Eckerd's-LR 990121 GEOTECHNICAL ENGINEERING
· ENVIRONMENTAL CONSULTING GEE Consultants,
Inc.
CONSTRUCTION MATERIALS TESTING
10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 ° Fax (214) 352-6972
GENERAL REPORT SIEVE ANALYSIS
Report Date: January 21, 1999 Test Date: lanuary 18, 1999
Client: North American Properties General Report No.: 1
Project: Eckerds Project No: 298-0412
Coppell, Texas
Identification: Sieve Analysis of Road Mixed Material (lime treated)
Method of Test: TEX-101-E Page 1 of 1
Results
Specifications
SDI-IPT Item 260 - 1972
Actual Percent Passing Minimum Percent Passing
Location 1'/4 ~ieve #4" ~ieve 13A'' Sieve #4 Sieve
North side of building 100% 66. 1% 100 60
West side of building 100% 74.5 % 100 60
South side of building 100% 62.0% 100 60
Tests meet project specifications
Technician: AS
cc: Mr. John Maggiore - North American Properties
Mr. Lance Lilly - Richmond Group
Mr. Gary. Stokes - C. A. Walker Construction
Mr. Lee Stone - Ci~' of Coppell
Mr. Larry. Davis - City of Coppell
Our leu~rs and reports arc for thc exclusive use of thc client to whom they arc addressed. The usc of our name must recczve our r w ' v .
apply only to the sample tested and/or inspected, and are not necessarily indicative of thc quantities of apparently identical or similar products.