Eckerd's-LR 990209 GEOTECHNICAL ENGINEERING
o ENVIRONMENTALCONSULTING GEE Consultants, Inc.
CONSTRUCTION MATERIALS TESTING
10046 Monroe Drive · Dallas, Texas 75229 ° (214) 352-5433 · Fax (214) 352-6972
REPORT OF CONCRETE MIX INSPECTION
Report Date: Februa_D., 9. 1999 Date Concrete Placed: January 12. 1999 Standard 6'xl2"
Client: North American Properties-SW Area 28.27 Souare Inches
Project: Eckerds - Coppell Concrete Report No.: 6
Contractor: C.A. Walker Project No.: 298-04i2
Concrete Supplier and Plant: TXI Plant/#41
Location of Placement: Slab
MATERIALS ~ ..... ~s. 8~tc, w,s. INSPECTION DATA
Descrtp,'m~ Lbsl('uYd)
Mix Number: 47 Time Sample Batched: 10:45 am
Cement: 5.5 Sacks Time Sampled: 11:20 am
Fly Ash: Sample Locanon: 20' S. & 35' w. of NE comer of building
Track/Ticket No: 643/1212706
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 68°F
Fine Aggregate: Concrete Range: 68°F
Admixtures: Slump Range (inches): 7 ~.~"
i Weather Conditions: Clear
Time Started: 09:30 am
2 Time Completed: 02:45 pm
Added Water: 15 Gallons Sample Air Content ~%): 2%
Total Cubic Yards Placed: 40
Required Strength I Lbs :sq.in.): 3.00(}
ECK 21 7 01 / 19/99 110.800 3,920
ECK 22 28 02/09/99 148.900 5.270
7 %"
ECK 23 28 02/09/99 148,740 5,260
ECK 24 H HOLD
-~STM C-31.C-39.C-143 .Unless No,ca O:~*r,,.se) Cylinders Made By: VW
Remarks and!or D~smbunon:
cc: Mr. John Maggiore - North American Properties -SW
Mr. Lance Lilly - Richmond Group Architecture & Planning
Mr. Ga~, Stokes - C.A. Walker Construction
Mr. Lee Stone - City of Coppell
Mr. Larp:' Davis - City of Coppell
Ail leuers and m~ts are :or ;he excl~ve ~e of r~ cliem ,o w~m t~y are add ~ ~ a~ s~ll ~ ~ r~d ~l tM ~11 ~al of GEE Comulm~. I~.
~r prior wr.mn ~rm'al. Our letters a~ m~ apply only co c~ sample [~t~ a~/~ i~t~ a~ are ~ ~ssanly i~u~ or't~ q~ntities of ~rently ~mi~l ~ s~md~ ~.