Eckerd's-LR 990125 (3) G ° GEOTECHNICAL ENGINEERING
E o ENVIRONMENTAL CONSULTING GEE Consultants,
Inc.
E· CONSTRUCTION MATERIALS TESTING
10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972
REPORT OF CONCRETE MIX INSPECTION
Report Date: Jarluary 25, 1999 Date Concrete Placed: Jarluary 12, 1999 Standard 6"x12"
Client: North American Properties-SW Area 28.27 Square Inches
Project: Eckerds - Coppell Concrete Report No.: 8
Contractor: C.A. Walker Project No.: 298-0412
Concrete Supplier and Plant: TXI Plant/#41
Location of Placement: Slab
MATERIALS sou~, sso B,~h ,~. INSPECTION DATA
Descrtption ~.Lbs~CuYd)
Mix Number: 47 Time Sample Batched: 01:20 pm
Cement: 5.5 Sacks Time Sampled: 01:42 pm
Fly Ash: Sample Location: 25' S. & 25' E. Of NW comer of building
Track/Ticket No: 836/1212986
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 71 °F
Fine Aggregate: Concrete Range: 71°F
Admixtures: Slump Range (inches1: 5"
I Weather Conditions: Clear
Time Started: 09:30 am
~ Time Completed: 02:45 pm
Added Water: 10 Gallons Sample Air Content (%): 3%
Total Cubic Yards Placed: 180
Required Strength (Lbs.isq.in.): 3.000
Specimen Measured Age Date Total Load Compressive Strength
Number Slumo un. ) ~ Days I Tested ~ Lbs. ~ rLbs..'Sq. In. I Remarks
ECK 29 7 01/19/99 134,800 4,770
ECK 30 28 02/09/99
5"
ECK 31 28 02/09/99
ECK 32 bi HOLD
Test Methods Utilized Fracture Regular
ASTM C-31,C-39.C-143 ~Unleas Norad Otherw,se} Cylinders Made By: MW
Remarks and/or Distribution:
cc: Mr. John Maggiore - North American Properties -SW
Mr. Lance Lilly - Richmond Group Architecture & Planning
Mr. Gary. Stokes - C.A. Walker Construction
Mr. Lee Stone - City of Coppell
Mr. Larry Davis - City of Coppell
Al out prmr wr:tlen approval. Our !ezters and repom apply only to the sample rested and/De'. . 'mpected and are Dui: mceasan y ....... ndmarwe °f fl~e quann~'es ot a0parently tdem~cal of s'm'lar products' [nc. The ~,e of our name must rTwe