Loading...
Eckerd's-LR 990121 GEOTECHNICAL ENGINEERING · ENVIRONMENTAL CONSULTING GEE Consultants, Inc. CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 ° Fax (214) 352-6972 GENERAL REPORT SIEVE ANALYSIS Report Date: January 21, 1999 Test Date: lanuary 18, 1999 Client: North American Properties General Report No.: 1 Project: Eckerds Project No: 298-0412 Coppell, Texas Identification: Sieve Analysis of Road Mixed Material (lime treated) Method of Test: TEX-101-E Page 1 of 1 Results Specifications SDI-IPT Item 260 - 1972 Actual Percent Passing Minimum Percent Passing Location 1'/4 ~ieve #4" ~ieve 13A'' Sieve #4 Sieve North side of building 100% 66. 1% 100 60 West side of building 100% 74.5 % 100 60 South side of building 100% 62.0% 100 60 Tests meet project specifications Technician: AS cc: Mr. John Maggiore - North American Properties Mr. Lance Lilly - Richmond Group Mr. Gary. Stokes - C. A. Walker Construction Mr. Lee Stone - Ci~' of Coppell Mr. Larry. Davis - City of Coppell Our leu~rs and reports arc for thc exclusive use of thc client to whom they arc addressed. The usc of our name must recczve our r w ' v . apply only to the sample tested and/or inspected, and are not necessarily indicative of thc quantities of apparently identical or similar products.