Loading...
Eckerd's-LR 990209 (2)i G . GEOTECHNICAL ENGINEERING E GEE Consultants, Inc. E ,. CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive o Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: Februa_D, 9, 1999 Date Concrete Placed: January 12, 1999 Standard 6"x12' Client: North American Properties-SW Area 28.27 Square Inches Project: Eckerds - Coppell Concrete Report No.: 7 Contractor: C.A. Walker Project No.: 298-0412 Concrete Supplier and Plant: TXI Plm~t/#41 Location of Placement: Slab MATERIALS ,~o.~; .~t, Ba~, ~,~,. INSPECTION DATA Descnpuon , Lbs~CuYd) Mix Number: 4.7 Time Sample gatched: 12:09 pm Cement: 5.5 Sacks Time Sampled: t2:45 pm Fly Ash: Sample Location: 25' S. & 90' W. of NE comer of building Truck/Ticket No: ~36/1212882 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 68°F Fine Aggregate: Concrete Range: 71°F Admixtures: Slump Range dnchesl: 5" Weather Conditions: Clear I Time Started: 09:30 am 2 Time Completed: 02:45 pm Added Water: 10 Gallons Sample Air Content (%): 4% Total Cubic Yards Placed: 140 Reqmred Strength (Lbs.isq.in.): 3.000 Spec:men Measureo Age Date Total Load Compressive Strength Remarks %Ullqoer '~IuI"ID ~ 'n., , Da.','s ~ Tested ~Lbs. l / Lbs..'SQ.[ll. ) ECK 25 7 01 / 19/99 ! 12,120 3,970 ECK 26 28 02/09/99 157,200 5,560 5" ECK 27 28 02/09/99 165,000 5,840 ECK 28 H HOLD Te~,t Methods t.'tfl~zed Fracture Regular Cylinders Made By: VW ASTM C-31.C-39.C-1-1.3 ,Ltnless Notea Other'nqse.~ - Remarks and;or Distribution: cc: Mr. John Maggiore - North American Properties -SW Mr. Lance Lilly - Richmond Group Architecture & Planning Mr. Gar)' Stokes - C.A. Walker Construction Mr. Lee Stone - City of Coppell Mr. LarD.' Davis - City of Coppell