). The Cit
has not been
the City is rec
only pay 20%.
way Impact Fe
eorge Marsha
ey, Jessica Va
during the sub
in agreement
.
port is availab
o the City.
.
ehensive plan
ter, ground c
ndustrial area
al freeway” ar
mixed use.
sting location
ete. Project 1
a portion of 1
ct 9.
oject 11 is 2 la
oject 13 is 5 la
ty asked if Pro
completed. P
ceiving a lot o
.
ee Update
ll
ssar
bject meeting.
with our unde
P
Je
Je
ble. Je
Je
n,
ontours
Je
a has
rea.
Je
ns. Tr
13 is
13 and
anes
anes (3
oject 10
Projects
of
C
. If you do not
erstanding.
PRESENTER
essica Brown
essica Brown
essica Brown
essica Brown
essica Brown
essica Brown
ricia Hatley
ity of Coppell
R
l
Water, Wastewater and Roadway Impact Fee Update Kickoff Meeting
5/31/2011
Page 2 of 2
ITEM DESCRIPTION PRESENTER
9.
Other Information
‐ The City is considering adding a new pressure plane due to
high pressure north of Village Parkway.
‐ The Star Leaf Pump Station could be moved further south if
a proposed land deal occurs (near MacArthur/ Beltline).
‐ The City is providing temporary wastewater service to
Northlake and will provide more information.
City of Coppell
ACTION ITEMS
WHAT WHO
1. FNI will send an updated schedule. FNI
2. The City will send updated shapefiles for water, wastewater, contours, billing
data and land use. City of Coppell
3. The City will send data from the existing traffic count locations. City of Coppell
4. The City will verify the timing of the wastewater service for Northlake. City of Coppell