Eagle Point-CS 930125The City With A Beautiful Future
'-I-~ 25, 1993
P.O. Box 478
Coppell, Texas 75019
214-462-0022
Mr. Mike Daniel
Nathan D. Maler
Three Northpark
8800 N. Central Expy., Suite 300
Dallas, TX 75231
RE: Eagle Point Village
Development Fee Assessment
Dear Mr. Daniel:
Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy
of the development fee calculations for Eagle Point Village.
Please provide a check made payable to the City of Coppell in the amount of $138,973.11 plus
2% of the construction cost and forward it to Mr. Alan Johnson, Assistant Finance Director,
Finance Department, along with a copy of the fee assessment list. This should be provided prior
to City Council approval of the final plat. Also, please provide our office a copy of the
Engineer's Estimate or contract for this project so the construction inspection fee can be verified.
Please provide a copy of your paid receipt to our offices. Copies of your receipts will help us
verify payment of the required fees and assure a successful beginning of this project.
We look forward to working with you on this project. If you have any questions, please do not
hesitate to contact me.
Sincerely,
Kenneth M. Griffin, P.E.
City Engineer
Steve Goram, Director of Public Works
Alan Johnson, Assistant Finance Director
Greg Jones, Acting Building Official
Doug Stevens, Engineering Technician
CITY OF COPPELL
DEVELOPMENT FEES
Date:
Project:
January 25, 1993
Eagle Point Village
Park Fee
(50% due prior to Council Approval)
(50% due at Issurance of Building Permi0
Water Impact Fee
(100% due prior to Council Approval)
Water Tap Inspection Fee
(100% due at Issuance of Building Permit)
Wastewater Impact Fee
(100% due prior to Council Approval)
Sewer Tap Inspection Fee
(100% due at Issuance of Building Permi0
Utility Final Inspection Fee
(100% due at Issuance of Building Permi0
Water Meter Fee (Lots)
(100% due at Issuance of Building Permi0
Water Meter Deposit
(100% due at Issuance of Building Permit)
Street Sign Fee
(100% due prior to Council Approval)
Street Light Fee
(100 % due prior to Council Approval)
Street Escrow
(192.44' adjacent to Sandy Lake Road)
Construction Inspection Fee
(2% of Project Cost due prior to
Preconstmction Meeting)
Total
TOTAL
$ 16,500.00
$ 71,500.00'
$ 11,000.00
$ 49,500.00
$ 11,000.00
$ 5,500.00
$ 2,447.50
$ 3,300.00
$ 2,115.51
$ 7,607.60
$ **
$180,470.61
AMOUNT DUE
I'RIOR TO ~~
APPROVAL
$ 8,250.00
$ 71,500.00'
$ -0-
$ 49,500.00
$ -0-
$ -0-
$ -0-
$ -0-
$ 2,115.51
$ 7,607.60
$ **
$138,973.11
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $
138,973.11
+2% inspection fee
The water impact fees do not include the fees for the irrigation meters.
To be determined (current escrow $160.00/1.f.).
COPPELL PUBLIC WOHK$
January 22, 1993
Ken Griffin, City Eng~n~r
Public Works Staff
Village
Development Fees for Eagle Point
The following fees should be assessed and collected on the above
referenced project.
Water Impact Fee:
110 - 5/8" x 3/4"
Domestic Meter/s =
Irrigation Meter/s =
110 ESU's
ESU's
Total 110 ESU's ~ $650.00 ea = $ 71,500.00
100% due prior to Council approval of the final plat.
This assessment does not include irrigation impact.
Wastewater Impact (CityJ
110 - 5/8" x 3/4" Residential Meters = 110 ESU's
Total 110 ESU's ~ $450.00 ea = $49,500.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
110 Connections ~ $100.00 each = $ 11,000.00
100% due prior to issuance of building permit. (Or in the case of
the irrigation meter-prior to issuance of meter).
Sewer Tap Inspection Fee
110 Connections @ $I00.00 each = $I1,000.00
100% due prior to issuance of building permit.
Development Fees
Page 2
Utility Final Inspection Fee
110 lots @ $50.00/lot = $5,500.00
100% due prior to issuance of building permit.
Water Meter Fee {Lots)
110 - %" x ~" Residential Meters @ $22.25 ea
100% due prior to issuance of building permit.
= $2,447.50
Water Meter Deposit
Residential - 110 meters ~ $30.00 ea = $3,300.00
100% due prior to issuance of building permit.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric
submits the lighting plan for the proposed project. Once
plan is submitted $292.60 per light will be assessed.
Street Signs Fee
See attached Street Sign Assessment sheet.
100% due prior to final acceptance of project.
Park Fee
I10 Residential Lots at $I50.00 each = $ 16,500.00
Units (Multi family) at $75.00 each = $
For those developments having preliminary plat approval prior to
June 23, 1992 the following assessment is determined:
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Development Fees
Page 3
For those developments having preliminary plat approval after June
23, 1992 the following assessment is determined:
Residential Lots at $350.00 each = $
Units (Multi-Family) at $350.00 each = $
50% of the amount specified above shall be paid by the Developer
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please
advise.
HLP / dm
Steven G. Goram
Director of Public Works
DEVFEES . HLP
Development Fees
Page 4
STREET SIGN ASSESSMENT
for Eaqle Point Villaqe
The following assessments being made in accordance with the City of
Coppell Subdivision Ordinance Appendix A Chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
SIGN UNIT PRICE OUANTITY EXTENDED PRICE
No Parking $53.10
Speed Limit $63.54 18 1,143.72
Yield $58.56
Stop $65.12
Street Name $11.60
Stop & Street Combo $96.85 9 871.65
OTHER
No Outlet 63.54 1 63.54
Street Name w/pole 36.60 1 36.60
TOTAL $2,115.51
Cost breakdowns may be obtained from Public Works by written
request.
DEVFEES.HLP Revised 12/15/92
DATE:
TO:
FROM:
RE:
COPPELL PUBLIC WORKS
MEMORANDUM
January 21, 1993
Doug Stevens, Eng. Technician ~
Rey Gonzales, Streets Superintendent
Street Light Assessment - Eagle Point Estates
The following assessment represents the number of light units as
established by T.U. Electric for this subdivision. Please insure
that the developer receives a copy of this assessment and that the
fee is paid prior to final acceptance. Thank you.
26 lights @ $292.60 per light - $7,607.60
If you have any questions, please call.
RG/bc
cc: Central File
STLTEAG.RG