Eckerd's-LR 990105 (2) G · GEOTECHNICAL ENGINEL,,JNG
E GEE Consultants,
Inc.
E ° CONSTRUCTION MATERIALS TESTING
10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 ° Fax (214) 352-6972
REINFORCING STEEL PLACEMENT
Report Date: January 5, 1999 Test Date: January 5, 1998
Client: North American Properties-SW General Report No.: 4
Project Eckerds - Coppell, Texas Project No.: 298-0412
Identification Reinforcing Steel Inspection
Method of Test Visual Inspection
Page 1 of 1
Results
On January 5, 1998. reintbrcing steel was inspected at the following location:
Grade Beams of Main building
B from I to 9
9 from B to L
L from 1 to 9
1 from B to L
There were no discrepancies.
Tech: HG
cc: Mr. John Maggiore - North American Properties-SW
Mr. Lance Littly - Richmond Group
Mr. Gary. Stokes - C.A. Walker Construction
Mr. Lee Stone - CiB' of Coppell
Mr. Larry Davis - Cit').' of Coppell