Avenue- PN140529 (2)***NOTICES TO CONTRACTOR***
THE CONTRACTOR(S) SHALL BE RESPONSIBLE FOR CONFIRMING THE LOCATION
(HORIZONTAL & VERTICAL) OF ANY BURIED CABLES, CONDUITS, PIPES AND
STRUCTURES (STORM SEWER, SANITARY SEWER, WATER, GAS, TELEVISION, ETC.)
WHICH IMPACT THE CONSTRUCTION SITE. THE CONTRACTOR(S) SHALL NOTIFY THE
OWNER OF ANY DISCREPANCIES FOUND BETWEEN THE ACTUAL CONDITIONS VERSUS
THE DATA CONTAINED IN THE CONSTRUCTION PLANS. ANY COSTS INCURRED AS THE
RESULT OF NOT CONFIRMING THE ACTUAL LOCATION (HORIZONTAL AND VERTICAL)
OF SAID CABLES, CONDUITS, PIPES AND STRUCTURES SHALL BE BORNE BY THE
CONTRACTOR(S). IF THE CONTRACTOR(S) DOES NOT ACCEPT THE EXISTING
TOPOGRAPHY AS SHOWN ON THESE PLANS, WITHOUT EXCEPTION, HE SHALL HAVE
MADE AT HIS EXPENSE A TOPOGRAPHIC SURVEY BY A REGISTERED PROFESSIONAL
ENGINEER OR A REGISTERED PROFESSIONAL LAND SURVEYOR AND SUBMIT IT TO THE
OWNER FOR REVIEW.
THE CONTRACTOR(S) SHALL CALL 1-800—DIGTESS FOR UTILITY LOCATIONS AND
MARKING AT LEAST 48 HOURS PRIOR TO ANY EXCAVATION OR CONSTRUCTION
ON THE SITE.
5EYD M.R. MAN500RY * ZAHRA MAN500RY
VOL. 2004194, PG. 9769, O.P.R.D.C.T.
I' WIDE WALL I 20' INGRE55 * EGRESS EASEMENT
0X
2' COLUMN VOL. 2004196, PG. 8791 , O.P.R.D.C.T.
CM I EA5T 153.73'
1/2"1RF — — — — — --1=�
CAPPED
3
ISO
I�z
lO
PC
1.7GG
EX. 4' DIA. SAN SWR. MH
�o W CONNECT PROP. 6" SWR.
Q FUTURE O LU
d- — COMMUNITY CENTER
0 LD rn F N
Ot\ ° D�° z
0n °° ..
N 00002'05" E 0 rnl EX. 8"" SAN. SWR. E� 0
25.00'
D
__ __ __ __ Ct -u
EAST 50.0' _
F-7
FOOT WIDE STRIP OF LAND BEING THE NORTH 25 FEET OF LOT 34 10
DESCRIBED IN rn INSTALL: O
VOL. 2004193, PG. 7776, EXHIBIT D, O.P.R.D.C.T. ( 1-8" GATE VALVE
i -DBL DET. CHECK &AULT >
_ 145.00 _I Q �0 ? F-
S 89°57'37" E
I000 POINT 150 pR°
woq LLJ
�
PROP 24" STORM PROPOSED I m N
r„ FIRE HYDRANT
U
' HIM NRY� PRO 8" WA ER
UMP TER ALL F I R E L A N E rnl ( IVATE) x
NCL 'L TH
S N FIRE HYDRANT
— UTILITY VAULT w
I O' X 10 TRANSFORMER I UTILITY VAULT LOx
PAD EASEMENT
T�so co so Pr. TIf-I..TC;C; L (0.. EXISTING
VOL. 71084, PG. 678, D.R.D.0 T•— PART OF ET 34 +
Ho5.PG.G .M.— FEDESI (TA ®- _._ 1 $ (j y� 4 FIRE HYDRANT
..•.0 VOL 45 Pu. 65. M.RD.C.T.- _- .. S iP \I •` / ..•,.•. fi\ £ W
H
INSTALL: w
1-8' XS"TAPPING SLEEVE & 8"
GATE VALVE
CONN. TO EX. 8" WATER
WMH
PROP. z2S' RCBC
ss
s
,s6J w
)
a°e
1. ELECTRIC, TELEPHONE, CABLE ETC. CONDUITES
W/PULL WIRE TO BE INSTALLED BY GC, WHERE
NECESSARY, BEFORE POURING THE CONCRETE.
