Loading...
ST03-01C_Tiseo Email Pricing1 George Marshall From:Shane Pate <spate@TiseoPaving.com> Sent:Tuesday, September 16, 2014 8:15 AM To:George Marshall Subject:RE: ST03-01C Bethel Coppell Road Attachments:image001.png; image002.png; image003.png; image004.png; image005.png Our pricing will stand. No effect to any of these quantities    Shane Pate Estimator- Tiseo Paving Company (972-289-0723)Office (972-216-5637)Fax (469-446-6532)Cell   From: George Marshall [mailto:GMarshall@coppelltx.gov] Sent: Monday, September 15, 2014 4:30 PM To: Shane Pate Cc: Robert Caudill; Lance Smith Subject: RE: ST03-01C Bethel Coppell Road   Shane,    As discussed on the phone, This is the list from Freese regarding the quantity differences.  Please let me know if any of  this would affect pricing.    Thank You, George  Bethel/Coppell Rd Quantity Check - Friday 9-12-14       Item Description Unit Measured Qty Bid Plans Qty Diff T 109 Concrete Removal SY 1868 1631 237 $       6.50  121 6" Reinforced Concrete Driveways SY 1492 2002 ‐510 $     63.00  133 4" White Acrylic Double Reflective Button EA 28 12 16 $       3.45  134 4" White Acrylic Single Reflective Button EA 54 12 42 $       3.45  137 Pavement Marking Symbols EA 6 2 4 $  450.00  142 18" RCP LF 27 6 21 $     71.00  156 Gabion Baskets (Bedding and Geotextiles Included) CY 301 110 191 $  230.00                             George Marshall, P.E. Traffic Engineer Engineering Department City of Coppell, TX www.coppelltx.gov 972-304-3562 (office) 2 469-964-4731 (cell) Please take our customer service survey   From: Shane Pate [mailto:spate@TiseoPaving.com] Sent: Friday, September 12, 2014 12:13 PM To: George Marshall Cc: Robert Caudill; Lance Smith Subject: Re: ST03-01C Bethel Coppell Road   We would prefer starting in early January if all utilities are cleared and row issues are resolved.    Utilities= four star  Excavation= rpmx  Electrical= mels  Flatwork= axis  Striping= metroplex   Box culvert and rail= Iowa bridge    Sent from my iPhone  (Sorry for misspelled words)    On Sep 12, 2014, at 12:07 PM, "George Marshall" <GMarshall@coppelltx.gov> wrote:  Shane,     Assuming we award this project at the September 23rd Council meeting by the time we get contract  documents signed etc… When would your firm prefer to go to construction. Also, please send me a list  of your subs as soon as possible.     Thank You, George     George Marshall, P.E.  Traffic Engineer  Engineering Department City of Coppell, TX www.coppelltx.gov 972-304-3562 (office)  469-964-4731 (cell) <image001.png> <image002.png><image003.png> <image004.png> <image005.png> Please take our customer service survey  3