ST03-01C_Tiseo Email Pricing1
George Marshall
From:Shane Pate <spate@TiseoPaving.com>
Sent:Tuesday, September 16, 2014 8:15 AM
To:George Marshall
Subject:RE: ST03-01C Bethel Coppell Road
Attachments:image001.png; image002.png; image003.png; image004.png; image005.png
Our pricing will stand. No effect to any of these quantities
Shane Pate
Estimator- Tiseo Paving Company
(972-289-0723)Office
(972-216-5637)Fax
(469-446-6532)Cell
From: George Marshall [mailto:GMarshall@coppelltx.gov]
Sent: Monday, September 15, 2014 4:30 PM
To: Shane Pate
Cc: Robert Caudill; Lance Smith
Subject: RE: ST03-01C Bethel Coppell Road
Shane,
As discussed on the phone, This is the list from Freese regarding the quantity differences. Please let me know if any of
this would affect pricing.
Thank You, George
Bethel/Coppell Rd Quantity Check - Friday 9-12-14
Item Description Unit Measured Qty Bid Plans Qty Diff T
109 Concrete Removal SY 1868 1631 237 $ 6.50
121 6" Reinforced Concrete Driveways SY 1492 2002 ‐510 $ 63.00
133 4" White Acrylic Double Reflective Button EA 28 12 16 $ 3.45
134 4" White Acrylic Single Reflective Button EA 54 12 42 $ 3.45
137 Pavement Marking Symbols EA 6 2 4 $ 450.00
142 18" RCP LF 27 6 21 $ 71.00
156 Gabion Baskets (Bedding and Geotextiles Included) CY 301 110 191 $ 230.00
George Marshall, P.E.
Traffic Engineer
Engineering Department
City of Coppell, TX
www.coppelltx.gov
972-304-3562 (office)
2
469-964-4731 (cell)
Please take our customer service survey
From: Shane Pate [mailto:spate@TiseoPaving.com]
Sent: Friday, September 12, 2014 12:13 PM
To: George Marshall
Cc: Robert Caudill; Lance Smith
Subject: Re: ST03-01C Bethel Coppell Road
We would prefer starting in early January if all utilities are cleared and row issues are resolved.
Utilities= four star
Excavation= rpmx
Electrical= mels
Flatwork= axis
Striping= metroplex
Box culvert and rail= Iowa bridge
Sent from my iPhone
(Sorry for misspelled words)
On Sep 12, 2014, at 12:07 PM, "George Marshall" <GMarshall@coppelltx.gov> wrote:
Shane,
Assuming we award this project at the September 23rd Council meeting by the time we get contract
documents signed etc… When would your firm prefer to go to construction. Also, please send me a list
of your subs as soon as possible.
Thank You, George
George Marshall, P.E.
Traffic Engineer
Engineering Department
City of Coppell, TX
www.coppelltx.gov
972-304-3562 (office)
469-964-4731 (cell)
<image001.png>
<image002.png><image003.png> <image004.png> <image005.png>
Please take our customer service survey
3