Eckerd's-LR 990125 G · GEOTECHNICAL ENGINEERING
E GEE Consultants,
Inc.
E · CONSTRUCTION MATERIALS TESTING
10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972
REPORT OF CONCRETE MIX INSPECTION
Report Date: Jarluary 25, 1999 Dat~ Concrete Place. d: Jallua_rs/ 12, 1999 Standard 6~x12''
Client: NorT, h Araefican Properties-SW Area 28.27 Square Inches
Project: Eckerds - Coppell Concrete Repor~ No.: 6
Contractor: C.A. Walker Project No.: 298-0412
Concrete Supplier and Plant: TXI Plant/#41
Location of Placement: Slab
MATERIALS s~e: ssD a.,~h w.. INSPECTION DATA
Descnp~io~ (Lbs/CuYd)
Mix Number: 47 Time Sample Batched: 10:45 am
Cement: 5.5 Sacks Time Sampled: 11:20 am
Fly Ash: Sample Location: 20' S. & 35' W. of NE comer of budding
Coarse Aggregate: Truck/Ticket No: 643/1212706
Intermediate Aggregate: Temperature:
Ambient Range: 68°F
Fine Aggregate: Concrete Range: 68°F
Admixtures: Slump Range (inches):
I Weather Conditions: Clear
Time Started: 09:30 am
2 Time Completed: 02:45 pm
Added Water: 15 Gallons Sample Air Content ( % ): 2
Total Cubic Yards Placed: 40
Required Strength (Lbs./sq.in.): 3,000
Spec[men Measured Age Dale Tmai Load Compressive Strength
Remarlcs
Number Slump ~n.) , Da~s) Tested (Lbs.) , Lbs.:Sq.ln. )
ECK 2! 7 01/19/99 110,800 3,920
ECK 22 28 02/09/99
7V:"
ECK 23 28 02/09/99
ECK 24 H HOLD
Tes! Methods Utilized Fracture Regular
~,STM C-31.C-39.C-:43 ~Unless Nm Othe~,se~ Cylinders Made By: VW
Remarks and/or Distribution:
cc: Mr. John Maggiore - North American Properties -SW
Mr. Lance Lilly - Richmond Group Architecture & Planning
Mr. Gary Stokes - C.A. Walker Construction
Mr. Lee Stone - City of Coppell
Mr. Larry. Davis - City of Coppell
All ,L~rSp.:: ~ ~rova, Our let ~: a~;¥ i-~nt~l~ s°Tm::p~.ire