Loading...
Eckerd's-LR 990125 (3) G ° GEOTECHNICAL ENGINEERING E o ENVIRONMENTAL CONSULTING GEE Consultants, Inc. E· CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: Jarluary 25, 1999 Date Concrete Placed: Jarluary 12, 1999 Standard 6"x12" Client: North American Properties-SW Area 28.27 Square Inches Project: Eckerds - Coppell Concrete Report No.: 8 Contractor: C.A. Walker Project No.: 298-0412 Concrete Supplier and Plant: TXI Plant/#41 Location of Placement: Slab MATERIALS sou~, sso B,~h ,~. INSPECTION DATA Descrtption ~.Lbs~CuYd) Mix Number: 47 Time Sample Batched: 01:20 pm Cement: 5.5 Sacks Time Sampled: 01:42 pm Fly Ash: Sample Location: 25' S. & 25' E. Of NW comer of building Track/Ticket No: 836/1212986 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 71 °F Fine Aggregate: Concrete Range: 71°F Admixtures: Slump Range (inches1: 5" I Weather Conditions: Clear Time Started: 09:30 am ~ Time Completed: 02:45 pm Added Water: 10 Gallons Sample Air Content (%): 3% Total Cubic Yards Placed: 180 Required Strength (Lbs.isq.in.): 3.000 Specimen Measured Age Date Total Load Compressive Strength Number Slumo un. ) ~ Days I Tested ~ Lbs. ~ rLbs..'Sq. In. I Remarks ECK 29 7 01/19/99 134,800 4,770 ECK 30 28 02/09/99 5" ECK 31 28 02/09/99 ECK 32 bi HOLD Test Methods Utilized Fracture Regular ASTM C-31,C-39.C-143 ~Unleas Norad Otherw,se} Cylinders Made By: MW Remarks and/or Distribution: cc: Mr. John Maggiore - North American Properties -SW Mr. Lance Lilly - Richmond Group Architecture & Planning Mr. Gary. Stokes - C.A. Walker Construction Mr. Lee Stone - City of Coppell Mr. Larry Davis - City of Coppell Al out prmr wr:tlen approval. Our !ezters and repom apply only to the sample rested and/De'. . 'mpected and are Dui: mceasan y ....... ndmarwe °f fl~e quann~'es ot a0parently tdem~cal of s'm'lar products' [nc. The ~,e of our name must rTwe