Loading...
Eckerd's-LR 990209 (3) GEOTECHNICAL ENGINEEKING · GEE Consultants, Inc. CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive ° Dallas, Texas 75229 ° (214) 352-5433 · Fax (214) 352-6972 REPORT OF MORTAR MIX INSPECTION Report Date: February. 9, 1999 Date Mortar Placed: February. 1, 1999 Client: NoI'th American Propenies-SW Standard 2"x2' Project: Eckerds Coppell, Texas Area 4 Square Inches Contractor: C.A. Walker Mortar Report No.: 1 Mortar Supplier and Plant: On-Site Project No.: 298-0412 Location of Placement: Wa]Is INSPECTION DATA Time Sample Batched: 02:45 pm Time Sampled: 02:53 pm Sample Location: Wall - Grid L from 1 to 6; H from 21'9" to 23'4" Temperature: Ambient Range: 67 ° F Mortar Range: 66°F Weather Condmons: Partly Cloudy Time Started: 02:00 pm Time Completed: 04:30 pm Total Cubic Yards Placed: N/A Required Strength ~Lbs./sq.m.!: N/A S~ecl.'cen ~.ge Date Total Load Compressi%e Strengm Remarks Numner :Days~ Tested ,Lbs. J iLbs.~Sq.ln.i ECK 01 7 02:'08/99 8,660 2,160 ECK 02 7 02/08/99 8.040 2,010 ECK 03 7 02/08/99 7,060 1.760 ECK 04 28 03/01/99 ECK 05 28 03/01/99 ECK 06 28 03/01/99 Test Methodn Utdizcfl Fracture Regular -XSTM C-;09 :Unless Noted t}tl~cr~,-~sc) Cubes Made By: AS Remarks aod/or Distnbutton: Mr. John Maggiore - Nnrth American Properties-SW Mr. Lance Lilly - Richmond Group Architecture & Planning Mr. Ga~' Stokes - C.A.Walker Construction Mr. Lar~ Davis - City. of Coppell Mr. Lee Stone - Cib' of Coppell All letters a' v wY: , . nd reports are ~br ihe cxclusi 'e use of the client to -horn they are addressed and shell not he reproduced wit~. the full approval of GEE Conaullants. Inc. The uae of our name must receiv~e our prior written approval. Our letters and reports .apply oni_v to the sample tested am:i/or inspected and are nm necessarily indicauve of the qu~l~lti~$ of apparently idcraicai or similar products.