Loading...
Blackberry Farm- PN140130 DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Blackberry Farm,Final Plat, a final plat to subdivide 54.8 acres of property to permit the development of 82 single-family lots and five (5) common area lots located on the north side of Sandy Lake Road, approximately 750 feet northeast of Starleaf Street (extended), at the request of Creststone Group, Ltd., being represented by L. Lynn Kadleck, Kadleck& Associates. STAFF REP.: Marcie Diamond PROJECT ID#FPR-14-0004 DRC DATE: January 30,2014 and February 6, 2014 CONTACT: Michael Garza,P.E.,Asst. Director of Engineering, 972-304-7019 COMMENT STATUS: VPRELIMINARY FINAL REVISED AFTER P&Z 1. There will be additional comments during detailed engineering plan review. 2. What is the status of the CLOMR and the wetlands determination? 3. All drainage easements in common areas will be maintained by HOA. 4. Add a water line stub out between lots 8&9 Block D and include it in a utility easement. 5. What happened to the access easement at the end of Huckleberry Ct? 6. Clear up the dimensions on Detail "A". 7. Add the CLOMR case number on the floodplain. 8. Show the existing floodplain line.