November 17 2011
Mr George S Marshall PE Phn 972 304 3562
City of Coppell
Fax 972 304 3570
255 Parkway Blvd
Coppell Texas 75019
Re Denton Tap Sidewalk @ Railroad Crossing
Coppell Texas
Engineering Inspection Testing Services
AGG Proposal No P11 1117C
Dear Mr Marshall
Alliance Geotechnical Group AGG is pleased to confirm our firms interest in providingmaterialsinspectionandtestingservicesfortheproposedDentonTapSidewalk@RailroadCrossingprojectnotedaboveAscheduleofunitfeesforthisprojectisattached
After reviewing our fee schedule if you have any questions please contact the undersigned at9724448889IfacceptablepleasesignbelowandfaxbacktoourofficeasourAuthorizationtoProceedWelookforwardtotheopportunityofworkingwithyouonthisproject
Respectfully submitted
ALLIA E GEOTE NI ji G UP
AP
iietro
a in J El E LEED AP Robert P Nance
Pri cip
President
Approved by A
Date 11 t e 1
r
Signat re
MEMBER 3228 Halifax Street Dallas Texas 75247 ADVACILTel9724448889Fax9724448893wwwaggengrcomMAIMIM
SCHEDULE OF FEES
FOR
CONSTRUCTION MATERIALS ENGINEERING TESTING
DENTON TAP SIDEWALK @ RAILROAD CROSSING COPPELL TEXAS AGG PROPOSAL NO P11 1117C
DESCRIPTION OF SERVICES QUANTITY UNIT U FEE
A SIDEWALK SUBGRADE TESTING INSPECTION
Moisture Density Relationship of Soils ASTM D 698 @ 15000 each 000
Atterberg Limits @ 5000 each 000
Sidewalk Subgrade Density Test 3 test min trip 3 @ 1300 each 3900
Sr Engineering Tech to perform testing 2 @ 3700 hour 7400
Project Manager @ 7500 hour 000
Vehicle Charge 1 @ 3500 trip 3500
Sub Total 14800
B CONCRETE REINFORCING TESTING INSPECTION
Concrete Inspection Testing regular time 5 @ 3700 hour 18500
Concrete Inspection Testing over time @ 5550 hour 000
Concrete Cylinder Test 4 cyls per 100 cyd Sidewalks 4 @ 1400 each 5600
Project Manager 05 @ 7500 hour 3750
Vehicle Charge 2 @ 3500 trip 7000
Sub Total 53150
ESTIMATED TOTAL 60550
NOTES
1 Overtime rates of 15 times the regular hourly rate will be charged for hours worked over eight 8 hours
per day Monday thru Friday or any time before 700 am or after 500 pm Service performed on Saturdays
and Sundays will be billed at 15 times the regular hourly rate Services performed on recognized holidays
will be billed at 20 times the regular hourly rate WILL BE BILLED TO CONTRACTOR
2 All laboratory test fees are FOB our laboratory additional charge for sample pickup may apply
3 Any additional tests will be billed on a hourly rate and charged at the applicable rate portal to portal
4 Additional test not specified in this proposal will be quoted upon request
5 This proposal does not include any technician stand by non readiness charges and or trips or re tests of the
previous failing tests
6 The above unit rates are based on the following schedule by Mr George Marshall w the City of Coppell
1 trip for subgrade density testing
1 trip for concrete testing
1 trip for cylinder pick up
P11 11170