WA9302A-CS 960206 (3) Shimek, Jacobs & Finklea
CITY OF COPPELL
VILLAGE PARKWAY PUMP STATION ADDITION
PROJECT NO. WA-91102
PRE-CONSTRUCTION CONFERENCE
February 6, 1996, 2:00 p.m.
AGENDA
1) Introductions (Attendance Sheet)
2) Contractor's Superintendents & Phone Numbers (Item 1.30):
· Day Time No.
Night Time No.
Mobil Number
· Day Time No.
Night Time No.
Mobil Number
3) City of Coppell on site representatives:
· Larry_ Davis - Chief Inspector Day Time No.
Night Time No.
Mobil Number
· Garreth Campbell Day Time No.
Night Time No.
Mobil Number
4) Subcontractors (Item 1.46):
·
·
·
5) Utility Companies:
· Lone Star Gas:
· TU Electric:
· G.T.E.
· Paragon Cable
Shlmek. Jacobs & Finklea
City of Coppell
Village Parkway Ground Storage Reservior No. 2
Pre-Construction Conference Agenda
February 6, 1996
Page No. 2
6) Contract Documents:
7) Construction Plans and Specifications (SC.28):
8) Permits (Item 1.23):
9) Insurance Certificates (Item 1.26):
10) Contractor's Construction Schedule (SC. 11):
11) Contractor's Projected Cash Flow (Item 1.22.5):
12) Trench Safety Plan (SC.09)
13) Project Sign (SC.32)
14) Working Area and Project Sequence; Coordination with Others (Items 1.32, 1.29)
15) Sanitary Provisions (Item 1.29.1)
16) Shop Drawing Submittals (Item 1.28)
17) Water for Construction -- Temporary Meter (Section 2, Item 2.21)
18) Line and Grade (Section 2, Item 2.9)
19) Work Order -- Time of Completion (Item 1.13, Item 1.16)
20) Contract Time, Working Days, Overtime Notification (Section 2, Item 2.19)
21 ) Monthly Pay Request, 5% Retainage (Item 1.51 )
22) Extra Work and Change Orders (Item 1.38)
23) Materials Testing and Quality Control (SC.25):
·
· Field Representative: Phone No.
24) Maintenance Bond (SC-1.15)
25) Final Inspection & Acceptance (Item 1.51.3)
26) Construction Record Drawings
27) Additional or Miscellaneous Comments
""
Coppell, Texas 75019
The City With A Beautiful Future 214- 462- 0022
PRE-CONSTRUCTION PACKET
ATI~ENDANCE SHEET
NAME: COMP ANY: PHONE:
(1)