GC/OWNER TO COORDINATE WITH UTILITY
COMPANIES FOR INSTALLING NEW UTILITIES.
2. ALL MEP CONDUITS NEEDS TO BE IN PLACE
BEFORE POURING THE CONCRETE PAVEMENT.
GC TO COORDINATE WITH UTILITY COMPANIES TO
INSTALL CONDUITS FOR ELECTRIC, GAS, TELEPHONE
& CABLE LINES.
3. ALL THE HANDICAP SPACES ARE 2% MAX.
SLOPE AT ANY DIRECTION
4. ALL IRRIGATION CONDUITS NEEDS TO BE PLACED
BEFORE POURING CONCRETE/
5. ALL HANDICAP ROUTE AND SIDEWALK SHALL BE
MAX. 2% CROSS SLOPE AND MAX. 5%
LONGITUDINAL SLOPE.
LEGEND
n
LOCATION MAP
(NOT TO SCALE)
0' 20' so' @10'
Scale 1"=30'
PP _
Power Pole
GW
Guy Wire
MH
Manhole
WV
Water Valve
TP
Telephone Pedestal
WM
Water Meter
FH
Fire Hydrant
LP
Light Pole
ICV
Irrigation Control Valve
CO
Clean Out
AC
Air Conditioner
TV
Cable Box
SB
Signal Box
SP
Signal Pole
SN
Sign
IRF
Iron Rod Found
IRS
Iron Rod Set
SS
Sanitary Sewer
SW
Storm Sewer
EB
ELECTRIC BOX
TBOX
TELEPHONE BOX
EM
METER BOX
GM
GAS METER
GMK
GAS MARKER
GV
GAS VALVE
B
BOLLARD
TMK
TELEPHONE MARKER
TPAD
TRANSFORMER PAD
V
VAULT
MBOX
METER BOX
18" RCP
REINFORCED CONCERETE PIPE
SSMH
SANITARY SEWER MANHOLE
TELMH
TELEPHONE MANHOLE
SL
SERVICE LIGHT
GL
GROUND LIGHT
REVISED
CIT(OP COPPELL
PLANNING & ZONING DEPARTMENT
U
SCALE:
ZO
111=20'
DRAWN:
<o
W
C
S.I.A.
Owzn
cc
w
r
SHEET NO:
1
z
0_
O
z
X
O
z
O
N
N
V
z<
J
W�
j
Z
w
O
z
O
z
�:n
O
W
r')
o
-j
w vi
~ W o
V)w
w
N� o
N
z
U
wME
O1.,n
Z3
�°
Opp L
a�
a�
``
3 a,
Z
O
N L N-00
Lj N
J
F-
LA
LL Y R
3ON
>-W
oF'a)E
in I- w
U
SCALE:
11/11/13
111=20'
DRAWN:
<o
W
C
S.I.A.
Owzn
cc
Lu
r
SHEET NO:
1
LU
O
m
X
``mow
VJ
�
z
J
z<
LLJ
X
0z00
r)
O
z
O
z
U
W
r')
I � � I � -1-11 lizol �
Q Q Q
M m m
�
U) U)
U U U
LLI
a
00 I- cD Ln 't r") N O
z
V)
o -Z Q
wN �
Of �
q Lew f-
aow z
w z wP3
�zO �Ln
�— dOZ �1
wwwU�
�>J Oak
' � W Q Lam;
cvi)O
V)
L F -a
Q o
LLI
a. J L- Z m
mo °a
zo�D
za - 0z—.
�cn"r w>
�W� "m
ILL, zL,� Q 0
m 07-0 -j L,
a °~W QX
w� No
— NwprD =
N wow Low1--
=zm� _D
�=)< �Q
47c
v uj: o
° .ate ¢0
�
i UTILITY
PLAN
DATE:
SCALE:
11/11/13
111=20'
DRAWN:
CHECKED BY:
T.A.
S.I.A.
PROJECT #
013024.00
SHEET NO:
1